Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Is Maxim a good developer?, Projects: TheAddress Citylights Majestic

views
     
TSPerspective2021
post Sep 21 2021, 11:53 AM, updated 5y ago

Getting Started
**
Junior Member
178 posts

Joined: Feb 2021
Anyone know this developer well?

Here are some of their projects:
1. Maxim Citilights, Sentul
2. Maxim Residences, Cheras
3. Majestic Maxim, Cheras
4. The Address, Taman Desa

Wanna hear more from the owners of these projects.

Check out some of their past reputation, doesnt sound good to me:
1. https://forum.lowyat.net/index.php?showtopi...post&p=92746581
user posted image

2. Parts of condo under construction collapse at Taman Desa
www.edgeprop.my/content/1645447/flash-parts-condo-under-construction-collapses-taman-desa
ZacYys
post Sep 21 2021, 07:32 PM

Getting Started
**
Junior Member
106 posts

Joined: Feb 2016
T
tongyk
post Sep 22 2021, 01:47 AM

KamKam
*****
Senior Member
883 posts

Joined: May 2007
QUOTE(Perspective2021 @ Sep 21 2021, 11:53 AM)
Anyone know this developer well?

Here are some of their projects:
1. Maxim Citilights, Sentul
2. Maxim Residences, Cheras
3. Majestic Maxim, Cheras
4. The Address, Taman Desa

Wanna hear more from the owners of these projects.

Check out some of their past reputation, doesnt sound good to me:
1. https://forum.lowyat.net/index.php?showtopi...post&p=92746581
user posted image

2. Parts of condo under construction collapse at Taman Desa
www.edgeprop.my/content/1645447/flash-parts-condo-under-construction-collapses-taman-desa
*
So far they're delivering their projects to be completed. Nothing much to complaint.

For Majestic, I don't think will be as same as Maxim Residences, there are almost 2k residents there.
TSPerspective2021
post Sep 22 2021, 10:24 AM

Getting Started
**
Junior Member
178 posts

Joined: Feb 2021
But one of the condo under construction by Maxim collapsed last year...
tongyk
post Sep 22 2021, 09:40 PM

KamKam
*****
Senior Member
883 posts

Joined: May 2007
QUOTE(Perspective2021 @ Sep 22 2021, 10:24 AM)
But one of the condo under construction by Maxim collapsed last year...
*
That's The Address. Pinnacles Sri Petaling, and Exsim also been collapse while under construction. That's quite common nowadays.
.iuforever.
post Sep 22 2021, 11:08 PM

Getting Started
**
Junior Member
63 posts

Joined: Aug 2021
just google search their google review, not so good if talking about building quality oh.. but only one bad review in written way lah..


user posted image
Leroi2x
post Sep 30 2021, 12:56 PM

Enthusiast
*****
Junior Member
701 posts

Joined: Oct 2009
I looking at their new rumahwip
But found this collapse case ,now donno should proceed or not
Chris_Inch
post Dec 12 2023, 04:39 PM

Getting Started
**
Junior Member
81 posts

Joined: Sep 2021


Sorry to revive this post. But this is a terrible developer. Just terrible. Quality and workmanship are bad. Aftersales service is terrible. Post-VP, management office is not responsible. Defects are not repaired and left to rot. Doesn't want to return renovation deposit.
Chuffling
post Jan 29 2024, 11:17 PM

Getting Started
**
Junior Member
153 posts

Joined: Feb 2014
The new development at Taman Desa... Bukit Desa side has caused the roads around Jugra to flood when it rains. Mud everywhere. Mud/ water flow into some of the terrace houses there. It's terrible.
Chuffling
post Jan 31 2024, 08:48 PM

Getting Started
**
Junior Member
153 posts

Joined: Feb 2014
QUOTE(Chris_Inch @ Dec 12 2023, 04:39 PM)
Sorry to revive this post. But this is a terrible developer. Just terrible. Quality and workmanship are bad. Aftersales service is terrible. Post-VP, management office is not responsible. Defects are not repaired and left to rot. Doesn't want to return renovation deposit.
*
No need to say sorry. Getting info from actual buyers is necessary.
Chris_Inch
post Feb 5 2024, 10:31 AM

Getting Started
**
Junior Member
81 posts

Joined: Sep 2021


QUOTE(Chuffling @ Jan 31 2024, 08:48 PM)
No need to say sorry. Getting info from actual buyers is necessary.
*
16 months in, 1st AGM is still not called. Asked the staff on ground, he said he is not aware of the need to call for AGM. Useless..
Chanzeryl
post Mar 5 2024, 04:07 PM

On my way
****
Junior Member
645 posts

Joined: Jan 2023
NOPE

 

Change to:
| Lo-Fi Version
0.0174sec    0.57    5 queries    GZIP Disabled
Time is now: 24th November 2025 - 08:35 PM