






Seeking ways to design & renovate your house?, Happy Learning Together!
|
|
Sep 29 2023, 03:53 PM
Return to original view | Post
#281
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
|
|
|
|
|
|
Oct 10 2023, 11:07 PM
Return to original view | IPv6 | Post
#282
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
Hi all, today we are going to check out a refurbishment project for terrace housing done by us, My Maison. Let us talk about some works we had done for the owner, with some of our thoughts with you!๐๐
As you can see from the exterior, the owner wishes to have some dark grey contemporary colour scheme design. Light grey colour serves as the base colour for wall accompanied by dark grey colour framing along the column and roof beam at the first floor. With the white colour window framing and rc copings wrapping around, I would say that the colour combination is in contrast and looks pretty good! However, I would wish that if the front porch cover could extend a little bit more to cover the users from direct rain and this will be much better. We designed a huge modern cabinetry for the owner by utilising the space in between the wall and column. Definitely a clean and sleek design. Moving into the interior, unlike modern architecture right now, for older landed properties, the architect tends to create a difference in level between living area with the back of house. I believe that this might be some of trend at that time. Imagine that this is a bare unit, the conventional column and beam is pretty obvious. There is a beam running along the centre of living room. And with this, there is a need to provide a drop ceiling to cover up the structural items. There are actually a few design treatments that can choose from. ๐๐คฉ With the floor level difference, the space configuration is pretty clear and there is no need for us to hack here or there. We provide a huge tv cabinet for the living rooms with both side of storage system. A large tv set can just directly installed to the centre. With the split level, the boundary is enclosed with glass railing same as the staircase, while the empty space below the staircase is maximised, forming more storage area for the owner. Up to this area, the design colour scheme and concept are still intact with ownerโs original intention. Please stay tuned on our next sharing to see what had we done throughout this refurbishment project! MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Oct 13 2023, 11:26 PM
Return to original view | IPv6 | Post
#283
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
#reliablecontractors #memorietart #kiosk
In relation to the completion of kiosk design with Memorie in Jaya One, we are glad to share with you some of our progress photo throughout the three weeks of construction period. The installation works are conducted during night time to avoid shopping mall operation hour. Site preparation checked โ by covering up the existing floor with canvas.๐๐ At the same time, our team members are working hard on and off-site. The cabinetry carcass will be done in the factory and it will be transported to site after painting work is completed. This shorten the time on site as installation work can be done rapidly. Minor touch up is then done to finishing up the works. Hope you like the transformation!๐งก ![]() ![]() ![]() ![]() ![]() This post has been edited by My Maison: Oct 13 2023, 11:28 PM |
|
|
Oct 13 2023, 11:33 PM
Return to original view | IPv6 | Post
#284
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
|
|
|
Oct 14 2023, 10:24 PM
Return to original view | IPv6 | Post
#285
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ซ๐ซ๐๐๐ ๐๐จ๐ฎ๐ฌ๐ ๐๐๐ง๐จ๐ฏ๐๐ญ๐ข๐จ๐ง
By using consistent design language, the wet kitchen is then equipped with full height upper and lower cabinet that comes with glossy finish. Black stone countertop and backsplash are installed along the three sides of the wall. The squarish room area is maximised. ๐๐ ๐๐ง๐๐๐ซ๐ฆ๐จ๐ฎ๐ง๐ญ ๐ฌ๐ข๐ง๐ค๐ฌ are introduced for easier maintenance in future. Sink tap is classy with matte black surface finishing. Kitchen hob and hood are selected based on userโs preference and is set further away from preparation area. Unlike condominium, the wet kitchen is big enough for the owner to segregate the workspace based on their living lifestyle. To balance up the dark scheme colour, we choose to have white colour powder coated aluminium windows and sufficient socket points on each zone. 600 by 600mm tiles that come in grey beige colour are chosen for floor and wall tiles, which give a very classy wet kitchen.๐คฉ On the other hand, the centre area is big enough for cabinetry works to be done. Unlike the other areas, the owner tends to have a European style cabinet with the use of vivid patterns, ๐๐ฒ๐-๐๐๐ญ๐๐ก๐ข๐ง๐ ๐ฆ๐จ๐ญ๐ข๐๐ฌ. We left a recessed space in the middle of cabinet for the placement of refrigerator later on. We try to apply magnetic strip lighting design which is unlikely from conventional housing. Magnetic lightings are fairly flexible. It comes with a variety of fittings that can be conveniently changed. You may choose to have spotlight, diffuse light and even pendant lights. These help in elevating the atmosphere. Hope you like the sharing today. ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Oct 15 2023, 11:18 PM
Return to original view | IPv6 | Post
#286
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ซ๐ซ๐๐๐ ๐๐จ๐ฎ๐ฌ๐ ๐๐๐ง๐จ๐ฏ๐๐ญ๐ข๐จ๐ง
Moving into the bedroom, we only completed the basic services for the owner while the furnishing works will then be taken over by the owner. Standard 600 by 600mm floor tiles are properly installed, come along with tiles skirting all around the room. ๐๐ We choose to have aluminium composite folding panel door for the bathroom. Aircond unit is then installed directly above the door, centre and symmetrical. The refrigerant pipe can then run above the ceiling area of the bathroom, connected to the outdoor unit. Each of the rooms are painted with selected paint based on usersโ preference and choice of selection. In terms of functionality, sufficient sockets and power points are given to the users after discussing with the owner. They are set at a height which are suit to human ergonomic. ๐ฅฐ ๐ฅฐ Hope you like the sharing today. ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
|
|
|
Oct 21 2023, 11:22 PM
Return to original view | IPv6 | Post
#287
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
One of the special features in this project will be the larger bathroom area as compared to small condominium unit where the bathroom size can be quite limited. With this larger space available, the owner tends to have additional features such as bathtub, large vanity top & large mirror provision in the bathroom. Besides, the owner tends to have an elderly friendly bathroom design also by having stainless steel safety grab bar at the shower area. The side of WC area is installed with foldable grab bar as well. All this design detailing will give the elderly extra protection in the wet area. ๐๐ป
I would say that in terms of material selection, the owner is willing to spend more by having a large shower screen to separate the dry and wet areas, large pieces of wall and floor tiles which create grand and classy design. However, if you would like me to comment more on the design, I would wish that the drop from outside to the internal toilet could be replaced with a gentle ramp design to further increase the mobility of wheelchair users. ๐คฉ MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Nov 28 2023, 01:19 AM
Return to original view | IPv6 | Post
#288
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
#reliablecontractor #hairsalon #OneStopSolution
๐๐๐ข๐ซ ๐๐๐ฅ๐จ๐ง Itโs another remarkable milestone for My Maison Team again as we managed to complete an interior fit-out project for a hair salon, located at Taman Midah, Cheras. ๐๐ We transform the entire bare shop lot unit to what it is today within short period of time due to continuous support from project team! Started off the work by demolishing the old interior unit, followed by wet works and partitioning the area as per clientโs brief. Thereโs not much on ceiling work except for the localized ceiling area at the middle to cover up the thick beam and to put on the lights. For lighting, we chose to have magnetic track light on each side by embedding their electrical lines in soffit. Since we are a professional one stop solution service provider, do not worry as we are also expert in ACMV and plumbing scopes as well. For this project, two ceiling cassettes are sufficient to ventilate the entire zones. Refrigerant and drain pipes will then run above the cable tray after considering the most suitable routing. For the hair wash zone, the water supply and discharge are considered and planned properly during the planning stage, followed by the two steel racks installation in between the three hair wash basins, for the purpose of equipment storage. Lastly, we completed the remaining door works and painting works for the entire shop lot unit and this marks the success of the works. Hope you like our sharing today. MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Nov 30 2023, 11:55 PM
Return to original view | IPv6 | Post
#289
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
#reliablecontractors #interiordesigner #ๅฎคๅ
่ฎพ่ฎก #่ฃ
ไฟฎ่ฎพ่ฎกไธ็ซๅผๆๅก
๐๐๐ข๐ฅ ๐๐๐ฅ๐จ๐ง Since our last completion of interior work for a hair salon, here comes another interesting interior fit-out project nail salon, located at Cheras.๐ Similar to the previous project, we conducted a series of demolition work and dispose all the construction debris out of the site. For a business nature shop like this, it is a norm to separate the usable space into a few zonings by partition. In this project, the carpentry work is so important and we need to create box-up space to allow water pipelines - water inlet and outlet piping to run below. A big thumbs up and salute to our carpenter for his good workmanship. This required a great skill of work. Thus, do find yourself a good designer and contractor!๐๐ The raised platform is then finished up with laminate sheet to achieve a good tonality of finishing. In this project also, we provide the owner with simple yet elegant ceiling design for magnetic track lights and other LED downlights to perform their function. We do provide aluminium and glass work services for the interior as well, starting from the selection of glass thickness, spec, frame colour and etc. ๐ช๐ป๐ช๐ป After a several discussions with client, textured pattern paint design is incorporated on the wall. This is applied all over the shoplot unit to achieve a consistent design. Are you satisfied with the outcome? Drop your message below to let us know your thoughts! Hope you like our sharing today. ๐งก๐งก ๐:011-1665 0288 MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() ![]() |
|
|
Dec 14 2023, 01:48 PM
Return to original view | IPv6 | Post
#290
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ฆ๐จ๐ซ๐ข๐ ๐๐ข๐จ๐ฌ๐ค @ ๐๐๐ซ๐๐๐ข๐ ๐ฆ ๐๐๐ฅ๐ฅ
Just when the shopping centre closes at 10pm, My Maison and the team just started our day! The Memorie Cafรฉ is expanding their kiosk to Paradigm Mall after its first successful launch in Jaya One. This entire installation works will only last for 3 weeks. ๐ช๐ป๐๐ป Our teams are working hard and we target to hand over soon. The work scopes are mostly carpentry. Electrical works also play an important role in this scenario. I would say that initial planning and design are so important to allow a smooth workflow during installation on site. The 2D detailed drawings has to be clear and easy to read. ๐ Not only that, plumbing works, wall and floor finishes selection are also part of the details which have to extra taken care of. The scale of works might not be that big but there are much more miscellaneous items to customise as we have to work within the limited space. ๐๐ I hope you enjoy the sharing today! Thanks to the team and we shall share with you our final outcome soon! MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() |
|
|
Dec 15 2023, 09:45 PM
Return to original view | IPv6 | Post
#291
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
#่ฃ
ไฟฎ่ฎพ่ฎกไธ็ซๅผๆๅก #reliablecontractors #restaurantdesign #OneStopSolution
๐๐๐ค ๐๐๐ง @ ๐๐๐ฌ๐๐ซ ๐๐๐ง๐ข Pak Jen, the restaurant that features famous Malay Cuisine, is expanding and here comes the upcoming branch opening in Pasar Seni. My Maison Sdn Bhd is the appointed design & build contractor to execute and monitor the entire construction progress. After few weeks of hard works from all teams, this exciting project is targeted to handover soon. ๐ช๐ป๐ช๐ป As usual, we had conducted a series of preliminaries and demolition works to clear off the existing site. These preliminaries work will cover most of the general items prior to the start of actual works. ๐๐ There are some of the key elements for you to take note while scrolling through our progress photos. The counter area is zoned with low walls. Sandbrick is then plastered and finished up with nice mosaic tiles surface. Same goes to the floor, setting out of mosaic tiles is done to ensure that tiles laid are in order. We really like the special mosaic tiles design.๐๐ We liked the Sage Green and Dark Grey colour combination. The smoke detector, conduit, plumbing pipe that runs at ceiling level are painted with similar colour. This eventually mask off the exposed service. The entire space is aesthetically designed even there is no ceiling covering up the beam. Spotlights are directly installed below the beams and the space is well-lighted! ๐คฉ๐คฉ Another interesting design feature would be the โwarung-styleโ metal deck roof above the counter area. This could be the focal point of the interior. I would say that this is a brilliant idea. ๐งก๐งก Lastly, we do provide our services in installing the aluminium and glass work for the main entrance. Do pay a visit to the store to enjoy the good food while at the same time look at our workmanship towards the detailings! We hope to see you there. MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Dec 18 2023, 01:47 AM
Return to original view | IPv6 | Post
#292
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐-๐๐ฅ๐ข๐ง๐ข๐ @ ๐๐๐ซ๐ญ๐๐ฆ๐๐ฌ ๐๐ก๐จ๐ฉ๐ฉ๐ข๐ง๐ ๐๐๐ง๐ญ๐ซ๐
Yes, K-Clinic at Hartamas Shopping Centre is coming to town! We always love to try and explore new things and there are always new challenges awaiting us to overcome. For different nature of business types, there are different aspects to take note as each of them would have their own priority. Great thing about design is you should be able to make use of the space for intended activities.๐๐ We would share with you from time to time our work in progress. As shown, floor protection is necessary especially in shopping centre. Site logistic has to be planned effectively and ensuring all SOP are followed. Taking care of common area property is part of the responsibility as any damages would cause time and cost implication, which is unnecessary!๐ค๐ค We are in the midst of constructing the ceiling for the project. The ceiling support system is directly hanging from roof truss above. We set up the ceiling grid and getting the lighting points ready. At the same time, we levelled the floor with screed before any final floor finishes set in place. Thus, donโt forget to stay tuned on our project updates! ๐๐ MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() |
|
|
Dec 24 2023, 03:01 AM
Return to original view | IPv6 | Post
#293
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ฆ๐จ๐ซ๐ข๐ ๐๐ข๐จ๐ฌ๐ค @ ๐๐๐ญ๐ข๐ ๐๐ข๐ญ๐ฒ ๐๐๐ฅ๐ฅ
Our beloved client, Memorie Cafรฉ is moving fast in expanding the kiosk design concept to different locations. By applying the same design concept, the idea is further duplicated to Setia City Mall. What makes a good kiosk design? Simplicity will be the key! You donโt have to make complicated design but a great design should focus on the functionality, workflow, irreplaceable branding and signage, great customer experiencing. ๐ช๐ป As we mentioned previously, plumbing works, wall and floor finishes selection are important as well. Plumbing work has to be done properly as any disruption to the water supply or waste discharge could severely affect the operations. We always choose right materials for our floor and wall finishes. It should be durable, aesthetic yet functionable! Installation work should be fast and efficient!๐๐ป๐๐ป As usual, our team inspect the incoming electrical supply and make sure everything is in order. Testing and commissioning (T&C) is necessary to ensure everything is in order. Same goes to the work in factory, built-in furniture customization should be accurate to ensure everything fits accordingly on site. ๐๐ Stay with us and let us look forward the final outcome soon! ๐๐ ![]() ![]() ![]() ![]() ![]() MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my This post has been edited by My Maison: Dec 24 2023, 03:02 AM |
|
|
|
|
|
Dec 25 2023, 04:13 AM
Return to original view | IPv6 | Post
#294
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ฆ๐จ๐ซ๐ข๐ ๐๐๐ซ๐ญ ๐๐ข๐จ๐ฌ๐ค @ ๐๐๐ญ๐ข๐ ๐๐ข๐ญ๐ฒ ๐๐๐ฅ๐ฅ
After countless hours of hard work, dedication, and collaboration, we are thrilled to announce the successful completion of Memorie Tart Kiosk at Setia City Mall. ๐ช๐ป We want to express our heartfelt gratitude to our beloved client for their continuous trust on My Maison and also to our team who contributed their time, expertise, and unwavering support. Your dedication has been the driving force behind this success.๐ ๐ MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my #kioskdesign #ReliableContractors #interiordesigners #OneStopSolution #buildwithpassion ![]() ![]() ![]() ![]() ![]() |
|
|
Dec 26 2023, 10:47 PM
Return to original view | IPv6 | Post
#295
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
QUOTE(Chiggah @ Dec 25 2023, 07:31 AM) How would you remodel this old bungalow in PJ ? This really depends on how low is the structural member / roof truss of the house is if intend to maximise the ceiling height.Do you need to hack the whole roof if want to raise the ceiling ? See https://youtu.be/twzS785hvRE?t=109 https://www.youtube.com/watch?v=twzS785hvRE |
|
|
Dec 26 2023, 10:48 PM
Return to original view | IPv6 | Post
#296
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ง๐จ๐ฆ๐ @ ๐๐ค๐ฒ ๐๐ฏ๐๐ง๐ฎ๐ ๐๐๐ง๐ญ๐ข๐ง๐
In 2023, we shared a lot of different projects with our followers and we really love the variation of projects done! To complete the projects, it involves a lot of hidden works which you might not aware of. From costing, quantity surveying, material discussion, site discussion, team management, project management and many more, all of these works require skill! ๐ค๐ค The integration of different scope of works will definitely need a good coordination. For example, in Renoma project at Sky Avenue Genting, we need to work within the timeline yet we need to figure out the logistic, material transportation, workers arrangement etc. We keep on improving by reviewing our quality of works. We shall take balance within the cost and material spec used for the project as each of the client have their own budget parameter. We as the service provider shall advise them on what to be done! ๐๐ Anyway, for this renovation project, we provide new tiles flooring as per client preference. Work as per usual method statement, we trained the workers as per standard to control the quality. We look into the details, such as tile selection, colour grout selection and application, levelness and control the differential within tolerance. This is our work in progress and stay with us, we shall let you see the completion of work soon. ๐๐ MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my #ReliableContractors #onestopsolution #interiordesigners #buildwithpassion ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Jan 5 2024, 04:44 AM
Return to original view | IPv6 | Post
#297
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ง๐จ๐ฆ๐ @ ๐๐ค๐ฒ ๐๐ฏ๐๐ง๐ฎ๐ ๐๐๐ง๐ญ๐ข๐ง๐
Hey My Maison Design & Build Sdn Bhd community! ๐ Exciting News! We are thrilled to announce that our project @ Sky Avenue Genting is officially complete! โจ Here's a glimpse of the incredible changes: ๐ ๐ซ๐๐ฌ๐ก ๐ฉ๐๐ข๐ง๐ญ & ๐ฆ๐จ๐๐๐ซ๐ง-๐ฅ๐จ๐จ๐ค- - Aesthetic design with enhanced functionality for the business to grow ๐๐ฉ๐๐ญ๐ข๐๐ฅ ๐๐ฅ๐ฅ๐ฎ๐ฌ๐ข๐จ๐ง- - Through a clever interplay of reflection, the mirror creates a captivating spatial illusion, giving the impression of a more expansive and open environment. ๐๐๐ซ๐ฆ๐จ๐ง๐ข๐จ๐ฎ๐ฌ ๐๐จ๐ฆ๐ฉ๐จ๐ฌ๐ข๐ญ๐ข๐จ๐ง- -Achieving a balanced and visually satisfying arrangement. MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
|
|
Jan 13 2024, 11:30 AM
Return to original view | IPv6 | Post
#298
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ง๐จ๐ฆ๐ @ ๐๐ก๐๐ซ๐๐ฌ ๐๐๐ข๐ฌ๐ฎ๐ซ๐ ๐๐๐ฅ๐ฅ
It was a great experience collaborating with our client โ Renoma and we are grateful to be able to provide our professional services to them once again for their new outlet in Cheras Leisure Mall!โบ๏ธ These were the photos taken to record the reinstatement work of the location before the actual renovation work start. We document existing condition, noting any modifications that have been done over time, remove the non-structural elements during previous renovations and carefully dismantle any modification without causing damage to original structure. ๐ช๐ป We conduct the inspections to verify that the site is ready for the next phase of renovation. With all the basic works being done, we are ready to implement the clientโs requirement towards the space planning on site! Stay tuned with us and we shall share with you our progress of work from time to time! ๐งก๐๐ป MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() |
|
|
Jan 24 2024, 11:56 PM
Return to original view | IPv6 | Post
#299
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
๐๐๐ฆ๐จ๐ซ๐ข๐ ๐๐ข๐จ๐ฌ๐ค @ ๐๐๐ซ๐๐๐ข๐ ๐ฆ ๐๐๐ฅ๐ฅ
With the skills, knowledge, and experience gained from previous kiosk projects, all these criteria propel us forward as we continue to strive for excellence outcome for our beloved client - Memorie Tart. in 2024, another remarkable outlet for Memorie Tart is now available in Paradigm Mall. ๐ฅณ๐ฅณ ๐๐ฑ๐๐๐ฅ๐ฅ๐๐ง๐๐ ๐ข๐ง ๐๐จ๐ง๐ญ๐ซ๐๐๐ญ๐จ๐ซ ๐๐๐ซ๐ฏ๐ข๐๐๐ฌ:๐๐ป๐๐ป We prioritize excellence in every aspect of our work, ensuring a high standard of quality in all our projects. ๐๐จ๐ฆ๐ฆ๐ฎ๐ง๐ข๐๐๐ญ๐ข๐จ๐ง:๐๐ Open and transparent communication is at the heart of our approach. We believe in keeping our clients and collaborators informed at every step. Undoubtedly, My Maison's ability to provide the best service has been the cornerstone of lasting collaborations between us and the client. 011-1665 0288 MyMaison ๅฎ็ฝ ๏ผhttps://mymaison.com.my ![]() ![]() ![]() ![]() |
|
|
Jan 25 2024, 12:06 AM
Return to original view | IPv6 | Post
#300
|
![]() ![]() ![]()
Junior Member
319 posts Joined: Jun 2018 |
QUOTE(Sky.Live @ Jan 21 2024, 07:02 PM) Wa your project really atas. Those kiosk/mall renovation usually good margin due to super tight schedule Its really challenging having to rush within the tight schedule. A great communication skills and project management team is indeed paramount. However, from our team feedback to us, they really enjoy the working atmosphere and feeling really excited having to deal with hiccups on site. We are getting more and more confident especially when we know our client more after the first collaboration. Things can went on more smoothly especially when the client have full trust and confident to us, as he knew that our standard of quality is there. So ya overall its a great experience!! |
| Change to: | 0.0501sec
0.60
7 queries
GZIP Disabled
Time is now: 29th November 2025 - 02:52 PM |