I'm getting a quote for Solar system, but they told me it takes approximately 3 weeks to get the NEM3.0 approve from SEDA.
Not sure if i should installed it first, or I should wait till my application approve before installation.
Cause without NEM, means I have to get myself a big load of battery, which will be extremely costly and high maintanance.
NEM 3.0, TNB's Net Energy Metering 3.0