 NEM 3.0, TNB's Net Energy Metering 3.0

views
     
rudolfjie
post Dec 2 2021, 10:24 AM

Casual
***
Junior Member
350 posts

Joined: Oct 2006


I'm getting a quote for Solar system, but they told me it takes approximately 3 weeks to get the NEM3.0 approve from SEDA.

Not sure if i should installed it first, or I should wait till my application approve before installation.

Cause without NEM, means I have to get myself a big load of battery, which will be extremely costly and high maintanance.

 