QUOTE(AmeiN @ Feb 8 2021, 05:20 PM)
Going to update our house renovation journey here.
Location: Jawi
Budget: 50K
Contractor: Same contractor from ChuanHong renovation here https://forum.lowyat.net/topic/5040526
Jobs including:
1. New Tiles 2x2
2. Toilet x 2
3. Windows (Changed to sliding)
4. Kitchen + third bedoom + utility room (Changed layout)
5. Doors
6. Whole house new wiring
7. Whole house plaster ceiling (Except living area)
8. Concrete Fence
9. Change to bigger rainwater drainage
Only front area and main door didnt change because out of budget.
Renovation started ngam2 MCO2.0 started
. Luckily government allowed renovation as per SOP. BUT, of course due to MCO, the renovation going so slow until last week.
could go for all wet works first.. you may further enhance in future once u have extra budget to do other stuffs.. Location: Jawi
Budget: 50K
Contractor: Same contractor from ChuanHong renovation here https://forum.lowyat.net/topic/5040526
Jobs including:
1. New Tiles 2x2
2. Toilet x 2
3. Windows (Changed to sliding)
4. Kitchen + third bedoom + utility room (Changed layout)
5. Doors
6. Whole house new wiring
7. Whole house plaster ceiling (Except living area)
8. Concrete Fence
9. Change to bigger rainwater drainage
Only front area and main door didnt change because out of budget.
Renovation started ngam2 MCO2.0 started
cabinets + expensive door grill can do at last or add-on whenever needed... plan out all your wiring layout first which you could use in future.. such as CCTV, automatic gate motor, extra plug points for decoration lighting (raya/deepavali/cny/xmas)
Feb 9 2021, 09:03 PM

Quote
0.4085sec
0.21
6 queries
GZIP Disabled