AugustTower A: 5 floors (based on my previous post), (4th and 5th constructing)
Tower B: 9 floors (based on my previous post), (8th and 9th constructing)
Refer:
"End" of OctoberTower A: 8 floors (7th and 8th constructing)
Tower B: 17 floors (16th and 17th constructing)
Damn, Tower A's contractor is really taking their sweet time.
However, as of today (24/10/2022, Deepavali day) they are working.
Tower A
» Click to show Spoiler - click again to hide... «

- "Back" view, horizontal

- "Back" view, vertical
Sorry, no picture of "front" view as I can't find the angle.
Tower B
» Click to show Spoiler - click again to hide... «

- "Side" view, horizontal

- "Side" view, vertical

- "Back" view, vertical

- "Full back" view, vertical
This post has been edited by PoisonSoul: Oct 24 2022, 01:55 PM