QUOTE(Shinka @ May 2 2020, 11:00 PM)
Hi all, recently a pipe that is hidden behind one of my bathroom walls is leaking (can't figure out which one).
So, I engaged a plumber who came in and cut open the ceiling and placed 4 stop valves at each pipe (to find out which pipe is leaking).
In the end, it is found out that 3 pipes require replacing (2 cold water pipe, 1 hot water pipe).
The plumber quoted me the following sum for plumbing work. Is it excessive?
1) Cut open ceiling, inspection and installing 4 stop valves - RM1850
2) Hack open 2 walls, replace 2 water pipes (PPR) and 1 hot water pipe (Copper), hole patched up with cement (tiles not included) and patch up plaster ceiling - RM4750
In total, its around RM6600.
Is this too much?
If you Mont Kiara then cheap.So, I engaged a plumber who came in and cut open the ceiling and placed 4 stop valves at each pipe (to find out which pipe is leaking).
In the end, it is found out that 3 pipes require replacing (2 cold water pipe, 1 hot water pipe).
The plumber quoted me the following sum for plumbing work. Is it excessive?
1) Cut open ceiling, inspection and installing 4 stop valves - RM1850
2) Hack open 2 walls, replace 2 water pipes (PPR) and 1 hot water pipe (Copper), hole patched up with cement (tiles not included) and patch up plaster ceiling - RM4750
In total, its around RM6600.
Is this too much?
Why add stop valve? Most of the services got valve.
But why 3 pipe leak at once?
1st services already overprice.
May 2 2020, 11:08 PM