For these Past 2 weeks progress has been slow, I wouldn't deny that there is some hiccups due to site constrain and also limited materials in stock post-corona. As construction work begun in the country, a lot of materials im looking at are running low or not even in stock anymore. I've experience it myself singlehandedly
Work for Plaster Ceiling has begun, but the challange was to get the right air conditioner specialist (not from my main contractor people) to come and install the desired air conditioner (Ceiling Ducted), also needed it to be a smart long ducting aircond (Control Via App). Manage to finalize Samsung as for the aircond selection.
Below are the Ceiling Ducted catalog for you guys to refer in the future :
_CAC__Ceiling_Ducted_2017_Specification_Catalogue__JNM_Series___1_.pdf ( 2.29mb )
Number of downloads: 128Normal Site Problems (Nothing too serious but hope you'll observe and take note) :
Miscommunication with "DNS" (Not Real company name) could even still have mistakes on tiles delivery.
Have the tiles delivery man wait for you together when you check the tiles even if he is in a rush.
Have them be punctual on tiles delivery slot. Not everyone has the time and manpower to wait the whole day.
Fenuni (Not Real company name) have sent some tiles but almost half of them were defect.
Takes another round for them to pick it up and also to send another batch in.
Because the 2nd batch tiles are slightly different in the color tone so they would have to send a whole new tiles again.
Will edit the post a bit more later and share you some small problems at site that you can take note of it !
This post has been edited by Haru Glory: Jul 17 2020, 01:16 AM