I have a situation here.
The bank release full loan to developer however the developer can't confirm when VP.
And I check my SNP, by right the developer should announced the VP date.
In this case what should I do?

This post has been edited by junhui90: Feb 4 2020, 09:57 AM
Feb 4 2020, 09:57 AM, updated 6y ago
Quote
0.0126sec
0.79
5 queries
GZIP Disabled