Supposely 12 month.
But the problem with Malaysia is
Retail Downstream + Network etc combined as one.
In proper Telco industry.
The cost for infras and network =/= retail telco.
so there is a cost for these infras; and the retail supposedly separate.
this can help to reduce over-staffing and poor respond time.
why unifi always offer something with 24m contract
Jan 15 2020, 07:04 PM
Quote
0.0131sec
0.64
6 queries
GZIP Disabled