This shows that the new alignment is actually superior to what was originally planned by Najib which went via Bentong and stopped at Gombak, which is not connected to a main railway hub
QUOTE

Many people mistakenly believe Putrajaya is the spur line. Actually Port Klang is the spur line. That's why its 40km long. Evidence as below:



QUOTE
More info according to the MRL guy manning the booth:
Operation speed: 160 kmh
Design speed: 200 kmh
Ticket Pricing: similar to ETS
Gauge: Standard, actually there was proposal to revert to meter gauge but it wasnt
Operation speed: 160 kmh
Design speed: 200 kmh
Ticket Pricing: similar to ETS
Gauge: Standard, actually there was proposal to revert to meter gauge but it wasnt
Source: https://www.skyscrapercity.com/showthread.p...614719&page=152
do not listen to the lies, see the facts it shows itself
This post has been edited by Raddus: Jan 15 2020, 12:43 PM