QUOTE(Aidenmori @ Feb 3 2021, 11:10 AM)
can pm me salesperson numberInvestment RESIDENSI VISTA SENTUL, OFF JALAN SENTUL, By Platinum Victory Group
Investment RESIDENSI VISTA SENTUL, OFF JALAN SENTUL, By Platinum Victory Group
|
|
Jun 23 2021, 02:20 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
|
|
|
|
|
|
Jun 23 2021, 09:52 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
looking for someone for profit sharing on referral fee. pm me
|
|
|
Jul 19 2021, 08:29 AM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
|
|
|
Jul 21 2021, 11:37 AM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
|
|
|
Jul 22 2021, 01:44 PM
Return to original view | Post
#5
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
QUOTE(akamaru86 @ Jul 21 2021, 01:42 PM) Just to share official reply by developer. 2.85m or 2.8m? floor slab to ceiling. very big difference bro. plaster ceiling use to conceal is different. 0.05m difference is almost a floor for the developerBathroom 2.4m Other 2.85m Some localized area 2.6 m - 2.7 m to concela AC Copper Pipe. This post has been edited by jyll92: Jul 22 2021, 01:47 PM |
|
|
Jul 24 2021, 10:29 PM
Return to original view | Post
#6
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
QUOTE(Minthos_87 @ Jul 22 2021, 10:38 PM) every inch matter bro. Minthos_87 liked this post
|
|
|
|
|
|
Aug 6 2021, 02:27 PM
Return to original view | Post
#7
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
QUOTE(akamaru86 @ Jul 30 2021, 01:51 AM) E-Mail by developer said 2.85 for my unit. just resumed recently i saw tower crane moving from farIt doesnt state in SNP. I think Block A will all have same height cause Block A all A-Type. Donno if Block B have difference height because difference type and have more floors. 0.05 m x 32 floor might have difference of 1 floor like u said. I Basically it less then 2 inch. If u plan to install plaster ceiling, it will make some differenc3. I think they stop because they dont get approval |
|
|
Sep 19 2021, 02:32 PM
Return to original view | Post
#8
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
shiya liked this post
|
|
|
Sep 30 2021, 10:00 AM
Return to original view | Post
#9
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
QUOTE(VAPER @ Sep 27 2021, 11:07 AM) seems like they are capable of 6 storeys combined/ month. Total storey for 2 blocks 35+42=77. Currently 17+12=29. Assuming they complete 4 storeys per month on average. it will take them 1 year to complete the whole structure. + another 6 months buffer for other works. should be able to handover around March 2023 shiya and protonian87 liked this post
|
|
|
Mar 29 2022, 08:43 AM
Return to original view | IPv6 | Post
#10
|
![]() ![]()
Junior Member
202 posts Joined: Nov 2015 |
|
| Change to: | 0.0181sec
0.74
6 queries
GZIP Disabled
Time is now: 21st December 2025 - 02:20 AM |