QUOTE(KamisF @ May 16 2021, 01:11 PM)
PM mee tooInvestment RESIDENSI VISTA SENTUL, OFF JALAN SENTUL, By Platinum Victory Group
Investment RESIDENSI VISTA SENTUL, OFF JALAN SENTUL, By Platinum Victory Group
|
|
Jun 12 2021, 10:46 PM
Return to original view | Post
#1
|
![]()
Newbie
8 posts Joined: Sep 2008 |
QUOTE(KamisF @ May 16 2021, 01:11 PM) PM mee too Aidenmori liked this post
|
|
|
|
|
|
Jul 13 2021, 02:21 PM
Return to original view | Post
#2
|
![]()
Newbie
8 posts Joined: Sep 2008 |
anybody have sign SNP, can I get clarification and advise.
In FAQ, they mention ceiling height is 9ft from floor Today only I have access to S&P and last day to sign (don't know why they don't arrange it earlier) After browsing the documents few times, I still cannot find any statement stating ceiling height. it is not mention in S&P. I ask lawyer but she also cannot answer. Call agent, agent call developer. no solid asnwer. Ask architect drawing, they say cannot provide. They say they don't put ceiling height in S&P because its already standardize to all other. Later they say can verify via email (coz cannot give official letter head since PKP, no one at office (yeah right). only can give after MCO, but then pass S&P date. If extend date signing S&P, then 1 aircond gone.. they will only offer 2 aircond instead of 3 aircond. Hmmmmm.............. This post has been edited by akamaru86: Jul 13 2021, 02:24 PM |
|
|
Jul 14 2021, 10:52 AM
Return to original view | Post
#3
|
![]()
Newbie
8 posts Joined: Sep 2008 |
QUOTE(Aidenmori @ Jul 13 2021, 05:46 PM) In FAQ it said 9ft.But not mention at all inside S&P QUOTE(Maiiyowei @ Jul 13 2021, 08:39 PM) Mean the beam & slab is 250mm thick.So not much plaster work can be done there. |
|
|
Jul 21 2021, 01:37 PM
Return to original view | IPv6 | Post
#4
|
![]()
Newbie
8 posts Joined: Sep 2008 |
QUOTE(Aidenmori @ Jul 20 2021, 05:52 PM) I don't see anyone here yet. Perhaps someone will open a group closer to VP date? This is as 12 July 2021 , i visit before signing snp Nothing much yet. Last time I heard construction is up to level 9. ![]() ![]() shiya, Minthos_87, and 1 other liked this post
|
|
|
Jul 21 2021, 01:42 PM
Return to original view | IPv6 | Post
#5
|
![]()
Newbie
8 posts Joined: Sep 2008 |
QUOTE(Maiiyowei @ Jul 13 2021, 08:39 PM) Just to share official reply by developer.Bathroom 2.4m Other 2.85m Some localized area 2.6 m - 2.7 m to concela AC Copper Pipe. aiman.yahaya, Minthos_87, and 1 other liked this post
|
|
|
Jul 21 2021, 01:56 PM
Return to original view | IPv6 | Post
#6
|
![]()
Newbie
8 posts Joined: Sep 2008 |
|
|
|
Jul 30 2021, 01:51 AM
Return to original view | IPv6 | Post
#7
|
![]()
Newbie
8 posts Joined: Sep 2008 |
QUOTE(jyll92 @ Jul 22 2021, 01:44 PM) 2.85m or 2.8m? floor slab to ceiling. very big difference bro. plaster ceiling use to conceal is different. 0.05m difference is almost a floor for the developer E-Mail by developer said 2.85 for my unit. It doesnt state in SNP. I think Block A will all have same height cause Block A all A-Type. Donno if Block B have difference height because difference type and have more floors. 0.05 m x 32 floor might have difference of 1 floor like u said. I QUOTE(Minthos_87 @ Jul 22 2021, 10:38 PM) Basically it less then 2 inch. If u plan to install plaster ceiling, it will make some differenc3. QUOTE(protonian87 @ Jul 29 2021, 03:53 PM) is the current development stop since June? I think they stop because they dont get approvalIs there an update for the development? 2023 is a long wayyyy hmmmmmmmmmmmmmmmmm and mco ... |
|
|
Aug 23 2021, 12:18 PM
Return to original view | Post
#8
|
![]()
Newbie
8 posts Joined: Sep 2008 |
![]() Image capture as yesterday 22 Ogos 2021. Seems like block A is already in 11th floor. This post has been edited by akamaru86: Aug 23 2021, 12:20 PM protonian87 liked this post
|
| Change to: | 0.0213sec
0.55
6 queries
GZIP Disabled
Time is now: 21st December 2025 - 04:27 AM |