QUOTE(jscheok @ Feb 2 2019, 01:00 PM)

SPA stated it will compensate if the different is more than 5%, so how do i calculate it? I shall measure the layout including all the tiang?
Thanks
Check again ur final unit layout with Approved Building Plan. Developer should handover a copy to JMB/Management Office.
In your case, those column is within ur parcel, normally u cannot calculate those area and seek for compensation.
Based on the provided layout, ur SPA area should be 5m x 8.8m = 44m2.
Standard Schedule H should only allow 2% threshold, not sure why ur SPA is 5%.
if 5% = 44m2 x 5% = 2.2m2.
So if ur strata title showing that ur parcel area is less than 41.8, then u can claim the different.
Please remember, always use m2 instead of sq.ft. This is because when strata title is out, all stated in m2.
some conversion may cause u gain/loss.
Please take note.