Welcome Guest ( Log In | Register )

22 Pages « < 4 5 6 7 8 > » Bottom

Outline · [ Standard ] · Linear+

 Extension, Wet Works and ID, Discussion for Wet Works and ID works

views
     
TSDarenloh
post Jun 6 2020, 04:38 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(yy2k @ Jun 5 2020, 02:13 PM)
Planning to extend my wet kitchen (5 x 22 feet, ground floor only, premises at bandar puchong jaya) with conventional tile roof. Work to include wet works, tiling, plumbing & electrical installation. pm quotation pls. Thanks in advance.
*
pls check your inbox ya πŸ˜πŸ‘πŸ»
TSDarenloh
post Jun 10 2020, 01:24 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(yy2k @ Jun 9 2020, 07:19 PM)
Pls check your inbox for my contact. WhatsApp me to discuss further
*
sure! thanks 😁
TSDarenloh
post Jun 11 2020, 06:11 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(merci @ Jun 10 2020, 02:16 PM)
Hi Daren,
Plse PM me. I need some ID for my living. Thanks
*
Done Pls check πŸ˜πŸ‘
TSDarenloh
post Jun 21 2020, 07:00 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(adrianlim2323 @ Jun 21 2020, 04:44 PM)
Hi Daren, I'm confusing about some building material that you've explained to me in PM. Since its fall under extension and wet works, can you share some knowledge on how to differentiate BS and CQ for steel bar? I hope it can help other former that wanted to do extension soon or in progress. Sorry for being troublesome cause we are not in the construction field. tqvm smile.gif
*
Hi Mr. Lim, no need to sorry, I'm happy to share some details of it, and hopefully it can help other people too without charging any consultation fees biggrin.gif ... Let's talk about the steel market in Malaysia. First and foremost, in Malaysia, there are few company/manufacturer that controls the steel market. It's the big four (ε››ε€§ε€©ηŽ‹) which is Amsteel, Masteel, Alliance Steel and Southern Steel. These four company have sirim cert which means it is BS or can conclude they are following JKR specs. For contractor, we called it (big factory) for BS and CQ is (small factory). As for physically the difference between BS and CQ is the diameter size. Let's said using Y12 BS and Y12 CQ to compare, the size for BS is confirmed will be 12.++mm and for CQ maybe u could get 10.++mm which means u only get Y10 BS size.

The other point is the marking that u can find on the steel. Each company has a different marking. Eg. Alliance steel it will be written, "AS 12 500N". "AS" is company/manufacturer, "12" is the diameter size and "500N" is the grade and strength. Secondly is the BRC. For physically it is the same with the high tensile deformed steel bar which is (Y bar) that I've mentioned just now. The size is slightly different. It has BRC A4-A13 (square mesh), BRC B5-B13(rectangular mesh), BRC C5-C13(long rectangular mesh), BRC DA4-DA13(small square mesh). The alphabet after the letter of BRC represents the shape and the number represents the diameter size.

Last but not least, is ® round steel bar. The (Y) and ® bar many of people are confusing. The (Y) bar is with groove line and the ® is without groove line and it's a smooth rounded shape. So what is the uses of (Y) and ® is (Y) usually is the long straight steel in column or beam and ® is the ring of the (Y). This will be confused but i will attach some drawing to explain it shortly. If u guys experienced in submission to majlis it will have archi and engineer plan, From the plan it will written 6Y12/150cc which means your column or beam should consist of 6 units of Y12 and the ring gap between is 150mm.

So here is my explanation of the steel bar. Pls correct me if I'm wrong. Thanks biggrin.gif
TSDarenloh
post Jun 23 2020, 01:59 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(KaLs @ Jun 21 2020, 08:08 PM)
Good explanation bro. Salute!  notworthy.gif
*
Thanks bro notworthy.gif
TSDarenloh
post Jun 23 2020, 02:01 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(littleants @ Jun 22 2020, 01:46 PM)
Hmm, great explanation there. I think I can chip in a bit.

To put it simply:

-B.S stands for British Standard. BS rebar means it is British Standard compliance in terms of size and strength. And each batch of the rebar comes with proper mill certs showing its strength, actual size, composition, bend and rebend test result.

-C.Q stands for commercial quality. CQ bar is usually undersized and without proper certification as said. So avoid using it for main structural works.
*
Thanks for the input thumbup.gif
TSDarenloh
post Jun 23 2020, 02:02 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(adrianlim2323 @ Jun 22 2020, 02:50 PM)
Thank for the explanation braderr.. Learned lots of things from you  notworthy.gif
*
It's my pleasure Braderrrr thumbsup.gif
TSDarenloh
post Jul 1 2020, 09:00 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


Marc Residence @ KLCC makeover ID for investment purpose. biggrin.gif

user posted image

user posted image

user posted image
TSDarenloh
post Jul 20 2020, 01:59 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


Wangsa condo renovation...

Job scope:
-Plaster ceiling
-Painting
-Wall hacking
-Wall repairing
-Kitchen storage cabinet
-Wardrobe for Master bedroom and Bedroom 1
-M&E
-Installation of lights and fans

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image

Attached Image
TSDarenloh
post Jul 22 2020, 06:34 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


Some update 😁

user posted image

user posted image

user posted image
TSDarenloh
post Jul 24 2020, 02:58 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(xxxxjackxxxx @ Jul 23 2020, 02:16 PM)
Hi, can pm me ? I'm looking for contractor to do renovation mostly on wet works
*
Done. Pls check 😁
TSDarenloh
post Jul 26 2020, 04:34 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(fedexion @ Jul 26 2020, 01:24 PM)
Hi, can PM me your contact number please? Got plans to renovate my house, thanks!
*
Pls check your inbox thumbsup.gif
TSDarenloh
post Jul 29 2020, 10:48 AM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(smile888 @ Jul 26 2020, 11:38 PM)
Hi Im looking for contractor to renovate single storey:
- rewiring
- piping
- roof painting
- house painting
- car porch tiling
- awning
- autogate
- change front windows and door
- change toilet 1 from squat to sit
- retile toilet 2 and dig a hole for water to flow (existing don't have)

Please PM me contacts and quotation for the above. Thanks.
*
Done! pls check your inbox 😁
TSDarenloh
post Aug 7 2020, 05:08 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


Completed project! rclxm9.gif Here's some video and photos.



user posted image

user posted image

user posted image

user posted image
TSDarenloh
post Aug 16 2020, 10:32 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(haohau @ Aug 16 2020, 09:31 AM)
Hi Daren, please PM me your contact, plan to do renovation for my house in Rimbayu.
*
Done biggrin.gif
TSDarenloh
post Aug 18 2020, 01:54 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(BrandonChong @ Aug 17 2020, 09:36 AM)
Pls pm me your contact no.
*
Done 😁
TSDarenloh
post Aug 20 2020, 02:22 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(outlife11 @ Aug 19 2020, 10:34 AM)
pm
*
pls check ya 😁
TSDarenloh
post Aug 23 2020, 09:08 AM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(kapalterbang_737 @ Aug 22 2020, 12:28 PM)
Hi guys, wanted to know based on your experience, how long is the lead time required to complete a semi-major renovation?
I am planning to hack & re-tile my bathroom (3x bathroom), tiling the porch & backyard, and some minor works (change doors/window grille/adding plug point/repair leakage), but no extension for the house or whatsoever

I’ve asked 3 contractors & all of them said it’s gonna be between 45-90 days, is it standard?
My house is a 2 1/2 storey terrace house
*
-Re-tile 3 bathroom with waterproofing and change the sanitary wares estimated 12-15 days

-Tiling the porch and backyard depends on the size. estimated 8-10 days

- change door, adding plug point with hack and plaster back, repair leaking estimated 7-10 days

- repaint House estimated 7-10 days

- window grille depend on the manufacturer workload

This post has been edited by Darenloh: Aug 23 2020, 09:12 AM
TSDarenloh
post Aug 23 2020, 04:31 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(merci @ Aug 23 2020, 12:31 PM)
Hi,
Re-tile 3 bathroom will takes 12-15 days?? I guess if 1 bathroom will take shorter days, right?
My bathroom took 16 days for the waterproofing and retiling. hacking only 1 day. I plan to retiling my downstairs bathroom.
*
Hi Merci,
The duration of retiling depends on the size, height and the complexity. I'm using standard bathroom size with 4' x 8' x 5'(H) bathroom without bathtub and shower screen as reference. Let me breakdown the job scope with 2 workers per bathroom and using 2' x 1' tiles.

- 1 day for hacking and floor screed (for condo it may take up to 2 days cuz need to discard the debris to loading bay)

- 1 and half day to do wall tiling and another half day for waterproofing

- 1 day to do floor tiles

- 1 day to do installation of sanitary wares

For your bathroom it takes 16 days to complete 1 bathroom? what's the size of the bathroom and what's size of tiles u using? I've seen some people using hexagon tiles 😁





TSDarenloh
post Aug 23 2020, 04:34 PM

Casual
***
Junior Member
451 posts

Joined: Apr 2016


QUOTE(kermit21 @ Aug 23 2020, 03:52 PM)
Hi Daren,

Need your advice.

I'm looking at back house extension for both floor approximately 8f by 24f. 
1.Looking to extend the kitchen and room.
2.Relocation of toilets to optimize the space.
3. Redoing the wiring and plumbing.
4. Fixing few leaking areas.
5.Need some advice for on how to have more natural lighting
6. Why and when roof needs to be changed.
7. Currently i am living there with family and how it will impact the renovation?
8. We can move out for short while but what bout the stuffs at home?
9. Please share estimated price.

Thanks.
*
Pls check your inbox 😁

22 Pages « < 4 5 6 7 8 > » Top
 

Change to:
| Lo-Fi Version
0.0265sec    0.67    7 queries    GZIP Disabled
Time is now: 10th December 2025 - 02:48 PM