Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Renovation Step by Step, share some of my experience

views
     
thinkgoodpositive
post May 24 2023, 08:25 AM

Getting Started
**
Junior Member
196 posts

Joined: Sep 2015
QUOTE(aloha_90 @ May 22 2023, 09:58 AM)
magnet track light installation and eyeball installation

[attachmentid=11468325]

[attachmentid=11468326]

[attachmentid=11468327]

[attachmentid=11468328]
*
Nice!. Is the magnet track pre-installed by the plaster ceiling guy when doing plaster or by the wiring men when doing plaster ceiling? One lighting /wiring point can connect for how long the track?
Thanks.
thinkgoodpositive
post Jun 21 2023, 10:29 AM

Getting Started
**
Junior Member
196 posts

Joined: Sep 2015
QUOTE(aloha_90 @ Jun 20 2023, 04:02 PM)
backyard extension for wet kitchen  biggrin.gif

[attachmentid=11470969]

[attachmentid=11470970]

[attachmentid=11470971]

[attachmentid=11470972]
*
Hi, how many concrete pillar is required if for side extension 6' wide x 20' long? Single storey with slab roof. THanks
thinkgoodpositive
post Aug 1 2023, 03:52 PM

Getting Started
**
Junior Member
196 posts

Joined: Sep 2015
QUOTE(aloha_90 @ May 29 2023, 12:08 PM)
ya install by plaster ceiling worker , 4000 mm track for 1 lighting point
*
can share how to install the magnetic track light? got photo before cover the plaster board?
can we mount it on the aluminium/steel frame support and cover with the plaster board?
Or must screw on those long wood support? thanks.

 

Change to:
| Lo-Fi Version
0.0264sec    0.41    7 queries    GZIP Disabled
Time is now: 26th November 2025 - 05:59 AM