I am looking for contractor just to pay the cost of workmanship to do my car poach tiles. planning to do 2 by 1 tiles, that will need me to buy roughly about 230 tiles. Not sure how to calculate the square feet
Also planned if I can get the required things by my self rather than going through a contractor who marks up the price of the things.
One individual approached me and said he will offer to get me the things since he is a contractor he will get better rate and I said OK. so here was his list!
1. BRC A8 - 5 pieces RM875 plus Y12 steel totalling up to rm1025, what Is Y12 and why it cost me this much? I just checked online, it looks like Y12 is used for raising up any building when piling is done, what is the need to use it for car poach tiles?
2. Pasir 1 lorry RM 550 - Does this actually cost me this much or he asking me for sewa the lorry together
3. Susu gam RM180 - I know they need to put this in between of the tiles, but how much is required actually ad the price?
4. Simen- 25 packet x RM15 = RM375, what is the exact cost of simen packet now days, if can get this in high quantity will there be any lower price given per packet?
5. Simen gam 15 x 15 = RM225 . What is the difference between susu gam and Simen gam?
6. Rubbish bin - RM300. I think this is way over cost
7. workman ship= Upah latai as he said in his quote, buang sampah , upah pasang tiles, and simen belakang total of RM2850. This is cut throat or if you feel other way around.
SO please tell me what is the actual things needs and does this prices make sense?