Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> looking for contractor, for following

views
     
TSju146
post Mar 18 2018, 07:11 PM, updated 7y ago

Regular
******
Senior Member
1,537 posts

Joined: Nov 2008
Hi contractor, you may PM me if you are interested for following scope.

1. supply and install ~1000sf plaster ceiling, plain design
2. supply and install painted steel hanging rack at dry kitchen, will let you know the size and design later
3. install sink at wet kitchen
4. wiring, lights (downlights, track light, strip lights, cove lights), water heater and fan installation.
5. 4 feet width, 10 feet high shoe rack. Swing door
6. 10 * 10 wardrobe. 2 pieces of glass sliding panel and 1 swing door.
7. assemble ready made wardrobe (as i am moving it from my old house), size 8*8

Do provide your estimated price and payment milestones.

Target start date, June 2018.
Alston Benedict
post Mar 18 2018, 09:01 PM

New Member
*
Junior Member
45 posts

Joined: Jan 2018
Hello boss can i know where is this and btw pm me for electrical and wiring works at 013-6929052 Alston
Alston Benedict
post Mar 18 2018, 09:02 PM

New Member
*
Junior Member
45 posts

Joined: Jan 2018
Hello boss can i know where is this and btw pm me for electrical and wiring works at 013-6929052 Alston
enriquelee
post Mar 20 2018, 08:55 AM

Don't ask for more, ask for COKE
********
All Stars
10,507 posts

Joined: Jan 2003
From: Atlanta

QUOTE(ju146 @ Mar 18 2018, 07:11 PM)
Hi contractor, you may PM me if you are interested for following scope.

1. supply and install ~1000sf plaster ceiling, plain design
2. supply and install painted steel hanging rack at dry kitchen, will let you know the size and design later
3. install sink at wet kitchen
4. wiring, lights (downlights, track light, strip lights, cove lights), water heater and fan installation.
5. 4 feet width, 10 feet high shoe rack. Swing door
6. 10 * 10 wardrobe. 2 pieces of glass sliding panel and 1 swing door.
7. assemble ready made wardrobe (as i am moving it from my old house), size 8*8

Do provide your estimated price and payment milestones.

Target start date, June 2018.
*
Location?
TSju146
post Mar 20 2018, 09:21 AM

Regular
******
Senior Member
1,537 posts

Joined: Nov 2008
QUOTE(enriquelee @ Mar 20 2018, 08:55 AM)
Location?
*
Bukit jalil
enriquelee
post Mar 20 2018, 11:47 AM

Don't ask for more, ask for COKE
********
All Stars
10,507 posts

Joined: Jan 2003
From: Atlanta

QUOTE(ju146 @ Mar 20 2018, 09:21 AM)
Bukit jalil
*
Noted, i have PMed you.
fama7738
post Mar 20 2018, 12:27 PM

New Member
*
Newbie
21 posts

Joined: Mar 2018
Remember go see contractor’s recently works 1-2 times before make decision. Photo cant tell truth. I went 3times for my contractor in 1month to see what he do how he do on other house while under discuss quotation price then only decide. 😅 overall until now is ok and save my time alot to research.
Jesslyne
post Mar 29 2018, 10:41 AM

New Member
*
Junior Member
39 posts

Joined: Nov 2015
QUOTE(ju146 @ Mar 18 2018, 07:11 PM)
Hi contractor, you may PM me if you are interested for following scope.

1. supply and install ~1000sf plaster ceiling, plain design
2. supply and install painted steel hanging rack at dry kitchen, will let you know the size and design later
3. install sink at wet kitchen
4. wiring, lights (downlights, track light, strip lights, cove lights), water heater and fan installation.
5. 4 feet width, 10 feet high shoe rack. Swing door
6. 10 * 10 wardrobe. 2 pieces of glass sliding panel and 1 swing door.
7. assemble ready made wardrobe (as i am moving it from my old house), size 8*8

Do provide your estimated price and payment milestones.

Target start date, June 2018.
*
Hello, you can call this contact.
He doing built in cabinet, plaster ceiling, wiring works, grille. 019 3381272 Anson
Klonelshaw
post Apr 22 2018, 02:04 PM

Getting Started
**
Junior Member
50 posts

Joined: Jan 2016
QUOTE(ju146 @ Mar 18 2018, 07:11 PM)
Hi contractor, you may PM me if you are interested for following scope.

1. supply and install ~1000sf plaster ceiling, plain design
2. supply and install painted steel hanging rack at dry kitchen, will let you know the size and design later
3. install sink at wet kitchen
4. wiring, lights (downlights, track light, strip lights, cove lights), water heater and fan installation.
5. 4 feet width, 10 feet high shoe rack. Swing door
6. 10 * 10 wardrobe. 2 pieces of glass sliding panel and 1 swing door.
7. assemble ready made wardrobe (as i am moving it from my old house), size 8*8

Do provide your estimated price and payment milestones.

Target start date, June 2018.
*
Klonelshaw
post Apr 22 2018, 02:04 PM

Getting Started
**
Junior Member
50 posts

Joined: Jan 2016
U can contact me for free quitation. 0165656836
em2ie
post May 7 2018, 04:44 PM

New Member
*
Newbie
2 posts

Joined: May 2013
Hi. We have provide many services. Drop us a message for quotations and site seeing. Thanks


 

Change to:
| Lo-Fi Version
0.0121sec    0.54    5 queries    GZIP Disabled
Time is now: 29th March 2024 - 08:03 PM