Submission / Approval for renovation work in Klang Valley
Process to obtain approval of building plans and work permits:
1. Owner to prepare the required documents such as follows:
a) Copy of Sales Agreement
b) Copy of Tenancy Agreement (if applicable)
c) Copy of paid latest Assessment (Cukai Pintu)
d) Copy of CF (Certificate of Fitness) OR Copy of CCC (Complete & Compliances Certificate)
e) Copy of Owner / Tenant Identity Card
f) Copy of Company Registration and Borang 49 (if applicable)
2. Owner to prepare certain consultation fees, deposit and processing fees:-
a) For 2 storey extension at the back of a terrace house, consultation fees is RM2500-RM3500 includes Architect endorsement, site measurement, building plan drawing and form submission.
b) Owner to pay around RM1000-RM2500 for deposit, processing fees, construction waste bin depends on scale of renovation. Deposit will be returned if renovation works is completed according to the approved plan.
3. Approval / Work Permit usually takes about 14-30days depends on Local Authorities.
4. For certain renovation works at office / factory / kindergarden, submission to Bomba Department is required depends on Local Authorities.
5. For certain renovation works which involved new structure works, owner is required to engage an engineer to do structural submission and endorsement depends on Local Authorities.
6. For certain renovation works which extension and renovated area if more than 50% of the existing building size, owner is required to engage a registered town planner to do planning submission and endorsement depends on Local Authorities.
7. If owner starts works before obtaining approval, fine will be imposed at 10 times or 20 times of your processing fees depends on Local Authorities.
8. If contractor includes to obtain approval in their scope of works, please make sure you obtain letter and drawings endorsed by registered architect/building draughtman and Local Authorities. Safe keeping these documents for future inspection by Local Authorities. You might need it too when you intend to sell your property in future.
Depends on Local Authorities, building setbacks for terrace are different from area to area as follows:-
a) Front - 20' from wall to boundary (fencing), 10’ from car porch column to boundary.
b) Back – to the end of boundary
c) Side (corner lot) - 10' or 20’ from wall to boundary
d) Side (end lot) – 5’ or to the end of boundary.
This post has been edited by GOSHEN: Mar 7 2018, 11:44 AM
Approval for Renovation @ DBKL, MPPJ, MPSJ, MPS., Submission for extension to authorities