Can I claim 5% from stakeholder lawyer or developer if certain damage caused by developer during the rectification work. The rectification works involve: -
1. Break the plaster ceiling to fix water leaking at ceiling.
2. Hack the wall and replace missing air-cond copper hose.
3. Replace floor tiles at living room and bed rooms
My concern is how can I claim the developer if they spoil my plaster ceiling, furniture and make dirty on my wall?
I have research on internet and found no information. Hope you all may give me advise.
Thank you.