Outline ·
[ Standard ] ·
Linear+
Properties in Sg Long & BMC V6
|
LD Jr
|
Aug 21 2018, 11:33 AM
|
Getting Started

|
QUOTE(alyem @ Aug 2 2018, 06:13 PM) Next Wednesday morning site inspections by Ahli Majlis MPKj and all relevant parties... If everything ok... Should start work very soon. So prepare for the jam. Hi bro, any update on the site inspections and Silk Highway U-Turn? Haha, cant wait to know the update...thanks ya
|
|
|
|
|
|
LD Jr
|
Nov 30 2018, 03:57 PM
|
Getting Started

|
QUOTE(cskean @ Nov 27 2018, 01:39 AM) Any news/update for the toll free U TURN before the Twin Palm toll? From Sg Long direction U TURN to Balakong... I see roads reserved at the toll booth, few lanes have been closed. Looks like a preparation for the U TURN, but didn't read/hear any updates about it anymore~ Any idea the u turn before Toll or after?
|
|
|
|
|
|
LD Jr
|
Nov 30 2018, 11:58 PM
|
Getting Started

|
QUOTE(cskean @ Nov 30 2018, 11:42 PM) Base on what I saw, it it meant for U Turn before Twin Palm toll from Sg Long direction back to Balakong. If the U Turn is after the toll, then it serve no purpose to avoid toll for Sg Long residents~ Thanks for the update. If really U Turn before toll, it should be able to reduce the traffic at sg long main road and balakong town, let pray for it to happen asap. haha
|
|
|
|
|
|
LD Jr
|
Apr 11 2019, 11:58 AM
|
Getting Started

|
QUOTE(Palmwalker001 @ Apr 11 2019, 09:59 AM) Shl going to build flyover connect to SILK Highway opposite Honda showroom because that land (Lot 3489) belong to them, save land acquisition cost [attachmentid=10224753][attachmentid=10224754] Build the flyovers before all the development? If the 2 traffic lights before petronas and before tmn rakan will remain at the same location, more car will go into sg long main road toward silk hw balakong.....perhaps jam issue will not be resolved?
|
|
|
|
|