QUOTE(AskarPerang @ Jul 26 2020, 05:12 PM)
Just collected my keys on Friday.
Yes i agree with you on all the points.
Luckily my parking is located at level B. All B level got lift. A level need to use stairs to get to the lift.
Cement corridor. Expected for rumahwip project I guess. But the worse sight is actually the SYABAS water meter located outside. It is so weird placement.
Unit layout is weird too. Long foyer area. Confirm will not be able to fit any normal shoe cabinets.
Big living area. But on the other hand, you get smaller room size. Master room is very small. Master toilet is worse. Is crazy tight space.
Guardhouse and car park access system still not yet ready. Still work in progress.
The only good thing is they waive 12 months maintenance fees. FOC. Great.
12 months = around 2.4k wowYes i agree with you on all the points.
Luckily my parking is located at level B. All B level got lift. A level need to use stairs to get to the lift.
Cement corridor. Expected for rumahwip project I guess. But the worse sight is actually the SYABAS water meter located outside. It is so weird placement.
Unit layout is weird too. Long foyer area. Confirm will not be able to fit any normal shoe cabinets.
Big living area. But on the other hand, you get smaller room size. Master room is very small. Master toilet is worse. Is crazy tight space.
Guardhouse and car park access system still not yet ready. Still work in progress.
The only good thing is they waive 12 months maintenance fees. FOC. Great.