My contractor say if add db on 1st floor we need to rewiring whole 1st floor existing black wire. Izit true? Why?
Double storey house add db on 1st floor
Double storey house add db on 1st floor
|
Jan 17 2017, 09:29 PM, updated 8y ago
Show posts by this member only | Post
#1
|
Senior Member
769 posts Joined: Jul 2007 |
My contractor say if add db on 1st floor we need to rewiring whole 1st floor existing black wire. Izit true? Why?
|
|
|
|
Jan 17 2017, 09:30 PM
Show posts by this member only | Post
#2
|
Senior Member
8,690 posts Joined: Aug 2009 |
Depend on what you want to do with the DB
|
|
Jan 17 2017, 09:38 PM
Show posts by this member only | Post
#3
|
Senior Member
769 posts Joined: Jul 2007 |
|
|
Jan 17 2017, 10:41 PM
Show posts by this member only | Post
#4
|
Junior Member
133 posts Joined: Aug 2005 |
2 thick wires [L, N] to new db
then start organizing . all upstair points goes to new db. aircon/wheater/plug /light etc. downstair db control all the downstair point [oven/wmachine/aircon/plug /fridge/light/alarm/ autogate etc] |
|
Jan 17 2017, 10:50 PM
Show posts by this member only | Post
#5
|
Senior Member
1,083 posts Joined: Jan 2003 From: Kota Kinabalu |
|
|
Jan 17 2017, 11:37 PM
Show posts by this member only | Post
#6
|
Senior Member
769 posts Joined: Jul 2007 |
|
|
Jan 17 2017, 11:51 PM
Show posts by this member only | IPv6 | Post
#7
|
Senior Member
582 posts Joined: Oct 2010 |
When you doing new DB, mean the whole thing will going to re-wire to the new DB for 1st floor, i think not only black. By that, you not really need to hack out the old wire which is actually nearly impossible because you not really know how the wire run in the last time, what you need to do is directly pull new wire
|
|
Jan 18 2017, 12:16 AM
Show posts by this member only | Post
#8
|
Junior Member
84 posts Joined: May 2005 |
Yes your contractor is right.
Live, Neutral will have to come from the 1st floor DB box. » Click to show Spoiler - click again to hide... « |
|
Jan 18 2017, 12:53 AM
Show posts by this member only | Post
#9
|
Senior Member
1,083 posts Joined: Jan 2003 From: Kota Kinabalu |
QUOTE(Ice BabY @ Jan 17 2017, 11:37 PM) My other contractor told me if new db will need to rewire all existing black wire.. but need to hack all existing black wire or what? No need to hack.. rewire from existing first point to the new DB also can.. Maybe hack a little ..Its because the new RCD will need to have same current (Amps) from Live to Neutral otherwise it'll trip.. |