Hi there, I just spent about RM 3.3k on my Saga Flx Soundproofing these 2 days.
I'm new on soundproofing, have zero experience, and feel like got conned and being over charged.
Hope bros here that are experience could help me to know am I being charge fairly?
I won't reveal the shop name first, to be fair. Since I might be bugged by my prejudice.
This is what I had Done in these two days:
D1 :
1. 4 Doors dampening + Aero Seal. RM740
D2:
1. Full Floor Soundproofing RM1110
2. Hood RM400
3. Chasis Foam RM750
There are actually few things that bug me. I don't know whether Im being treated unfairly or it is the industrial offer?
1. 4 Doors Dampening RM500 + Aero Seal. RM240
The 4 doors only stick a silver color thing. Is it usually do 1 layer soundproofing for RM100 each door?
The Aero Seal come with 3 rubber(sorry, don't know what this called). 1 Long rubber under the upper bonet, 2 short one left and right front door frame. I feel over priced for 3 rubber...and I thought It included the rear two door too. Since they only mention door Aero seal, of course I will thought they mean the full 4 door aero seal.
2. Full Floor RM1110
At first I was quoted RM 1480 on facebook messenger. they mentioned Fire wall, front wheel arch, and full floor. didnt mention how many layers.
the first day I asked them to reconfirm a price for me, cause I was thinking if I do few sector in 1 shot, maybe can get some discount. That guy didn't mentioned much, just write down the price he offer me, which is 1180 for front and floor, 1280 for rear and boot, 450 for bonet. (but he didn't list down the item in that paper.)
For sure I will thought the 1180 is mean the front (fire wall, front arch wheel) and the floor. as their website only mention Front package and rear package. and the guy from fb messenger also mention 1480 is for this 3 items. but didnt mention how many layers.
Then I have a peek today. I feel quite insecure and confused. Dont know is it the industry method of doing front soundproofing.
coz they only Did 1 layer Dampening and 1 layer white color fiber wool on the floor which I think is fine.
But what really confused me is the Firewall and front arch wheel. They did not remove the original mat under the dash board. did not do dampening, just lift the mat up and stuff the white color fiber wool into it.
I thought their job are not over yet. so I went other place and have a seat. then not a while, they already cover the work with sage original mat, which mean the job is done?
I have asked that guy, how come didnt do front wheel arch one?? then he say the front wheel arch is outside the car that one. that coating do with whole car RM 900+

I forget to mentioned firewall that time, cause I feel tired after waiting for like 3 hours. and my chasis foaming still need to be done yet.
But after I went back home. I feel really confused man. I only looked clearly the invoice are so neat, didnt elaborate further. it only stated RM1110 for "Full floor" and did not mention fire wall etc

(ori quote RM1180, they offer to absorb the gst).
So guys, caused I am new and don't know much about this industry. I feel kena tricked especially for the front soundproof package.
When I reached home around 10pm that time. I used torch light to flip the mat a little and see, they like only stuff in 2 layer of fiber wool in front.
After Paying for RM 3300, My front soundproof and bonet should be already good enough to lower the noise. however, the effect is very minimal. When I flip over the mat below the steerling that time, I saw bare metal. I knocked it and it "kong kong kong" ... I feel like the firewall work shouldnt be like that gua? just stuff the wool, not fully stuff also...
sigh.....
Sad man....since he introduce some speaker and carbon cleaning...my total expense for this two days RM3900+. hard earn money, but feeling like kena fool. Can some one please advice me? is this the correct doing and fair price for front soundproofing? I don't know how it look likes, wanna complaint also dont know how.
However, I didnt reflect this problem to the website incharge person. waiting for reply....
1.5 days labour X 2 person? With this amount of time , your labour cost is going to be high.