QUOTE(lucifah @ Oct 20 2016, 09:16 PM)
escalator.. Home Escalator (Serious Talk)
Home Escalator (Serious Talk)
|
|
Oct 20 2016, 09:17 PM
Return to original view | Post
#1
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
9,206 posts Joined: Jun 2006 |
|
|
|
Oct 20 2016, 09:20 PM
Return to original view | Post
#2
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
9,206 posts Joined: Jun 2006 |
|
|
|
Oct 20 2016, 09:56 PM
Return to original view | Post
#3
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
9,206 posts Joined: Jun 2006 |
QUOTE(skeith @ Oct 20 2016, 09:54 PM) Well, Home EscalatorElevator send in to site with hundreds to thousands of losen parts. Just for the cabin itself, it can be detached to at least 6 panels, 1 Control panel, 1 overhead ceiling, platform, header case, plank, side arm, door panel, door machine, etc Then u need a counter weight that can dettach to frames, weight, n sometime wheel. If canti-level that the wheel can be void. After that the houst way, the guild rail can be dettach to 2, 3, n 5 meters long depends on requirement with some small accessories, connecting plates, & hoistint cable. Then machine room consist of a motor, a sheave wheel, & platform/bed to let your motor sit tightly. Then we talk about Control System. It can be integrated into the hoistway if the elevator is compact or motor-roomless design. Installation wise needs at least 2 workers to install everything and 1 wiring man to setup the wiring. The installation is quite simple. I can do it myself with my bangla worker n wat we really need is, energy. Maintenance wise, u can hire maintenance guy for RM300 a month for 5 floors elevator (3 yrs ago pricing). Just normal servicing like check cable, lubrication, ini itu. The raw cost to build a 8 person lift for 5 floors with motor-roomless design is about 50~70kRM (when USD = 3.5RM). title says escalator, why are you explaining about elevator? |
| Change to: | 0.0129sec
0.47
7 queries
GZIP Disabled
Time is now: 16th December 2025 - 07:12 AM |