Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Home Escalator (Serious Talk)

views
     
ar188
post Oct 20 2016, 09:17 PM

Look at all my stars!!
*******
Senior Member
9,206 posts

Joined: Jun 2006
QUOTE(lucifah @ Oct 20 2016, 09:16 PM)
the question is, how are you going to bring it into a completed house? it's a single piece
*
escalator.. laugh.gif belum lift sudah upgrade to escalator
ar188
post Oct 20 2016, 09:20 PM

Look at all my stars!!
*******
Senior Member
9,206 posts

Joined: Jun 2006
QUOTE(lucifah @ Oct 20 2016, 09:18 PM)
y amang... ayam surprised. i know istana negara and brunei sultan got escalators inside
*
he never thought about floor foot print.. biggrin.gif need to take up space and dig a big hole also.
ar188
post Oct 20 2016, 09:56 PM

Look at all my stars!!
*******
Senior Member
9,206 posts

Joined: Jun 2006
QUOTE(skeith @ Oct 20 2016, 09:54 PM)
Well,
Elevator send in to site with hundreds to thousands of losen parts.

Just for the cabin itself, it can be detached to at least 6 panels, 1 Control panel, 1 overhead ceiling, platform, header case, plank, side arm, door panel, door machine, etc

Then u need a counter weight that can dettach to frames, weight, n sometime wheel. If canti-level that the wheel can be void.

After that the houst way, the guild rail can be dettach to 2, 3, n 5 meters long depends on requirement with some small accessories, connecting plates, & hoistint cable.

Then machine room consist of a motor, a sheave wheel, & platform/bed to let your motor sit tightly.

Then we talk about Control System. It can be integrated into the hoistway if the elevator is compact or motor-roomless design.

Installation wise needs at least 2 workers to install everything and 1 wiring man to setup the wiring.

The installation is quite simple. I can do it myself with my bangla worker n wat we really need is, energy.

Maintenance wise, u can hire maintenance guy for RM300 a month for 5 floors elevator (3 yrs ago pricing). Just normal servicing like check cable, lubrication, ini itu.

The raw cost to build a 8 person lift for 5 floors with motor-roomless design is about 50~70kRM (when USD = 3.5RM).
*
Home Escalator
title says escalator, why are you explaining about elevator? hmm.gif

 

Change to:
| Lo-Fi Version
0.0129sec    0.47    7 queries    GZIP Disabled
Time is now: 16th December 2025 - 07:12 AM