Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

 Aera @ PJS5, Pre-Launch

views
     
HMMaster
post Sep 7 2016, 01:21 PM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


What is the psqf price?
HMMaster
post Sep 7 2016, 01:28 PM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(takanor1 @ Sep 7 2016, 01:25 PM)
About 450+ psft
*
I see... is it a dual-key concept? I see that the unit size in the first post is xxx+yyy

Type A- 850+160sq
Type B- 550+160sq.

Btw, viewable at their office at kuchai lama?
HMMaster
post Sep 8 2016, 10:21 AM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(takanor1 @ Sep 7 2016, 01:49 PM)
Not dual key, the +sq ft is balcony etc. Their showroom unit only available in December, now only the model.
*
160sqft for balcony? That is quite a huge space.
HMMaster
post Sep 9 2016, 10:51 PM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


It seems facing (or near) muslim cemetery?
HMMaster
post Dec 29 2016, 04:13 PM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(David_77 @ Dec 29 2016, 04:09 PM)
Using google map, about 4.6km to Sunway Pyramid.

How's the developer? Any project reference?
*
http://chinhinproperty.com/developments-completed/
HMMaster
post Dec 29 2016, 05:32 PM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(klasphobic @ Dec 29 2016, 04:19 PM)
Chin Hin's 1st Property project still have got defect issue with their swimming pool. More than 6 months and still no repair. Residents are left stuck with no swimming pool facility. After so long, Management Committee still nego with them. Why so long?  blink.gif  blink.gif
[attachmentid=8326064]
[attachmentid=8326067]
[attachmentid=8326074]
[attachmentid=8326075]
*
But it is already past the liability (warranty) period already?
HMMaster
post Dec 29 2016, 07:10 PM

10K Club
Group Icon
Moderator
10,308 posts

Joined: Jan 2003
From: Kuala Lumpur


QUOTE(SKY 1809 @ Dec 29 2016, 06:11 PM)
U mean still got people want to buy new properties from them...Listed co, right ?
*
I mean, for the GRes swimming pool issue, the warranty is already over and chin hin no longer need to be responsible for it. Now it should be fixed by the building management. (via sinking fund)

 

Change to:
| Lo-Fi Version
0.0221sec    1.01    7 queries    GZIP Disabled
Time is now: 24th December 2025 - 04:08 PM