Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment Bandar Rimbayu V5, The Township Nature Perfected

views
     
csdarkjedi
post Mar 19 2017, 05:59 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(kh8668 @ Mar 18 2017, 11:13 PM)
MOO, a few areas are not fully utilised. same old layout. only good thing is the ground floor will be totally open concept - you look the whole space till rear from the main door.

this layout more practical.
*
Ya G floor will look more spacious than Penduline.
Can just have a feel by seeing Penduline Type A show unit in which their Id also open up all.
Such size 3 rooms is good enough adey.
There are some spaces not fully utilized. Rear back end still have small spaces not extended till the end, else would look even bigger.
csdarkjedi
post Mar 24 2017, 01:33 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(elmond @ Mar 24 2017, 11:03 AM)
kemuning flyover status answer in dewan selangor

phase 1
[attachmentid=8632943]
phase 2 on year 2021
[attachmentid=8632949]
*
haiz 2021

This post has been edited by csdarkjedi: Mar 24 2017, 01:53 PM
csdarkjedi
post Mar 24 2017, 01:51 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(elmond @ Mar 24 2017, 11:03 AM)
kemuning flyover status answer in dewan selangor

phase 1
[attachmentid=8632943]
phase 2 on year 2021
[attachmentid=8632949]
*
2021, haiz
csdarkjedi
post Mar 26 2017, 11:20 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
I wonder how's Livia sales 🤔
csdarkjedi
post Mar 26 2017, 10:06 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(kokkuen @ Mar 26 2017, 02:07 PM)
70 of 118 units sold at the moment

[attachmentid=8643335]
*
Seems successful first day. Good for the area and market.
csdarkjedi
post Jun 9 2017, 07:29 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(ShobuPantsu @ Jun 9 2017, 12:08 AM)
Hi guys, would like an input by you fellow sifus on an issue with my unit in Wisteria. A couple weeks back I dropped by Rimbayu and ventured into the Wisteria development for some sight seeing. Was shocked to find quite alot of Air Selangor markers cemented outside my unit along with many other houses as the one below:

user posted image
Initially I thought something so uglily placed should be temporary, but it could not be temporary if they have cemented it. To make matters worse, look at how disproportionate it was cemented on the ground.

I then msged my SA to inquire about the purpose of the marker, found out it was indeed permanant, but for the purpose the SA will have to get back to me. Followed up a couple of days later and the SA started ignoring my msg. A far cry from the service I received when I was purchasing a unit. doh.gif
Anyway, I take that the SA believe if there is nothing good to say, say nothing at all. Fearing the worst, I went to do my research and the following is what I found out.

Markers are usually there to show the location of important pipes and valves underneath. Generally markers are placed at either a T-Junction or a dead end road for the following purposes:

T-Junction : the junction outside has a sluice valve which can control water flow (eg: to cut water supply and conduct repairs if pipe burst)

Dead end : a scour valve underneath which can flush out the water from the pipes

The valves on both ends will let you know the location of the water pipes underneath.

Even then.. generally there is seldom needs for marker because at the T-junction there are the sluice valves which will have valve chambers which must be above ground.

At the dead end there must be washout with chamber above ground too. In reality the chambers become the markers.

Does anybody really need a marker to show the pipe location in front of their houses? Isn't it common sense to know where the pipes are? Especially when there is already a drain hole right in front of the house. (refer pic)

Furthermore, the Authority will have their own "as built drawings" to guide them.

To top it off, it is laughable that there are 2 markers planted on the exact same location.
So my question to any sifu familiar with construction is, what good indisputable reason can one give to have these markers placed in intermediate units around the neighbourhood.

To the rest, would you be satisfied with your developer planting such an ugly marker, let alone 2, right outside your home, especially when your neighbourhood is strata titled, meaning after paying RM930k for a house, you have to come home to that ugly sight every day and nothing can be done.

Lastly, I do not believe this is air selangor requirement for a simple reason. I would bet my life, a development like Eco Sanctuary would ever allow this to happen in their neighbourhoods.
*
First time see such thing, let me check with my fren as well who bought Wisteria whether this is on all units or selected units. Btw, what izzit got to do with ES?
csdarkjedi
post Jun 9 2017, 08:57 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(8sg9ft @ Jun 9 2017, 08:20 AM)
For sure it has something to do with ES as both developments are under the same Majlis and Syabas jurisdiction area and both are strata-titled. Should follow the same guidelines. If ES and TA doesn't have this, Wisteria owners sure mengamuk
*
Ok understood. Will check with ES SA as well.
TA frens should do the same coz it really look odd to have such thing in front of the house.
csdarkjedi
post Jun 9 2017, 01:15 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(8sg9ft @ Jun 9 2017, 11:54 AM)
Not sure why this phase has such a thing also. Their 3rd phase Periwinkle that VP has the ugly "tombstones" but certainly not 2 of them side-by-side

http://rimbayu.ijmland.com/images/periwink...e_built(28).jpg

Even 4th phase Scarlet (most recent VPed phase) doesn't have it. Only got one near the fire hydrant.

http://rimbayu.ijmland.com/images/scarlet/...andscape-08.jpg
*
Oh seems other phases also have lar, not really about strata or not, but other phases seems least notice, nicely done.
csdarkjedi
post Jun 9 2017, 03:23 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
I went to see with my fren, I can't even find the house with two HDPE so near. In fact only certain house would have HDPE, typically end unit. So I think this particular unit special case only
csdarkjedi
post Jun 9 2017, 04:43 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(wong8981 @ Jun 9 2017, 04:07 PM)
Boss memang boss , directly onsite inspection after complain
*
No lar, coz my fren bought Wisteria ma, so more kan cheung
csdarkjedi
post Jun 9 2017, 04:48 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(MeToo @ Jun 9 2017, 04:46 PM)
Speaking of which... i thougth Wisteria still under construction? Can just walk in meh?
*
Emergency exit is wide open today it seems.

csdarkjedi
post Jun 9 2017, 09:17 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(MeToo @ Jun 9 2017, 04:54 PM)
Security so lax...

When I was doing civil work project.... no one allowed into the work site... even when allowed.. full PPE must be worn.. otherwise if a hammer dropped on a visitor.. there will be hell to pay...
*
To be frank, I think u r right. They should not allow people to go in before VP.
csdarkjedi
post Jun 16 2017, 02:27 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(wong8981 @ Jun 16 2017, 10:48 AM)
The Rimbayu Club Village will also be home to an Olympic-size swimming pool, a gymnasium, a cafeteria, badminton courts, a football field, jogging tracks, bazaar spaces and much more

IJM Land also recently announced that the Oasis International School is slated to open in the fourth quarter of 2017, and will house a capacity of nearly 600 students after its first phase is completed.

In early 2018, the 1st phase of the bustling commercial area will be ready, providing yet another element of convenience to the residents of Bandar Rimbayu.


http://www.starproperty.my/index.php/artic...mbayu-township/
*
I thought Oasis will start by 2018.
Didnt expect q4 2017 will start.
csdarkjedi
post Jun 18 2017, 12:38 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
Facade better than Penduline


Attached thumbnail(s)
Attached Image
csdarkjedi
post Jun 18 2017, 08:04 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(hakamika @ Jun 18 2017, 01:16 PM)
hmmm, classic looks. not bad..
*
Yeah think it looks great for the price. Still much better than buying a condo for that money.
csdarkjedi
post Jun 19 2017, 04:38 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
Any idea what's happening on left side of Rimbayu roundabout? It's the commercial area of Rimbayu, but started land clearing for?
csdarkjedi
post Jun 21 2017, 10:00 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(senapang @ Jun 21 2017, 12:57 AM)
Went to the show unit launching last weekend..my original thought was it is better to have separate toilet for room 2 and 3 upstair..but after seeing quite big toilet they provide, i dont mind sharing the toilet.. tongue.gif

Type A unit only have 3 rooms but they provide a stor below the staircase..but Type B unit have 3+1 room but dont have a store below the staircase..need to build by our own later..

Overall, with the open concept of Type A, doesnt feel like live in 1,650sqft house..the space planning quite good
*
Ya, if choose would consider Type A, provided 3 rooms is enough lar. If u notice material given like sanitary, window, etc is a bit more louya but again can't complain with this 600k price tag.
csdarkjedi
post Jul 17 2017, 05:30 PM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(ShuTengDe @ Jul 17 2017, 04:41 PM)
Stay nearby at KU mah, jz go pusing pusing and see the progress
*
Penduline more or less done, I see adey doing longkang, planting trees, and preparing the road for tar. Heard VP is Nov
csdarkjedi
post Aug 1 2017, 10:47 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
IJM really just want to sell houses only, kept on launching house only. Never think about bringing up people move in faster or bring in more commercials. Highway also don't want to open for so dam long.
csdarkjedi
post Aug 1 2017, 11:52 AM

Regular
******
Senior Member
1,412 posts

Joined: Sep 2015
QUOTE(8sg9ft @ Aug 1 2017, 10:49 AM)
What highway to open?  hmm.gif First phase of commercials are about to be completed by end of this year or early next year.
*
I find IJM very slow lor in commercials.
Ya the road to BSP, they should open it up for everyone to start having more people pass thru else how to generate awareness and prosper faster

3 Pages < 1 2 3 >Top
 

Change to:
| Lo-Fi Version
0.1602sec    0.52    7 queries    GZIP Disabled
Time is now: 5th December 2025 - 08:22 AM