Hi Anyone,

Did anyone has any experience is applying reno approval in Majlis Perbandaran Klang in recent year?

Can share some of experience on it?

Thanks ....

Appreciate a lots........ rclxms.gif rclxms.gif rclxms.gif
drifters
post Feb 24 2016, 04:33 PM

Getting Started
**
Junior Member
50 posts

Joined: Jan 2003
Starting my reno soon too.. input on such would be valuable.

BTW, if there are no extension done (most major is covering up a void in the car porch roof) need apply for permit?
TSJoannez
post Feb 25 2016, 11:39 AM

New Member
*
Junior Member
18 posts

Joined: Feb 2016
QUOTE(drifters @ Feb 24 2016, 04:33 PM)
Starting my reno soon too.. input on such would be valuable.

BTW, if there are no extension done (most major is covering up a void in the car porch roof) need apply for permit?
*
Where is yr location?
93126668
post Feb 25 2016, 12:43 PM

Casual
***
Junior Member
352 posts

Joined: Oct 2010


I applied initially to MPK for renovation via submission of new BP. Ended up it was put on hold due to changing from 1 storey to double storey, so a KM/DO is required that took me additional 5 months.

Renovation submission or BP is quite fast, if every supporting letter is in place, it would be approved within 1 week.

Cheers
TSJoannez
post Feb 26 2016, 10:42 AM

New Member
*
Junior Member
18 posts

Joined: Feb 2016
QUOTE(93126668 @ Feb 25 2016, 12:43 PM)
I applied initially to MPK for renovation via submission of new BP. Ended up it was put on hold due to changing from 1 storey to double storey, so a KM/DO is required that took me additional 5 months.

Renovation submission or BP is quite fast, if every supporting letter is in place, it would be approved within 1 week.

Cheers
*
Do you need to get consent from neighbours? and how much deposit do you pay for debris collection ?



93126668
post Mar 1 2016, 12:39 PM

Casual
***
Junior Member
352 posts

Joined: Oct 2010


Yes there's a form to sign by all adjacent direct neighbors.

Debris collection You can check with the person in charge.


TSJoannez
post Mar 2 2016, 01:14 PM

New Member
*
Junior Member
18 posts

Joined: Feb 2016

Thanks for your inputs.
wister
post Mar 3 2016, 11:26 AM

Casual
***
Junior Member
322 posts

Joined: Nov 2006


You would required to get both of your neighbour on left and right to sign letter of consent. However if they are unwilling to do so, you can just write neighbour unwilling to cooperate.

For total, you would need to prepare RM1108 for the whole process. RM600 for Alam Flora RORO bin. RM508 for MPK approval and deposit. As far as i remember, the deposit is RM100.

The above figure is if you are doing your renovation based on the guidelines/standard set by the MPK. This means that you are doing based on the plan on the book that you bought.
TSJoannez
post Mar 3 2016, 01:50 PM

New Member
*
Junior Member
18 posts

Joined: Feb 2016
QUOTE(wister @ Mar 3 2016, 11:26 AM)
You would required to get both of your neighbour on left and right to sign letter of consent. However if they are unwilling to do so, you can just write neighbour unwilling to cooperate.

For total, you would need to prepare RM1108 for the whole process. RM600 for Alam Flora RORO bin. RM508 for MPK approval and deposit. As far as i remember, the deposit is RM100.

The above figure is if you are doing your renovation based on the guidelines/standard set by the MPK. This means that you are doing based on the plan on the book that you bought.
*
Thanks wister for your details inputs. that's very helpful thumbup.gif thumbup.gif thumbup.gif thumbup.gif ....
TSJoannez
post Mar 3 2016, 02:10 PM

New Member
*
Junior Member
18 posts

Joined: Feb 2016
Wister, may i know how long is the process to get approval from MPK?

wister
post Mar 8 2016, 04:39 PM

Casual
***
Junior Member
322 posts

Joined: Nov 2006


For standard ones, the PIC will tell you to come back for the permit the next day. However to be safe, go back 2days later. It should be done.

For myself, i had submitted the application and the permit is ready 2days later. Try call before going to collect
TSJoannez
post Mar 15 2016, 12:19 PM

New Member
*
Junior Member
18 posts

Joined: Feb 2016
QUOTE(wister @ Mar 8 2016, 04:39 PM)
For standard ones, the PIC will tell you to come back for the permit the next day. However to be safe, go back 2days later. It should be done.

For myself, i had submitted the application and the permit is ready 2days later. Try call before going to collect
*
Thanks Wister , for your advise
nitromx
post Aug 26 2016, 10:41 AM

On my way
****
Senior Member
532 posts

Joined: Nov 2004



QUOTE(wister @ Mar 8 2016, 04:39 PM)
For standard ones, the PIC will tell you to come back for the permit the next day. However to be safe, go back 2days later. It should be done.

For myself, i had submitted the application and the permit is ready 2days later. Try call before going to collect
*
hi ,
Standard ones mean?
if extend kitchen does it falls under standard?
wister
post Sep 8 2016, 03:01 PM

Casual
***
Junior Member
322 posts

Joined: Nov 2006


They will provide a guide book with standard renovations plan. There is 2 type of backyard extension, if you select to follow those drawing, then it should be fast and standard.

Non standard is you wanting to do something special and requires to submit your own architect drawing. this might take abit more time.
D902
post Mar 29 2017, 02:06 PM

New Member
*
Junior Member
49 posts

Joined: Jun 2011


QUOTE(93126668 @ Feb 25 2016, 12:43 PM)
I applied initially to MPK for renovation via submission of new BP. Ended up it was put on hold due to changing from 1 storey to double storey, so a KM/DO is required that took me additional 5 months.

Renovation submission or BP is quite fast, if every supporting letter is in place, it would be approved within 1 week.

Cheers
*
Which dept in MPK I should visit to apply or submit the renovation plan?
ehwee
post Mar 29 2017, 04:02 PM

Value Our Living Spaces!
*****
Junior Member
786 posts

Joined: Sep 2013
From: Selangor


QUOTE(D902 @ Mar 29 2017, 02:06 PM)
Which dept in MPK I should visit to apply or submit the renovation plan?
*
building dept, MPK
D902
post Mar 29 2017, 04:53 PM

New Member
*
Junior Member
49 posts

Joined: Jun 2011


QUOTE(ehwee @ Mar 29 2017, 04:02 PM)
building dept, MPK
*
Thank you smile.gif
deathTh3Cannon
post Feb 27 2022, 06:04 PM

Getting Started
**
Junior Member
240 posts

Joined: Aug 2011
Any idea if they only accept cash or can use credit card?
kumilily
post Aug 1 2022, 07:36 AM

New Member
*
Junior Member
14 posts

Joined: Feb 2007
hai..may i know if i apply permit with mpk,will they come site visit to check the progress or not?
thanks

 