Maybe some electrical contractors in this forum can reply to this:
1. I would understand that if you lay one lighting point direct from DB to switch to light and you charge say RM80 for that 1 point then it is fine. For a short looping, say a downlight of 4ft away, why still they want to charge RM80 for this point?
2. Likewise for powerpoint. I see some had a quotation of RM105 per point direct from db. If it is looping next to each other, still RM105? Cost for just this very short looping with switches, wire and labour will not be more than RM15 and yet they charge the same ie RM105.
Dont you think that this is cut throat charging? Or they charge it this way to make the calculation simple?
Electrical Installation Quotation, Are the prices reasonable?
Mar 7 2016, 01:05 PM