Please alert to this company who only got 3 job

Quotation VS Interior Design, You ask we answer
|
|
Dec 10 2021, 07:40 AM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
106 posts Joined: Mar 2020 |
|
|
|
|
|
|
Dec 12 2021, 11:06 AM
Return to original view | IPv6 | Post
#2
|
![]() ![]()
Junior Member
106 posts Joined: Mar 2020 |
|
|
|
Dec 19 2021, 07:44 PM
Return to original view | IPv6 | Post
#3
|
![]() ![]()
Junior Member
106 posts Joined: Mar 2020 |
QUOTE(FeelSoGood @ Dec 16 2021, 06:46 PM) Hi, I have a new 2 Story Semi-D (Size: 3,000sqft), which I have the intention to do renovation with the following scopes: Not too enough with the carpentery works if included.1. Toilet x 3 (Tiling & waterproof), new sink & toilet bowl for master room's toilet only. 2. Plaster ceiling in 90% area. 3. Kitchen cabinet for Wet (aluminum) and Try Kitchen both with island. 4. Build in cabinet for master room and simple cabinet for the rest of 3 rooms and simple shoe cabinet. 5. Lighting. 6. Painting. With the scopes above, looking for advice if RM100K-120K budget would be sufficient? Thank you! Condition is is it included tiles supply? |
|
|
Dec 27 2021, 06:09 PM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
106 posts Joined: Mar 2020 |
|
| Change to: | 0.0462sec
0.47
7 queries
GZIP Disabled
Time is now: 30th November 2025 - 05:19 PM |