QUOTE(lyrilmaki @ Nov 16 2021, 07:23 PM)
Hi,
Should I pay and start drawing first before VP, based on the floor plan. Or wait until I get my keys?
I am interested to have you help me design and build my 861sqft bare unit after going through your works. 50k without any loose furniture. Is this budget enough?
Should I pay and start drawing first before VP, based on the floor plan. Or wait until I get my keys?
I am interested to have you help me design and build my 861sqft bare unit after going through your works. 50k without any loose furniture. Is this budget enough?
above the plan I think like a guide menu to indicate what you can buy what size can suit ,
above is 3D drawing
will follow the plan accordingly
the work done
Nov 18 2021, 12:49 PM

Quote


0.0304sec
0.44
6 queries
GZIP Disabled