Outline ·
[ Standard ] ·
Linear+
Investment VIVA METROPOLIS @ TAMAN MUTIARA BARAT, CHERAS, Urban Realm, the new face of Cheras
|
TSaccetera
|
Dec 14 2015, 12:37 AM, updated 10y ago
|
|
 QUOTE Proposed Development: Block I: 5-level Shopping Mall as base podium with 7 levels of sub-level and basement carparks
***
Block A: Signature Serviced Residence 60-storeys (832 units)
Block B: Service Apartment T1 49-storeys (686 units)
Block C: Service Apartment T2 49-storeys (686 units)
Block D: Service Apartment T3 70-storeys (980 units)
Block E: Service Apartment T4 70-storeys (980 units)
Block F: Serviced Suites Tower 49-storeys (588 units)
--------(Total Residential Development: 4,752 units)--------
Block G: Office Tower T1 59-storeys
Block H: Office Tower T2 59-storeys
Block J: Business Hotel & Serviced Residence 40-storeys (1,120 units/rooms???)More information/news will be written on http://www.ptlm.com.my. Stay tuned. This post has been edited by accetera: Jul 4 2016, 10:05 AM
|
|
|
|
|
|
Hinka
|
Dec 14 2015, 12:42 AM
|
|
|
|
|
|
|
|
HELLO HELLO
|
Dec 14 2015, 01:06 AM
|
|
Quite Near Connaught. Sibeh huge supply.... Condo beside already got manyak for rent. Eko Cheras many units soon flood the market here... Now in surge lagi more supply.... jialat.
This post has been edited by HELLO HELLO: Dec 14 2015, 01:07 AM
|
|
|
|
|
|
ChuiChuiShui
|
Dec 14 2015, 01:20 AM
|
|
hosei....6k units..how big is the land area ah?
|
|
|
|
|
|
Chris Chew
|
Dec 14 2015, 02:50 AM
|
|
Got 20 acres land size? Quite densed.
|
|
|
|
|
|
heavenly91
|
Dec 14 2015, 07:05 AM
|
|
Too high volume Definitely won't be good for investment Will have difficulty finding tenant
|
|
|
|
|
|
kochin
|
Dec 14 2015, 08:28 AM
|
|
the road terus koyak ....
|
|
|
|
|
|
t_yuuki
|
Dec 14 2015, 09:35 AM
|
Getting Started

|
are they standing on the cemetery?
|
|
|
|
|
|
jinsailoo
|
Dec 14 2015, 09:36 AM
|
|
QUOTE(kochin @ Dec 14 2015, 08:28 AM) the road terus koyak .... the land in this area also going down by 2inchi, too heavy
|
|
|
|
|
|
nexona88
|
Dec 14 2015, 10:00 AM
|
|
oversupply situation! and more jam
|
|
|
|
|
|
Jagalat
|
Dec 14 2015, 10:07 AM
|
|
If the speculated location is the actual site then new exit needs to be built from MRR2. That is a huge slope to connect from MRR2. Else every vehicle will enter/exit via Tayton, Mutiara Barat and Ekocheras. This mall is considered "deep inside".... Also, the last piece of green land of the area is gone!
|
|
|
|
|
|
cannible
|
Dec 14 2015, 10:29 AM
|
|
Who's developer?
|
|
|
|
|
|
kochin
|
Dec 14 2015, 10:30 AM
|
|
QUOTE(Jagalat @ Dec 14 2015, 10:07 AM) If the speculated location is the actual site then new exit needs to be built from MRR2. That is a huge slope to connect from MRR2. Else every vehicle will enter/exit via Tayton, Mutiara Barat and Ekocheras. This mall is considered "deep inside".... Also, the last piece of green land of the area is gone! MRR2 can't help. MRR2 itself already very jam nearby this area. interchange to it would just be jam on top of jam.
|
|
|
|
|
|
rainman19
|
Dec 14 2015, 10:38 AM
|
|
QUOTE(kochin @ Dec 14 2015, 10:30 AM) MRR2 can't help. MRR2 itself already very jam nearby this area. interchange to it would just be jam on top of jam. before tiara hills? the big u-turn damn far
|
|
|
|
|
|
Jagalat
|
Dec 14 2015, 10:46 AM
|
|
QUOTE(kochin @ Dec 14 2015, 11:30 AM) MRR2 can't help. MRR2 itself already very jam nearby this area. interchange to it would just be jam on top of jam. LOL..What if the residents of Tayton, Mutiara and Ekocheras to setup guard house to "control" /toll booth to "collect donation" for their entry? .....haha.. Access to this site is really challenging... This post has been edited by Jagalat: Dec 14 2015, 10:47 AM
|
|
|
|
|
|
prozac88
|
Dec 14 2015, 10:48 AM
|
Getting Started

|
Woah... Excited about this development ! Hope it materialises..
|
|
|
|
|
|
JMm
|
Dec 14 2015, 10:50 AM
|
Getting Started

|
jam jam and jam again
|
|
|
|
|
|
TSaccetera
|
Dec 14 2015, 10:52 AM
|
|
DO submission stage.
|
|
|
|
|
|
Jagalat
|
Dec 14 2015, 11:00 AM
|
|
QUOTE(accetera @ Dec 14 2015, 11:52 AM) l hope the your predicted site is the actual project location. With that, l really look forward to seeing the DO approved!
|
|
|
|
|