Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai

views
     
leyhay
post May 29 2019, 07:59 PM

Getting Started
**
Junior Member
257 posts

Joined: Sep 2016
QUOTE(D.G.M @ May 29 2019, 07:03 PM)
200m+ linked bridge is not long distance actually. The problem is 70% of the bridges is full framed & with aircond. But air cond never on & try imagine the hot air inside the framed bridge in the hot afternoon. Bad air ventilation.
*
Wahlao aircond never on? Why install aircond then

 

Change to:
| Lo-Fi Version
0.0758sec    0.51    7 queries    GZIP Disabled
Time is now: 12th December 2025 - 04:26 PM