QUOTE(CMW123 @ Jan 6 2016, 04:36 PM)
Any blockH buyer in the forum, pls advise.Thanks.
Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai
|
|
Jan 7 2016, 10:43 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
|
|
|
|
|
|
Jan 7 2016, 10:45 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,833 posts Joined: May 2008 |
|
|
|
Jan 7 2016, 10:59 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
QUOTE(lamode @ Jan 6 2016, 03:06 PM) Based on the pics, i think it's not b- directional, one for entry, one for exit. Looks like it....inconvenience....perhaps they expecting people to make a u turn near the BTS LRT?b Those who wish to visit the Vmall, upon reaching at Tasik Selation Uturn, may have a second thought heading to BJ or Paradigm2, instead... |
|
|
Jan 7 2016, 04:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
QUOTE(gks @ Jan 7 2016, 11:45 AM) Regardless the differential progress between block J & H, both blocks have to be VP-ed and obtain CCC in the same time. Yes, same VP time.One benefit of updating the billing request is to reflect the progress performance of individual block and buyers are pre-alerted to allocate money (those 70% loan) |
|
|
Jan 8 2016, 05:46 AM
|
![]() ![]()
Junior Member
112 posts Joined: Nov 2013 |
Any guesstimate on when we can expect the 2b billing?
|
|
|
Jan 8 2016, 10:27 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]()
All Stars
11,943 posts Joined: Mar 2012 From: Kuala Lumpur |
very slow progress instead. maybe MRT work and traffic diversion affecting such
|
|
|
|
|
|
Jan 10 2016, 04:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
Taken 3 hrs ago. BlkJ site ![]() |
|
|
Jan 10 2016, 04:44 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
BlkH...From this angle, can't see much significant progress... maybe need to find another angle
![]() |
|
|
Jan 10 2016, 04:45 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do...
![]() |
|
|
Jan 10 2016, 07:09 PM
|
![]()
Junior Member
17 posts Joined: Sep 2015 |
QUOTE(Jagalat @ Jan 10 2016, 04:45 PM) BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do... Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched?![]() I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing. |
|
|
Jan 10 2016, 10:06 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
QUOTE(zerohedge @ Jan 10 2016, 08:09 PM) Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched? Haha...your other friend / identity didn't tell you?I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing. There are 3bedrooms units for Ekocheras but very limited units. The launching psf is approx RM700+(higher floor higher, lower floor lower) Typical launching price tag is shown in the first few posts below...Hunt for those bumi units(yellow stickers ) if you are interested.... https://forum.lowyat.net/topic/3235184 |
|
|
Jan 11 2016, 09:37 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
Received angpau envelope from Ekovest..
|
|
|
Jan 11 2016, 11:10 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
918 posts Joined: Jan 2012 |
|
|
|
|
|
|
Jan 12 2016, 05:32 AM
|
![]() ![]()
Junior Member
112 posts Joined: Nov 2013 |
|
|
|
Jan 12 2016, 07:39 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
855 posts Joined: May 2010 From: Petaling Jaya, Selangor |
read somewhere that ekovest is controlled by hishammuddin's brother, right?
|
|
|
Jan 13 2016, 12:04 AM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
918 posts Joined: Jan 2012 |
|
|
|
Jan 13 2016, 06:31 AM
|
![]() ![]()
Junior Member
112 posts Joined: Nov 2013 |
|
|
|
Jan 13 2016, 11:07 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
B3, B2, B1, LG, G, L1 and L2 floors are commonly connected across EKC.
For now BlkJ is heading to B1(floor not revealed per last Sunday). Other buildings will be slower. Is there a time that all common floors needed to be connected horizontally then followed by vertical construction? If such time exists, then the waiting time of BlkJ depends on progress on other buildings. In other word, the next billing of BlkJ will also not that soon. Any insider or expert opinion? |
|
|
Jan 17 2016, 09:33 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
BlkJ, taken this afternoon before raining. ![]() |
|
|
Jan 17 2016, 09:35 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
5,947 posts Joined: Oct 2013 |
BlkH, unobstructed view after the "soil island" being cleared... ![]() |
| Change to: | 0.0235sec
0.25
6 queries
GZIP Disabled
Time is now: 3rd December 2025 - 07:14 AM |