Outline ·
[ Standard ] ·
Linear+
Investment EKOCHERAS @ JALAN CHERAS (V4) [MRT PROPERTY] [OT], Where Cheras becomes Mont'Jiulai
|
Jagalat
|
Jan 6 2016, 11:18 AM
|
|
QUOTE(lamode @ Jan 6 2016, 10:54 AM) Great! Pictures show there is dedicated flyover linking to the site .
|
|
|
|
|
|
mybenz
|
Jan 6 2016, 11:38 AM
|
|
With the direct access to mrr2, those going to ekc no need to pass through the Cheras roundabout and Jalan Cheras. This will give ekc more access option.
|
|
|
|
|
|
Jagalat
|
Jan 6 2016, 12:24 PM
|
|
Upon further inspection on the pictures, understand it is for artist impression or illustration purpose, the road ramps seem to be a bit cacat, as follow, 1) Is each ramp bidirectional? If so, then what is the purpose of having two ramps at the same side of MRR2? If not, then where is the entrance and exit from the other side of MRR2(ie from Billion/Bkt Tiara side)side? (Imagine l came from Pandan using MRR2 wishing to enter the site)
This post has been edited by Jagalat: Jan 6 2016, 12:25 PM
|
|
|
|
|
|
lamode
|
Jan 6 2016, 02:06 PM
|
|
QUOTE(Jagalat @ Jan 6 2016, 12:24 PM) Upon further inspection on the pictures, understand it is for artist impression or illustration purpose, the road ramps seem to be a bit cacat, as follow, 1) Is each ramp bidirectional? If so, then what is the purpose of having two ramps at the same side of MRR2? If not, then where is the entrance and exit from the other side of MRR2(ie from Billion/Bkt Tiara side)side? (Imagine l came from Pandan using MRR2 wishing to enter the site) Based on the pics, i think it's not b- directional, one for entry, one for exit. perhaps they expecting people to make a u turn near the BTS LRT?
|
|
|
|
|
|
CMW123
|
Jan 6 2016, 03:36 PM
|
|
2a completion of piling billing issued for both Block J AND H?
|
|
|
|
|
|
Jagalat
|
Jan 7 2016, 10:43 AM
|
|
QUOTE(CMW123 @ Jan 6 2016, 04:36 PM) 2a completion of piling billing issued for both Block J AND H? Any blockH buyer in the forum, pls advise. Thanks.
|
|
|
|
|
|
gks
|
Jan 7 2016, 10:45 AM
|
|
QUOTE(Jagalat @ Jan 7 2016, 10:43 AM) Any blockH buyer in the forum, pls advise. Thanks. Regardless the differential progress between block J & H, both blocks have to be VP-ed and obtain CCC in the same time.
|
|
|
|
|
|
Jagalat
|
Jan 7 2016, 10:59 AM
|
|
QUOTE(lamode @ Jan 6 2016, 03:06 PM) Based on the pics, i think it's not b- directional, one for entry, one for exit. perhaps they expecting people to make a u turn near the BTS LRT?b Looks like it....inconvenience.... Those who wish to visit the Vmall, upon reaching at Tasik Selation Uturn, may have a second thought heading to BJ or Paradigm2, instead...
|
|
|
|
|
|
Jagalat
|
Jan 7 2016, 04:37 PM
|
|
QUOTE(gks @ Jan 7 2016, 11:45 AM) Regardless the differential progress between block J & H, both blocks have to be VP-ed and obtain CCC in the same time. Yes, same VP time. One benefit of updating the billing request is to reflect the progress performance of individual block and buyers are pre-alerted to allocate money (those 70% loan)
|
|
|
|
|
|
ekorjiulai
|
Jan 8 2016, 05:46 AM
|
Getting Started

|
Any guesstimate on when we can expect the 2b billing?
|
|
|
|
|
|
peri peri
|
Jan 8 2016, 10:27 AM
|
|
very slow progress instead. maybe MRT work and traffic diversion affecting such
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 04:44 PM
|
|
Taken 3 hrs ago. BlkJ site
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 04:44 PM
|
|
BlkH...From this angle, can't see much significant progress... maybe need to find another angle
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 04:45 PM
|
|
BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do...
|
|
|
|
|
|
zerohedge
|
Jan 10 2016, 07:09 PM
|
New Member
|
QUOTE(Jagalat @ Jan 10 2016, 04:45 PM) BlkE...The red crane is swinging and working.... a lot of digging... this is the furthest zoom my phone can do...  Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched? I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing.
|
|
|
|
|
|
Jagalat
|
Jan 10 2016, 10:06 PM
|
|
QUOTE(zerohedge @ Jan 10 2016, 08:09 PM) Jagalat boss, are there any 3 bed room units in this project? At what PSF was it launched? I think Ekocheras will do well. Cheras second generation needs a place to stay. If one were to look at the existing housing in Taynton/Connaught/Segar, most are quite old and run down without G&G. Young families would definitely find Ekocheras more appealing. Haha...your other friend / identity didn't tell you? There are 3bedrooms units for Ekocheras but very limited units. The launching psf is approx RM700+(higher floor higher, lower floor lower) Typical launching price tag is shown in the first few posts below...Hunt for those bumi units(yellow stickers ) if you are interested.... https://forum.lowyat.net/topic/3235184
|
|
|
|
|
|
Jagalat
|
Jan 11 2016, 09:37 PM
|
|
Received angpau envelope from Ekovest..
|
|
|
|
|
|
soon9913
|
Jan 11 2016, 11:10 PM
|
|
QUOTE(ekorjiulai @ Jan 8 2016, 05:46 AM) Any guesstimate on when we can expect the 2b billing? Not mistaken should be build up to the floor u purchased
|
|
|
|
|
|
ekorjiulai
|
Jan 12 2016, 05:32 AM
|
Getting Started

|
QUOTE(soon9913 @ Jan 11 2016, 04:10 PM) Not mistaken should be build up to the floor u purchased Thanks bro, makes sense.
|
|
|
|
|
|
sendomike
|
Jan 12 2016, 07:39 AM
|
|
read somewhere that ekovest is controlled by hishammuddin's brother, right?
|
|
|
|
|