not much sound in this forum throughout the year
M Residence @ Rawang V2, aka MR1
M Residence @ Rawang V2, aka MR1
|
|
Oct 17 2015, 08:41 AM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,651 posts Joined: Oct 2010 |
nice , already VP.
not much sound in this forum throughout the year |
|
|
|
|
|
Oct 17 2015, 12:28 PM
|
![]() ![]()
Junior Member
57 posts Joined: Nov 2007 |
just bougth phase 1 subsales. end lot. How the braodband connections ? got unifi or streamyx ?
|
|
|
Oct 17 2015, 02:29 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
2,140 posts Joined: Jan 2013 |
|
|
|
Oct 17 2015, 05:22 PM
|
![]()
Junior Member
24 posts Joined: Nov 2009 |
|
|
|
Oct 18 2015, 04:28 AM
|
![]() ![]()
Junior Member
57 posts Joined: Nov 2007 |
|
|
|
Oct 18 2015, 07:11 PM
|
![]() ![]()
Junior Member
151 posts Joined: Nov 2005 |
Just checked my ph3 hse after some handover rectification.
Does anyone know where to get cleaners for the move clean-up? |
|
|
|
|
|
Oct 18 2015, 09:29 PM
|
![]()
Newbie
3 posts Joined: Oct 2015 |
|
|
|
Oct 18 2015, 10:44 PM
|
![]()
Junior Member
24 posts Joined: Nov 2009 |
|
|
|
Oct 19 2015, 08:32 AM
|
![]()
Newbie
3 posts Joined: Oct 2015 |
|
|
|
Oct 20 2015, 06:49 PM
|
![]()
Junior Member
33 posts Joined: May 2011 |
Anyone mind to share the value of ph4 intermediate price ?
|
|
|
Oct 26 2015, 01:01 PM
|
![]() ![]() ![]() ![]() ![]()
Senior Member
958 posts Joined: Nov 2007 From: Klang |
Hi all, I have a phase 2 intermediate unit to sell. Anyone interested can PM me. Thanks.
|
|
|
Oct 27 2015, 01:14 PM
|
![]()
Junior Member
43 posts Joined: Oct 2015 |
Anyone bought the Canal Link M Residenec unit. Why the canal looks so small just like "Longkang' only?
This post has been edited by Alan Chin: Oct 27 2015, 01:19 PM |
|
|
Oct 27 2015, 03:17 PM
|
![]()
Junior Member
43 posts Joined: Oct 2015 |
Anyone know what is the construction beside M-Avenue>? Is this construction for Hypermarket as proposed in the Master Plan?
|
|
|
|
|
|
Oct 27 2015, 04:07 PM
|
![]() ![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
3,812 posts Joined: Apr 2009 From: West Malaysia |
anyone been charged in electric bill although the meter shows 0 ?
|
|
|
Nov 2 2015, 09:49 AM
|
![]()
Junior Member
46 posts Joined: May 2015 |
Hi,
Did anyone here doing renovation work in M Residence need approval from management ? What kind of document or procedure for this ? I call customer care about this but he mentions need to fill some form and deposit RM 5000. He didn't mention what kind of renovation though. My renovation will be building awning and cover backyard with tiles, kitchen cabinet, and changing sliding door inside master bedroom to window. No extension involved in here so I don't think need approval from local authorities. My current house is quite far from Rawang so hopefully i wont need to travel back and forth because of missing documents or steps. Appreciate if anyone can help. Thank you in advance! Thanks This post has been edited by iluvcalculus: Nov 2 2015, 09:52 AM |
|
|
Nov 2 2015, 12:07 PM
Show posts by this member only | IPv6 | Post
#56
|
![]()
Junior Member
43 posts Joined: Oct 2015 |
QUOTE(iluvcalculus @ Nov 2 2015, 09:49 AM) Hi, Did anyone here doing renovation work in M Residence need approval from management ? What kind of document or procedure for this ? I call customer care about this but he mentions need to fill some form and deposit RM 5000. He didn't mention what kind of renovation though. My renovation will be building awning and cover backyard with tiles, kitchen cabinet, and changing sliding door inside master bedroom to window. No extension involved in here so I don't think need approval from local authorities. My current house is quite far from Rawang so hopefully i wont need to travel back and forth because of missing documents or steps. Appreciate if anyone can help. Thank you in advance! Thanks |
|
|
Nov 2 2015, 12:08 PM
Show posts by this member only | IPv6 | Post
#57
|
![]()
Junior Member
43 posts Joined: Oct 2015 |
No need if individual title for M Residence 1 only.
|
|
|
Nov 2 2015, 02:28 PM
|
![]() ![]()
Junior Member
151 posts Joined: Nov 2005 |
I think u can find the form in the house owners manual. I think u need to put a small deposit then declare what u want to do.
But if no demolition, no need for rubbish bin then it is simple installation. But if no form, the contractor can't come in or bring things out at will. It is always good to follow the procedure. |
|
|
Nov 9 2015, 10:35 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,559 posts Joined: Oct 2004 |
|
|
|
Nov 9 2015, 10:38 AM
|
![]() ![]() ![]() ![]() ![]() ![]()
Senior Member
1,559 posts Joined: Oct 2004 |
QUOTE(johnsl @ Oct 18 2015, 04:28 AM) At least 3 months to complete the transaction. It's freehold and under MPS + Daerah Gombak. so, i think should be quite fast as there won't be much restriction. You bought End Lot or Corner Lot? There is difference between both. End Lot = Unit that is side to a Small Lane which usually don't have any land. It only has extra windows. Corner Lot = First or Last unit of the House at each road. It usually has extra land at the side. It could be 40x70 or 35x70 depending on the unit location. If you bought corner lot, 650K is fair price. But if end lot, 650K is way too expensive. |
| Change to: | 0.0296sec
0.33
6 queries
GZIP Disabled
Time is now: 7th December 2025 - 12:12 PM |