Welcome Guest ( Log In | Register )

Outline · [ Standard ] · Linear+

> Bandar Bukit Raja ver 2

views
     
zackdanial
post Jun 22 2015, 01:17 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
anyone would be collection keys on 26th June ?
zackdanial
post Jun 22 2015, 05:23 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(Maggie_Freedom @ Jun 22 2015, 03:43 PM)
Saron owners, do you notice any defect on the property ? I went to see my house twice, see like everything ok ...
*
No pic?

zackdanial
post Jun 25 2015, 07:05 AM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
Tomorrow big day for me . Going to collect the keys at SD .
Any request ?
zackdanial
post Jun 25 2015, 08:04 AM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(achongs @ Jun 25 2015, 08:00 AM)
so fast ker 😛??!
byk cepat pindah
*
bukan pindah , just collect keys . if possible mau pasang lampu , grill . If possible too want to rent out
zackdanial
post Jun 25 2015, 08:21 AM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(achongs @ Jun 25 2015, 08:11 AM)
1.do not forget to test water leakage and water proofing in bathroom.
just open the water pipe, let water flow for about more than 30 minute.
then check whether there is water leakage through ceiling beam or wall.

2.also open water pipe at every sink including kitchen sink. then check whether got leakage or not at the bottom.

3.press the toilet water, and check whether got water leakage or not

4. please also ask the main contractor what type of piling their use for this house. if they say they use bakau piling, u can also applied the same method for your future house extension.

good luck bro. belanja teh tarik laa.. sudah bg banyak tips ni
*
Thank for the advice
zackdanial
post Jun 25 2015, 08:25 AM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(cclay @ Jun 25 2015, 08:17 AM)
Bro, thought it's for ur own stay? Previously so eager to get the keys, ingat mau masuk Raya ni.. ;p
*
hehehe . can stay there if got second wife . working at KLCC area , travel time will make me much older . Installment need to pay starting July . so no second wife must rent out lor
zackdanial
post Jun 25 2015, 08:47 AM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(achongs @ Jun 25 2015, 08:40 AM)
hi .. i'm also working near to klcc area (walking distance) .. between, where do you work bro?
*
Plaza 138 , opposite BSN Ampang
zackdanial
post Jun 26 2015, 12:23 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
Already collect the keys.House condition is ok.The house is small.


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image
zackdanial
post Jun 26 2015, 05:58 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(cclay @ Jun 26 2015, 05:57 PM)
Bro, what's the built up?
Land size 20 X 70?
*
i think 20*55 (build up ) land size 20*70 (if not mistaken )

zackdanial
post Jun 26 2015, 10:47 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
More pictures


Attached thumbnail(s)
Attached Image Attached Image Attached Image Attached Image Attached Image Attached Image
zackdanial
post Jun 27 2015, 10:47 AM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(cclay @ Jun 27 2015, 09:36 AM)
Bro Zackdanial, these r all the keys? Hehe sorry never collected a new house before.. ;p
*
All the keys for 1 unit of house.
zackdanial
post Jun 27 2015, 02:34 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(cclay @ Jun 27 2015, 11:27 AM)
What's the yellow box?
*
Usb thump drive make to look like key
zackdanial
post Jun 27 2015, 02:35 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(Black Red @ Jun 27 2015, 02:01 PM)
I have to agree, house is a bit small. room near the kitchen is small.
*
already collect keys? No picture?


zackdanial
post Jul 2 2015, 03:02 PM

Getting Started
**
Junior Member
65 posts

Joined: Sep 2012
QUOTE(fyruzs86 @ Jul 2 2015, 12:39 PM)
Yes please share..
*
my contractor will measure all grill works this week . Will update once i get a quotation

 

Change to:
| Lo-Fi Version
0.0541sec    0.42    8 queries    GZIP Disabled
Time is now: 28th March 2024 - 09:55 PM