QUOTE(zackdanial @ Jun 25 2015, 07:05 AM)
Bukak puasa at rumah baru..yeayBandar Bukit Raja ver 2
Bandar Bukit Raja ver 2
|
|
Jun 25 2015, 07:29 AM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
|
|
|
Jul 1 2015, 09:38 AM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(pkypky @ Jul 1 2015, 09:26 AM) new updates, the renovation can do for Saron. Previously maybe wrong communication by MPK and given wrong information. today check with MPK can do the renovation. for ground floor, you all can buy the ready plan from MPK, for 2nd level renovation, you all need to appoint architect to draw plan. Hi,The SnP didnt indicated for term of cannot renovation, even the sales gallery bbr given wrong info of cannot renovation. haiz.... Anyone know basically how much is the budget(roughly) for ground floor renovation. |
|
|
Jul 2 2015, 12:39 PM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Jul 2 2015, 05:51 PM
Return to original view | Post
#4
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(caviars @ Jul 2 2015, 05:28 PM) Got few quotation from nearby shops/seller around Setia Alam/BBR. For mild steel, powder coat, simple single bar design (cheapest) the pricing is from RM11.50 to RM 12 for window. For door it is between RM 16.50 to RM18 Caviars got contact if we do it ramai2 we might get better price.....hehehehTotal cost varies depending whether you want to put grill on kitchen window and door (option A) or choose to grill the whole tiled yard area (washing machine area, option B). Option A is cheaper Estimated total area and cost for option A - Door - 106 sqf x 17 = RM1802 - Window 121 sqf x 12 = RM 1452 - Total around RM 3.5K with GST Estimated total area and cost for option B - Doors 85 sqf x 17 = RM1445 - Window 105 sqf x 12= RM1260 - Yard grill 75 sqf x 17 = RM 1275 - Total around 4.3K with GST There is also additional cost for plating (RM 80-100) and grill handle (RM 100-RM120). Please take note that these are calculated cost. Vendor may give extra discount or add extra charges. Please share if you get any other quotation (hopefully cheaper). |
|
|
Jul 3 2015, 07:23 AM
Return to original view | Post
#5
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(caviars @ Jul 2 2015, 07:08 PM) Prices I show are from multiple shops. Cheapest is from a shop in Setia Alam which sell at RM11.5/RM16.50 psf. I don't know if they offer bulk discount (I didn't ask). I also want to join....I think it is hard to arrange for bulk buying since everyone has different budget and preference. However, if anyone here want to organize I may want to join. |
|
|
Jul 3 2015, 10:23 AM
Return to original view | Post
#6
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(Archronicles @ Jul 3 2015, 09:54 AM) Hopefully it is not the same for you. Glancing over to my neighbours I did not notice much (can only see outside & backyard lar..). Not all houses were built the same. Great Job Sir!!!! Very useful..Thanks. I took reference from aaronpang https://forum.lowyat.net/topic/385900 If anybody else is compiling a similar list hopefully it would be shared here as well |
|
|
|
|
|
Jul 7 2015, 07:43 AM
Return to original view | Post
#7
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Jul 7 2015, 04:35 PM
Return to original view | Post
#8
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Jul 8 2015, 07:49 AM
Return to original view | Post
#9
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(caviars @ Jul 7 2015, 08:13 PM) Attaching grille pics. These are priced at RM11.50/RM16.50. These are the lowest price I found. Dear CV where is the location?There is no additional change for color. You can choose white, black, silver etc at same price I really suggest you go and see (and feel) it yourself. |
|
|
Jul 14 2015, 07:36 AM
Return to original view | Post
#10
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Jul 14 2015, 08:33 AM
Return to original view | Post
#11
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(Peter_Ee @ Jul 14 2015, 08:26 AM) Went and collected my keys yesterday. I noticed one of my neighbour moved in already. I combine the two Q into 1 answer.... it is better to list the defect all together and sent to sime darby so u need not do too many complaints and sime darby may rectify the defect in 1 shot.... and sime darby will entertain by first come first serve basis...overall pretty happy to receive the unit. noob question though. 1) do we compile the defect list and one shot send to SD? 2) how long does SD take to rectify the defects? |
|
|
Jul 14 2015, 12:15 PM
Return to original view | Post
#12
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Jul 14 2015, 01:02 PM
Return to original view | Post
#13
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
|
|
|
Jul 14 2015, 05:12 PM
Return to original view | Post
#14
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(Archronicles @ Jul 14 2015, 05:05 PM) That is quite wrong. Why should they be any less superior in terms of quality? Remember, the total built-up size is not the same. If one were to fully extend Saron to double storey at the back, the cost of renovation itself would perhaps match Saron to Nobat . Mampu milik isn't an excuse to neglect finishings & quality. Seem quite criminal to me. It is rather dissapointing for them hide under the facade of "mampu milik". Just my opinion. I agree with u..so many defects in Saron. We should teach Sime Darby a lesson. |
|
|
Jul 15 2015, 07:27 AM
Return to original view | Post
#15
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(caviars @ Jul 14 2015, 07:58 PM) Need to know whether 3.8K include grill for yard area. If yes, then it is a great deal since wrought iron is more expensive than mild steel (if both powder coat). Not cover the Yard Area...and I manage to nego a bit..malu la asyik nego ...Final price I get is RM3.7k install on 25/26 July... Plan to move in completely after dat day.... |
|
|
Jul 29 2015, 04:38 PM
Return to original view | Post
#16
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Aug 6 2015, 10:08 AM
Return to original view | Post
#17
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
|
|
Aug 10 2015, 02:33 PM
Return to original view | Post
#18
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(zul_4E @ Aug 10 2015, 01:58 PM) Salam & Good Day, 1. Is it normal or abnormal the bathroom leak when we pool the toilet? I was told by a contractor that developer only waterproof the bathing area.. not all toilet floor. Is it true guys?Very interesting thread here. Looking forward to see the neighbours surrounding. BTW, when u guys moving in? Im planning to move in end of the month. Hopefully all goes well.. Got some question.. Hopefully sifu's here can clarify.. 1. Is it normal or abnormal the bathroom leak when we pool the toilet? I was told by a contractor that developer only waterproof the bathing area.. not all toilet floor. Is it true guys? Mine quite obvious, after 'pooling' the toilet for 20-30 mins water leak detected at the ceiling above staircase. 2. To those had lodge the complaints, how long does it take for SD to complete it? Do they ever reject the complaints/any items that we lodge? Regards from Jalan Mahligai 4D, Zul Mine quite obvious, after 'pooling' the toilet for 20-30 mins water leak detected at the ceiling above staircase. My answer: me also facing the same situation. complaint lodged last Saturday. 2. To those had lodge the complaints, how long does it take for SD to complete it? Do they ever reject the complaints/any items that we lodge? My answer: According to CS. will take about a month to response to our complaint but if serious case like water leakage, they will entertain urgently. |
|
|
Aug 11 2015, 09:19 AM
Return to original view | Post
#19
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
QUOTE(zul_4E @ Aug 11 2015, 09:00 AM) Noted for the crystal clear explanation. I hope that they can settle the complaints before I move in. I should have lodge the report 1st thing when I got the keys. Now installed the basic appliances and nee dto hand over the keys to them.. aiyaa... Boss, I already place my stuff to the house & install the lighting & so on.. and facing the same situation with u.they suggest fixing on Saturday with my present on site so I need not give them the spare key. |
|
|
Aug 11 2015, 10:09 AM
Return to original view | Post
#20
|
![]() ![]()
Junior Member
96 posts Joined: May 2014 From: Ijok Shah ALam Klang Bangsar |
|
| Change to: | 0.0623sec