Outline ·
[ Standard ] ·
Linear+
Elmina by Sime Darby v2, Part of Selangor Vision City
|
Victor3010
|
Apr 29 2016, 04:06 PM
|
|
QUOTE(elmond @ Apr 29 2016, 09:01 AM) total 1549.45 acres, name not sure yet. residential (bungalow, semi detached house, terrace house, strata housing plot and apartment) approximately 275.50 acres for a total of 9,048 units industrial proposed is non-polluting industry (Managed Industrial Business Park) which takes up an area of 215.78 acres commercial sector, which takes up 68.75 acres 37.58 acres of land for integrated school complex total population equivalent estimated to be 82,103
The patch of green circled yellow is not Sime Darby's one right? Is it part of the 1549 acres?
|
|
|
|
|
|
Victor3010
|
Oct 6 2016, 06:17 PM
|
|
Elmina Garden ring road is pretty narrow, only one lane each direction
|
|
|
|
|
|
Victor3010
|
Oct 6 2016, 06:23 PM
|
|
QUOTE(elmond @ Oct 6 2016, 11:20 AM) elmina green no direct GCE access, it's either paya jaras interchange, elmina interchange or bukit subang interchange i read a report mention direct access will only be reviewed when GCE concession expired. elmina interchange is more than sufficient
|
|
|
|
|
|
Victor3010
|
Apr 7 2017, 02:17 PM
|
|
Just hope the portion at LDP and penchala are properly grade separated interchange
Empire city was initially zone as highway interchange reserve
|
|
|
|
|
|
Victor3010
|
Feb 12 2018, 02:52 PM
|
|
QUOTE(elmond @ Feb 12 2018, 07:28 AM) you are wrong, those paid denai alam tol, actually no need pay rrim tol. its design such way to reduce tol as max two only until penchala and redice the traffic interrupt for end to end connection due to many entry exit) you can observe the design at minute 4:00 (subang airport interchange), there are a center zone that dedicated for denai alam tol (access from puncak perdana, alam sutera or future elmina) all cars after denai alam tol will need to paid rrim tol, ( access from denai alam, GCE, kampung subang, subang 2, airport road, subang bestari, kwasa) the last tol (cant recall the name) is compulsory for all cars That part of the highway will be between 10lanes to 12lanes wide then... around 3km long.. something like SMART tunnel toll collection at Jalan Sungai Besi This post has been edited by Victor3010: Feb 12 2018, 02:58 PM
|
|
|
|
|