This is my 1st post so pardon me for being noob.
Need to seek some help urgently as my boss as me to settle this. *tic toc *tic toc
Our current opis is a semi D factory @ Bukit Jelutong under MBSA. The company shifted here last year and did some roof extension with zing wall [like a storage area] at the back of the building but within compound. Paid RM1K to some MBSA tuan tuan thru the contractor. I wasn't with the company yet @ that moment.
FYI, the storage area is 3-4 feet away of the perimeter brick wall, back and side.
Then last month we did another roof extension as our main business is selling construction material, need lots of space for storage. But this time is the side and there are no wall, only zing roof.
But we were so lucky that during this year roof extension,
But what i want to do is to get an approval for this, if they need submission of drawing or whatsoever should be not problems. I don't mind to submit all that as long i can get approval or permit and no more supplying teh tarik then is great rdy.
Any of you guys had any similar experienced? Hope you guys can help n i really need any advice there is we can think off.
Apr 13 2015, 04:24 PM, updated 11y ago