The path to mrt station seems very dodgy to me...would you/your tenant take the path to mrt?
Investment The Annex, @Connaught Place
Investment The Annex, @Connaught Place
|
|
Sep 26 2017, 02:39 PM
Return to original view | Post
#1
|
![]() ![]()
Junior Member
147 posts Joined: Jun 2016 |
The path to mrt station seems very dodgy to me...would you/your tenant take the path to mrt?
|
|
|
Sep 26 2017, 03:01 PM
Return to original view | Post
#2
|
![]() ![]()
Junior Member
147 posts Joined: Jun 2016 |
QUOTE(wkkor @ Sep 26 2017, 02:51 PM) It's will build a pedestrian bridge at level 3, across the road connect to their phase 2 site which is beside Cheras Sentral Mall. May I know which part it seem very dodgy to you? That's when Phase 2 is done, which is 3-4 years after the completion of this. Well, most of it...have you tried walking to the station? |
|
|
Oct 2 2017, 12:44 AM
Return to original view | Post
#3
|
![]() ![]()
Junior Member
147 posts Joined: Jun 2016 |
QUOTE(wkkor @ Oct 1 2017, 03:31 PM) My 2 routes walking experience from Annex site to Taman Connaught MRT Station Great vid mate...besides u can't walk through the mall in the early morningRoute 1 walking experience from Annex site, to Taman Connaught MRT Station: https://www.youtube.com/watch?v=IOfPMo-fX1Q Time frame description 00:00 ~ 00:47 = Pedestrian bridge will be ready for phase 1 (before phase 2) across the road 00:55 ~ 02:28 = passing by land belong to phase to, which will be close when launch 02:29 ~ 03:26 = heading to Cheras Sentral mall - Level 1. Bridge link to MRT station is under construction, which the security guide telling will be ready next month 03:48 ~ 05:02 = The bridge in Cheras Sentral mall - Level 1 link to MRT station 03:27 ~ 06:38 = Go to Cheras Sentral mall - Level LG and exit from mall and go to MRT station. 06:38 = Go straight that direction is counter and gate to enter Taman Connaught MRT 06:40 ~ 7:07 = The bridge in Cheras Sentral mall - Level 1 link to MRT station ############################################################################ Route 2 walking experience from Annex site, to Taman Connaught MRT Station: https://www.youtube.com/watch?v=oqQxmocuKZA Time frame description 00:00 ~ 00:06 = Pedestrian bridge will be ready for phase 1 (before phase 2) across the road 00:07 ~ 05:18 = heading to Taman Connaught MRT Station |
| Change to: | 0.0189sec
1.56
7 queries
GZIP Disabled
Time is now: 17th December 2025 - 01:23 AM |