Welcome Guest ( Log In | Register )

16 Pages « < 2 3 4 5 6 > » Bottom

Outline · [ Standard ] · Linear+

 ~ Home sweet home renovation journey ~, 18x65, 1506 sq

views
     
TSGalaxy Angel
post Feb 9 2015, 12:10 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(Winter_s @ Feb 9 2015, 10:29 AM)
Bro. Want to ask...how much did you pay for the MBSA permit ?
*
I done for myself at Wisma MBSA, very fast approval, within 1 hour as soon as the documents you bring complete. Will share more once I go back home.
TSGalaxy Angel
post Feb 9 2015, 10:30 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



Total paid for MBSA was RM 2544, including RM 1000 deposit for Alam Flora Tong RORO, RM500 deposit for process plan and RM 200 for deposit to put construction materials.
After complete renovation, can get back RM 1200, can't get back the RM500 as my extended kitchen was slab instead of roof.
Means total paid for permit was RM 1344.
robinsonspree
post Feb 10 2015, 12:42 AM

New Member
*
Newbie
2 posts

Joined: Aug 2009
From: Shah Alam


QUOTE(Galaxy Angel @ Feb 7 2015, 02:29 AM)
Below are the costing for each items:

Extended wet kitchen including 5FT concrete table top, plumbing and 12FT x 3FT concrete table top at dry kitchen = RM19,800
Hack & install 3 panels window for living room = RM1350
Hacking for security door at living room = RM600
Convert master bedroom window to sliding door so can access to bacoly = RM1600
Plaster ceiling whole house (living & dining L box light through) including down light and ceiling fan wiring = RM7600
Labour to paint for whole house 18 x 65 = RM1750
Convert wooden skriting to tiles skriting whole house = RM800
2 ways wiring and 6 light points for staircase = RM700
Labour cost to lay tiles and build concrete fencing at bacoly = RM3000
Hack and convert master bathroom sink to semi-recess = RM1500
Auto gate amour cable, main gate pillar and door bell wiring, plug points, air-con point, left & right cover up by red brick and water filter plumbing at car porch = RM3500

So total about RM42k

Below 3 items was build by cabinet company:

TV console 8FT = RM2470
Kitchen cabinet L sharp 3G glass 17FT x 3FT full height 10 FT = RM8700
Wardrobe 9 FT add 2 more drawers = RM3140

Total about RM14k

Grand total about RM56k for this but not yet include the cost for paints, tiles, security door and lighting.
*
Is all work (except cabinet) done by the same contractor? Mind to share the contact?
Winter_s
post Feb 10 2015, 11:29 AM

New Member
*
Junior Member
28 posts

Joined: Jun 2013
QUOTE(Galaxy Angel @ Feb 9 2015, 10:30 PM)
Total paid for MBSA was RM 2544, including RM 1000 deposit for Alam Flora Tong RORO, RM500 deposit for process plan and RM 200 for deposit to put construction materials.
After complete renovation, can get back RM 1200, can't get back the RM500 as my extended kitchen was slab instead of roof.
Means total paid for permit was RM 1344.
*
Tq bro. Did you need to submit engineering drawing ?
TSGalaxy Angel
post Feb 10 2015, 12:39 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(robinsonspree @ Feb 10 2015, 12:42 AM)
Is all work (except cabinet) done by the same contractor? Mind to share the contact?
*
Will share once he is back from Indonesia.
TSGalaxy Angel
post Feb 10 2015, 12:41 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(Winter_s @ Feb 10 2015, 11:29 AM)
Tq bro. Did you need to submit engineering drawing ?
*
No need, since I only extend 1 story for kitchen.
zyde
post Feb 10 2015, 12:59 PM

Getting Started
**
Junior Member
296 posts

Joined: Sep 2008
Nice reno.

This is subsale house right? Can u share floorplan before n after reno?

Thanks smile.gif

This post has been edited by zyde: Feb 10 2015, 01:00 PM
Edmund han
post Feb 11 2015, 01:46 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2015
nice job on ur new house reno
it looks great and awesome
most of ur reno work are quite cheap
can see that u do ur own research and homework in ur reno work
TSGalaxy Angel
post Feb 12 2015, 12:18 AM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(zyde @ Feb 10 2015, 12:59 PM)
Nice reno.

This is subsale house right? Can u share floorplan before n after reno?

Thanks smile.gif
*
New house.
TSGalaxy Angel
post Feb 12 2015, 12:26 AM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(Edmund han @ Feb 11 2015, 01:46 PM)
nice job on ur new house reno
it looks great and awesome
most of ur reno work are quite cheap
can see that u do ur own research and homework in ur reno work
*
In deep, started to do survey 1.5 years ago before renovation start. Just kitchen cabinet contractor alone, already compared about 10 contractors... Finally choose Welco.
Other such as pro-seduce to apply MBSA permit, where to get the tiles, paints, LED lighting, what brand of security door, ceiling fan, dining table, grill, mosquito net, fridge, washer, basin, kitchen sink, water filter, hoob, gas hob and etc etc.....

This post has been edited by Galaxy Angel: Feb 12 2015, 01:45 PM
Edmund han
post Feb 12 2015, 01:38 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2015
QUOTE(Galaxy Angel @ Feb 12 2015, 12:26 AM)
In deep, started to do survey 2 years 1.5 years ago before renovation start. Just kitchen cabinet contractor alone, already compared about 10 contractors... Finally choose Welco.
Other such as pro-seduce to apply MBSA permit, where to get the tiles, paints, LED lighting, what brand of security door, ceiling fan, dining table, grill, mosquito net, fridge, washer, basin, kitchen sink, water filter, hoob, gas hob and etc etc.....
*
giv u a like bro thumbup.gif
i am doing research too , new house getting key in mid 2015
now i onli know there is a lot of thing to do , comparing , sourcing and many more
now most of my weekend i spend my time in hardware , eletronic store , contractor workplace
wanna fainted oredi rclxub.gif
btw saw u r using rinai hob and hood , i plan to buy a rinnai promotion package that end on this month
do u start using them?
if i not wrong ur hob is RB-2MYG with 5.3kw flame rite?
how does the hob and hood perform? beyond expectation?

TSGalaxy Angel
post Feb 12 2015, 03:44 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(Edmund han @ Feb 12 2015, 01:38 PM)
giv u a like bro thumbup.gif
i am doing research too , new house getting key in mid 2015
now i onli know there is a lot of thing to do , comparing , sourcing and many more
now most of my weekend i spend my time in hardware , eletronic store , contractor workplace
wanna fainted oredi rclxub.gif
btw saw u r using rinai hob and hood , i plan to buy a rinnai promotion package that end on this month
do u start using them?
if i not wrong ur hob is RB-2MYG with 5.3kw flame rite?
how does the hob and hood perform? beyond expectation?
*
Me either, that time when sourcing for the renovation stuff, been to almost every fair/expo/homedec.

Yup, using gas hob RB-2MYG with RH-9023A hood, total RM2270, that is the BEST price I can get after surveying.

Currently staying alone, didn't use it for cooking, can't comment how is the performance. Will share more afterward.
zyde
post Feb 12 2015, 03:44 PM

Getting Started
**
Junior Member
296 posts

Joined: Sep 2008
QUOTE(Galaxy Angel @ Feb 12 2015, 12:18 AM)
New house.
*
Not concern with developer warranty?
TSGalaxy Angel
post Feb 12 2015, 03:53 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(zyde @ Feb 12 2015, 03:44 PM)
Not concern with developer warranty?
*
There is a 18 or 20 months (can't remember which 1) warranty from developer if there is any defects from the house.
Already ask developer to fix all the defects before start renovation.
KVReninem
post Feb 12 2015, 06:40 PM

IX
*******
Senior Member
5,369 posts

Joined: Jan 2003
QUOTE(Galaxy Angel @ Feb 6 2015, 04:47 AM)
Renovation basically completed within 1 month.
Kitchen cabinet, master room wardrobe and TV console was build by cabinet company afterward.

After - Front View

*
Hi, Mind sharing what wood is that? is it custom made or?

» Click to show Spoiler - click again to hide... «

Edmund han
post Feb 12 2015, 07:54 PM

New Member
*
Junior Member
9 posts

Joined: Feb 2015
QUOTE(Galaxy Angel @ Feb 12 2015, 03:44 PM)
Me either, that time when sourcing for the renovation stuff, been to almost every fair/expo/homedec.

Yup, using gas hob RB-2MYG with RH-9023A hood, total RM2270, that is the BEST price I can get after surveying.

Currently staying alone, didn't use it for cooking, can't comment how is the performance. Will share more afterward.
*
Ur package is really cheap ,
package deal is around 3k n the electronic shop offer to u 2.2k
Too bad I stay in johor area ,i source many place oredi
Hob same as ur model meanwhile hood I choose RH-C779-SB with 1000m3 suction power
The best deal I get rm2.5k
Cheaper than catalogue 200++
They even told me after new year ,the price is going to increase coz of the GST
Zzzzz...
TSGalaxy Angel
post Feb 12 2015, 11:02 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(KVReninem @ Feb 12 2015, 06:40 PM)
Hi, Mind sharing what wood is that? is it custom made or?

» Click to show Spoiler - click again to hide... «

*
Solid wood from Ikea, look for Norbo RM159. icon_rolleyes.gif

This post has been edited by Galaxy Angel: Feb 12 2015, 11:14 PM
TSGalaxy Angel
post Feb 12 2015, 11:07 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(Edmund han @ Feb 12 2015, 07:54 PM)
Ur package is really cheap ,
package deal is around 3k n the electronic shop offer to u 2.2k
Too bad I stay in johor area ,i source many place oredi
Hob same as ur model meanwhile hood I choose RH-C779-SB with 1000m3 suction power
The best deal I get rm2.5k
Cheaper than catalogue 200++
They even told me after new year ,the price is going to increase coz of the GST
Zzzzz...
*
Sad to hear that, I knew the package deal that you mentioned, something like mix and match.... got free plate or source pan depend which package you choose.
Else can introduce you to my friend, he is selling this. Only the gas hob RB-2MYG he sell for RM790.
Edmund han
post Feb 13 2015, 07:39 AM

New Member
*
Junior Member
9 posts

Joined: Feb 2015
QUOTE(Galaxy Angel @ Feb 12 2015, 11:07 PM)
Sad to hear that, I knew the package deal that you mentioned, something like mix and match.... got free plate or source pan depend which package you choose.
Else can introduce you to my friend, he is selling this. Only the gas hob RB-2MYG he sell for RM790.
*

Ya bro
The hob I been quoted rm1k in jb area
The price different so much between kl and jb
Too sad I stay in southern region , if not can ask u recommend to ur fren shop
TSGalaxy Angel
post Feb 13 2015, 09:48 PM

On my way
****
Senior Member
584 posts

Joined: Feb 2006
From: Kuala Lumpur



QUOTE(Edmund han @ Feb 13 2015, 07:39 AM)
Ya bro
The hob I been quoted rm1k in jb area
The price different so much between kl and jb
Too sad I stay in southern region , if not can ask u recommend to ur fren shop
*
Bro, try to survey around, if you are not rush, I believe can get more cheaper that the price they offer you now.

16 Pages « < 2 3 4 5 6 > » Top
 

Change to:
| Lo-Fi Version
0.0285sec    0.51    6 queries    GZIP Disabled
Time is now: 3rd December 2025 - 04:05 PM