QUOTE(elmond @ Mar 27 2015, 04:00 PM)
after station awam besar complete, the proposed road link bukit oug to  jalan jalil perkasa 1, do you think parklane oug owner still use the new interchange with toll?

the demand will not sufficient to bare the cost.
*
The demand will still be very high because :-

1. OUG parklane has a huge number of units.
2. The road from Muhibbah LRT station to jalan jalil perkasa and finally to Kesas is expected to be super jam.

Babizz
post Mar 27 2015, 08:01 PM

10k Club
********
All Stars
12,385 posts

Joined: Feb 2013
QUOTE(twincharger07 @ Mar 27 2015, 01:23 AM)
There is already  bridge from ParkLane to LRT
and the government will make sure you pay toll before entering bukit jalil or OUG, the interchange will never exist.
*
I mean covered walkway from parklane to the lrt station.. no need to drive thr.. enuf of driving in KV rclxm9.gif rclxm9.gif
Babizz
post Mar 27 2015, 08:07 PM

10k Club
********
All Stars
12,385 posts

Joined: Feb 2013
the link road frm b jalil to z residence side has been a rumour for way too long. hopefully it cn be completed soon la..

btw, the lrt ampang extension looks like cnt finish this yr la..delay maybe q2 2016..
tnang
post Mar 27 2015, 08:07 PM

Look at all my stars!!
*******
Senior Member
2,536 posts

Joined: Apr 2011
QUOTE(Babizz @ Mar 27 2015, 08:01 PM)
I mean covered walkway from parklane to the lrt station.. no need to drive thr.. enuf of driving in KV  rclxm9.gif  rclxm9.gif
*
+1
Babizz
post Mar 27 2015, 09:01 PM

10k Club
********
All Stars
12,385 posts

Joined: Feb 2013
QUOTE(tnang @ Mar 27 2015, 06:07 AM)
+1
*
Then u cn increase ur rental 1.6 or 1.8k after completion.. drool.gif drool.gif

Some ppl only look at it frm d capital appreciation side, im looking at how to get more ppl to use public transport without having to drive n park thr cos there will nt be enuf park n ride facilities in d long run icon_idea.gif
TS1282009
post Mar 27 2015, 10:14 PM

Look at all my stars!!
*******
Senior Member
4,043 posts

Joined: Jan 2009
QUOTE(Babizz @ Mar 27 2015, 08:07 PM)
the link road frm b jalil to z residence side has been a rumour for way too long. hopefully it cn be completed soon la..

btw, the lrt ampang extension looks like cnt finish this yr la..delay maybe q2 2016..
*
http://www.themalaymailonline.com/malaysia...-october-launch

Prasarana: Ampang Line LRT extension Phase 1 on track for October launch

KUALA LUMPUR, March 7 — The light railway transit (LRT) line extension project for Ampang Line is on track and the first phase is scheduled to be operational by the end of October 2015.

In a statement today, Prasarana Malaysia Bhd said the second set of the eight new six-car light rail vehicles (LRVs) for the Ampang Line arrived today and had been transported to the Ampang LRT depot for inspection before undergoing testing and commissioning.

The first phase of the project would extend the existing Ampang Line to four new stations — Awan Besar, Alam Sutera, Muhibbah and Kinrara BK5.

“We are on track to have the first eight of the contracted 50 sets of six-car trains for operations in October," said Prasarana Malaysia Bhd Group Director for Project Development, Datuk Ir Zohari Sulaiman.

Zohari said the third and fourth set of six-car LRVs were scheduled for arrival at the same time next month.

The Ampang Line Extension starts from Sri Petaling Station and passes through Kinrara, Puchong and ends at Putra Heights.

The extension is 18.1km long with 11 new stations.

Combined with the existing line, the total length of Ampang Line after the completion of the LRT Line Extension Project will be 45.1km. — Bernama



This post has been edited by 1282009: Mar 27 2015, 10:15 PM
Babizz
post Mar 28 2015, 08:10 AM

10k Club
********
All Stars
12,385 posts

Joined: Feb 2013
Yeap i read tht article but if u refer to the skyscraper forum & if u look at it urself la u cn see tht we hv 6 months to go n so much left to do..
Chris Chew
post Mar 28 2015, 11:15 AM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
QUOTE(Babizz @ Mar 28 2015, 08:10 AM)
Yeap i read tht article but if u refer to the skyscraper forum & if u look at it urself la u cn see tht we hv 6 months to go n so much left to do..
*
Haha true.

Among the Phase 1 ( 4 stations ), I only see Sta 1 ( Awan Besar ) is ready ... Sta 2 to 4, all in Kinrara looks like rushing job to complete it till rooftop and test the trains bfore operation in 6 months time.

Since the trains are ready, then I think 9 mths is sufficient time as I believe 3 mths is more than enough to complete current station structure.
puchongite
post Mar 28 2015, 11:29 AM

20k VIP Club
*********
All Stars
29,254 posts

Joined: May 2008
If we read the wordings it seems they are talking about launching it in phases, ie first phase is upto kinrara bk 5, ie October for phase 1. Full stretch will take longer time.
Babizz
post Mar 28 2015, 04:12 PM

10k Club
********
All Stars
12,385 posts

Joined: Feb 2013
QUOTE(Chris Chew @ Mar 27 2015, 09:15 PM)
Haha true.

Among the Phase 1 ( 4 stations ), I only see Sta 1 ( Awan Besar ) is ready ... Sta 2 to 4, all in Kinrara looks like rushing job to complete it till rooftop and test the trains bfore operation in 6 months time.

Since the trains are ready, then I think 9 mths is sufficient time as I believe 3 mths is more than enough to complete current station structure.
*
Yeap.. btw, r they building sound barriers nearby since the LRT will be quite close to a few apartments?
Chris Chew
post Mar 28 2015, 04:57 PM

10k Club
********
Senior Member
10,387 posts

Joined: Dec 2011
QUOTE(Babizz @ Mar 28 2015, 04:12 PM)
Yeap.. btw, r they building sound barriers nearby since the LRT will be quite close to a few apartments?
*
Unsure, but I dont think it would be a huge issue.

This post has been edited by Chris Chew: Mar 28 2015, 04:57 PM
theballer
post Mar 28 2015, 09:42 PM

Enthusiast
*****
Junior Member
705 posts

Joined: Mar 2013
QUOTE(Babizz @ Mar 27 2015, 10:14 AM)
already gt clothes hanging.. future PPR parklane  drool.gif  drool.gif
*
hanging clothes balcony very common lerrrr
hey_there
post Mar 29 2015, 02:01 PM

Regular
******
Senior Member
1,600 posts

Joined: Aug 2011
whats the market price for a 2 carpark unit? Anyone knows?
hey_there
post Mar 29 2015, 02:11 PM

Regular
******
Senior Member
1,600 posts

Joined: Aug 2011
Hi all,

May I know is Oug parklane a freehold or leasehold property? Saw some posts in iproperty with leasehold and some freehold.
tnang
post Mar 29 2015, 02:58 PM

Look at all my stars!!
*******
Senior Member
2,536 posts

Joined: Apr 2011
QUOTE(hey_there @ Mar 29 2015, 02:11 PM)
Hi all,

May I know is Oug parklane a freehold or leasehold property? Saw some posts in iproperty with leasehold and some freehold.
*
Freehold. All
hey_there
post Mar 29 2015, 03:15 PM

Regular
******
Senior Member
1,600 posts

Joined: Aug 2011
QUOTE(tnang @ Mar 29 2015, 02:58 PM)
Freehold. All
*
Thanks
la bella
post Mar 31 2015, 11:18 AM

Enthusiast
*****
Senior Member
948 posts

Joined: May 2008
Just moved in to orange block 3 days ago. Something wrong with the plumbing, kitchen area sink is clogged. Water is not draining at all and almost flooded my yard. Complained to management, no people come to fix yet. Haizz.. And the bathroom/toilet got strong sewerage smell in the day time, night time less strong. rclxub.gif

This post has been edited by la bella: Mar 31 2015, 04:38 PM
honkkydorry
post Apr 1 2015, 11:28 AM

On my way
****
Senior Member
671 posts

Joined: May 2012


Anyone selling their unit? PM me price can? A friend is looking for property to buy.
JustNobody
post Apr 1 2015, 11:33 AM

Look at all my stars!!
*******
Senior Member
2,004 posts

Joined: Mar 2011
QUOTE(honkkydorry @ Apr 1 2015, 11:28 AM)
Anyone selling their unit? PM me price can? A friend is looking for property to buy.
*
Last week saw an agent got unit for urgent to let go, about 400K.. You can go to Cari Chinese Forum.

juicyliana
post Apr 1 2015, 01:41 PM

when u think juicy, think liana
*****
Senior Member
746 posts

Joined: Aug 2011
From: Lowyat.net
QUOTE(la bella @ Mar 31 2015, 11:18 AM)
Just moved in to orange block 3 days ago. Something wrong with the plumbing, kitchen area sink is clogged. Water is not draining at all and almost flooded my yard. Complained to management, no people come to fix yet. Haizz.. And the bathroom/toilet got strong sewerage smell in the day time, night time less strong.  rclxub.gif
*
I heard that the akisama management force owners to sign the vacant possession letter but don't let you check the condition of the house without signing.

some owners signed and waited 2 months but still no repairs yet.