I'll be at Lake Point Residence Sales Gallery today, Sunday 18th January 2015.
Anyone who would like to drop by to have a look, please contact me. TQ
Lake Point @ Cyberjaya - Freehold 3 Storey G&G, New Developement Info sharing
Lake Point @ Cyberjaya - Freehold 3 Storey G&G, New Developement Info sharing
|
|
Jan 18 2015, 03:02 AM
Return to original view | Post
#41
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
I'll be at Lake Point Residence Sales Gallery today, Sunday 18th January 2015.
Anyone who would like to drop by to have a look, please contact me. TQ |
|
|
|
|
|
Jan 18 2015, 12:38 PM
Return to original view | Post
#42
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
Lake Point Residence Site Visit today: ![]() Piling complete. Ground beams almost complete. Foundation works looks like will be completing soon and superstructure work can commence. |
|
|
Jan 20 2015, 01:22 PM
Return to original view | Post
#43
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
QUOTE(puchongite @ Jan 20 2015, 09:20 AM) Always as in everytime I go and check lar. I thought it should be sold but everytime I check this thread, they still have a few % left. Kakaka In November 2014 the project was fully "Booked", as in all units had prospective buyers who had submitted a cheque to reserve the unit pending loan application and SPA signing.But since mid-December, some units were released again as there were initial buyers who couldn't get loan approval or just changed their mind and pulled out. Booking fees are fully refundable. It is pretty normal for any development in Malaysia to have a percentage of dropout and obviously the developer cant force those who booked to buy. Since last week Saturday, the buyers who have gotten their loans and have confirmed to buy have started signing their SPA. At that stage, the "booking" officially becomes a "sale". |
|
|
Jan 23 2015, 07:19 PM
Return to original view | Post
#44
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
House number 8 Jalan Lake Point Residence 4 is still available for booking.
There are about 10 units still available for booking including a corner unit. Please feel free to contact me for further details. TQ |
|
|
Jan 24 2015, 06:50 PM
Return to original view | Post
#45
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
I'll be at the Sales Gallery tomorrow, do contact me if anyone would like to drop by to have a look.
|
|
|
Jan 28 2015, 07:25 PM
Return to original view | Post
#46
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
One question I get sometimes regarding Lake Point Residence is regarding the drain which is located next to the development. This drain is part of the Rainwater Runoff Management System for Cyberjaya. Basically when it rains, the access rainwater is channeled via smaller drains into this drain which then channels it to the Lake across the road which functions as a rainwater retention pond. The water from this lake is then channeled towards the larger lake at the Cyberjaya Park.
While there is sometimes stigma against drains, this usually applies to older areas where all the drains are open and unfortunately some drains end up as dumping grounds for irresponsible parties which cause them to smell and become blocked. For new areas such as Cyberjaya, you'll notice that all drains are concealed therefore hardly any rubbish gets thrown in and they only channel rainwater. From the photos below, you'll see that this drain is probably cleaner than some rivers in KL: ![]() ![]() From the photos above, you'll also see that there is quite a wide buffer zone (approximately 20 ft) between the perimeter wall of Lake Point Residence, and the bank of the drain. When the future development on the current empty land on the other side comes up, there should also be a buffer of 20 ft to the drain, meaning the perimeter wall of the next development should be about 50ft away from the perimeter wall of Lake Point Residence. |
|
|
|
|
|
Jan 28 2015, 11:07 PM
Return to original view | Post
#47
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
|
|
Jan 29 2015, 12:44 PM
Return to original view | Post
#48
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
|
|
Jan 29 2015, 06:59 PM
Return to original view | Post
#49
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
QUOTE(radiax @ Jan 29 2015, 04:34 PM) Any plans from yan jian or even MPS to at least beautify / design the drain and surrounding areas?? Will mosquitoes or insects be an issue? Developer cant to much as the land belongs to either JPS (Jabatan Pengaliran & Saliran) or MPS (Majlis Perbandaraan Sepang). Mosquitoes breed in stagnant pools. The water in the drain is flowing and I've seen fish swimming inside as well.What about the perimeter fencing of lakepoint? I heard 6 feet tall, unsure solid wall or not.please enlighten.tq Yup, solid wall with CCTV surveillance |
|
|
Jan 31 2015, 03:20 AM
Return to original view | Post
#50
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
|
|
Feb 4 2015, 02:28 AM
Return to original view | Post
#51
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
New available unit for booking: 5 Jalan LPR 3 - Type C unit (T-Junction)
Priced below RM300psf Please don't ask me to PM info. If serious to book, call/whatsapp me at 012-2169026 ![]() |
|
|
Mar 22 2015, 10:16 PM
Return to original view | Post
#52
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
|
|
Mar 22 2015, 10:28 PM
Return to original view | Post
#53
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
QUOTE(kkk8787 @ Mar 22 2015, 04:31 PM) what you guys think about highrise in Lakepoint or Cyberjaya as a whole. Is it oversupplied? I was choosing between highrise and landed in lakepoint Lake Point 3storey house is priced only 10%-15% higher than some of the much smaller condo units being launched in Cyberjaya |
|
|
|
|
|
Mar 22 2015, 11:35 PM
Return to original view | Post
#54
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
QUOTE(kkk8787 @ Mar 22 2015, 10:32 PM) really?? my understanding of highrise in Cyber average 500-600...this Lakspoint terrace average 900-1million.. Yes, the typical 1,000sf++ units are only RM500k-RM600k, but obviously such small units are not a fair and reasonable comparison for a 3storey 2,900sf house. Eclipse Residence at Pangaea by OSK nearby apparently is selling their 990sf units for RM700k onwards though.For a more reasonable comparison, you can look at the launch price for those 1,700sf and above units, those are going for about RM800k+ Even for brand new Serin Residence, the 1,700sf+ and 2,000sf+ units are selling for RM800k-900k |
|
|
Mar 23 2015, 11:18 AM
Return to original view | Post
#55
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
For landed Gated & Guarded in Cyberjaya, total of existing houses plus incoming supply is just slightly below 3,000 units at the moment.
This post has been edited by R o Y: Mar 23 2015, 11:19 AM |
|
|
Mar 27 2015, 08:35 PM
Return to original view | Post
#56
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
One corner unit still available. Buyer who booked earlier couldn't get loan. Choice location.
Please contact me for further information. TQ |
|
|
Mar 28 2015, 03:58 PM
Return to original view | Post
#57
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
Work on site progressing fast. Below are photos from today's site visit:
![]() ![]() First Row (Jalan LPR 3 & Jalan LPR 4 south facing) : Ground floor column & beam with work started on 1st floor column ![]() Middle Row (Jalan LPR 4 north facing & LPR 5 south facing) : Ground floor column & beam almost done ![]() Last Row ( Jalan LPR 5 north facing) : 1st floor and 2nd floor columns in progress |
|
|
Apr 29 2015, 10:26 AM
Return to original view | Post
#58
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
|
|
Apr 29 2015, 11:50 AM
Return to original view | Post
#59
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
|
|
May 28 2015, 06:23 PM
Return to original view | Post
#60
|
![]() ![]() ![]() ![]() ![]()
Senior Member
930 posts Joined: Sep 2009 |
|
| Change to: | 0.0374sec
0.59
7 queries
GZIP Disabled
Time is now: 2nd December 2025 - 04:51 PM |