Bandar Rimbayu V3, The Township Nature Perfected, Green Township by IJM
|
waiDEE
|
Dec 12 2014, 11:26 AM
|
Getting Started

|
QUOTE(PeriPeri2014 @ Dec 12 2014, 11:16 AM) Actually Canal City how big?? Gamuda oso got land in Canal City?? i didn't heard gamuda got land in Canal City as well... but for comparison on map... previous Canal City plan vs. Rimbayu/TA/ES... the leftover land in between big lake quarry and Rimbayu not included in any developers... the original plan Canal City area starting from border Sg Kelang (just below PH/Kg Bkt Lanchong) thru Kg Lombong...
|
|
|
|
|
|
waiDEE
|
Dec 12 2014, 05:06 PM
|
Getting Started

|
QUOTE(phonixloo @ Dec 12 2014, 04:55 PM)  Wow... you are superb. Sometimes you just need the 'extra' pressure to push you for working hard..... But it is true, if you wait for longer time, you will end up with smaller house because our salary always can't catch up with the inflation. Trade up seems to be the only solution. Continue in this trend, bank will start offer the loan for "TWO" generation. Parents ==> Child For me, I'm a bit better than you. I had down payment + some fund for renovation / emergency. But I won't have enough for the monthly installment.  So now is the time to "TIGHT" my stomach...... hahaha... i korek sana sini for the DP... i proceed to buy just because I can get the loan... the rest...I'm thinking right now what to do...
|
|
|
|
|
|
waiDEE
|
Dec 12 2014, 05:20 PM
|
Getting Started

|
QUOTE(phonixloo @ Dec 12 2014, 05:18 PM)  Good to you...... I proceed to book once the bank officer said I'm eligible for the loan. Without think twice, pay the booking fees and proceed for loan arrangement.  VP soon...... already start service the interest...... must find one tougher tali to ikat my perut now..... ha ha ha luckily just start paying 2 month ago...and VP so soon...
|
|
|
|
|
|
waiDEE
|
Dec 12 2014, 05:20 PM
|
Getting Started

|
QUOTE(phonixloo @ Dec 12 2014, 05:18 PM)  Good to you...... I proceed to book once the bank officer said I'm eligible for the loan. Without think twice, pay the booking fees and proceed for loan arrangement.  VP soon...... already start service the interest...... must find one tougher tali to ikat my perut now..... ha ha ha luckily just start paying a month ago...and VP so soon... This post has been edited by waiDEE: Dec 12 2014, 05:20 PM
|
|
|
|
|
|
waiDEE
|
Jan 6 2015, 09:14 AM
|
Getting Started

|
QUOTE(kyle_kl @ Jan 6 2015, 12:04 AM) Anyone know chimes still available? i saw ppl selling in propertyguru 22x75 for RM780-RM800k? Actually i am comparing with Setia Alam new launch 2.5 storey (2330 sqf) RM790K, bigger built up but land size only 20x65. 2.5 storey 20x65 built up increase vertically...
|
|
|
|
|
|
waiDEE
|
Jan 14 2015, 10:07 AM
|
Getting Started

|
introducer scheme valid for this sunday balloting?
|
|
|
|
|
|
waiDEE
|
Jan 20 2015, 12:47 PM
|
Getting Started

|
it is a long way to go... KK-PH bridging vs. KK flyover (canceled)... as I shared the map before... no 1 location seem easiest for MBSA to realise on... while if everybody wanted direct connection to PH (2 or 3)... need help from Home Tree project to boost the process...and settling land acquisition process in Kg Bkt Lanchong... 5 years from now? may be? Attached thumbnail(s)
|
|
|
|
|
|
waiDEE
|
Jan 20 2015, 10:46 PM
|
Getting Started

|
QUOTE(kh8668 @ Jan 20 2015, 10:21 PM) Nope...but i think atleast 4 phases...and the current and first one is Long Branch... Updates:Home Tree got 5 phases... Phase 1 sold out..currently Phase 2..actually just extention of Phase 1..same design...about 8 design... The whole project completed by 2020... The connecting bridge is not inside Home Tree territory... further up at reserve land... This post has been edited by waiDEE: Jan 21 2015, 03:09 PM
|
|
|
|
|
|
waiDEE
|
Jan 26 2015, 11:22 AM
|
Getting Started

|
QUOTE(Kenneth Foo @ Jan 26 2015, 11:17 AM) Went to Phase 1 yesterday and noticed they are planting grass to the courtyard area including corner lot land area. yup corner/end lot getting cow grass like taman landscape as well... solar water heater in progress... contractors also busy do landscaping at main entrance roundabout...
|
|
|
|
|
|
waiDEE
|
Jan 26 2015, 12:40 PM
|
Getting Started

|
QUOTE(muhdmunir @ Jan 26 2015, 11:45 AM) i personally feel that the entrance structure is a bit underwhelming. I expected it to be much bigger (higher). What do you guys think? how to make it bigger or higher? that roundabout not just for rimbayu... later on will be entrance for TA & ES as well... u can see IJM only constructed the road at one side only at this moment... or u referring chimes entrance? for me it's naturally perfected...
|
|
|
|
|
|
waiDEE
|
Jan 27 2015, 02:03 PM
|
Getting Started

|
QUOTE(novel87 @ Jan 27 2015, 01:40 PM) Agree... We paying premium price but getting low cost product, should highlight this to IJM  ya lorr... i'm expecting concrete imprint as well... if we highlight to IJM...are they willing to change? 526 unit for chimes... currently i'm questioning them about street at the end of corner lot... some tarmac finishing and some brick finishing...but location & situation is the same... beside green area...
red circle is tarred...mostly in 24x75 and blue circle is bricked...mostly in 22x75... both... some connected with 2 road...and some not connected...
This post has been edited by waiDEE: Jan 27 2015, 02:05 PM
|
|
|
|
|
|
waiDEE
|
Jan 28 2015, 09:04 AM
|
Getting Started

|
QUOTE(jeghui @ Jan 28 2015, 08:17 AM) So I guess nothing we can do (getting concrete imprints for car porch and driveway). Wisteria gets porcelain tiles though. yup...then we can see individual creativity after this...
|
|
|
|
|
|
waiDEE
|
Feb 4 2015, 03:33 PM
|
Getting Started

|
QUOTE(jeghui @ Feb 4 2015, 03:02 PM) where got dato'. cucu pun xda lagi hehe. it was just "in the moment" kinda thing when i bought chimes. looking back with no regrets. elmina bought ariza double frontage. both developments are great IMHO. DA/Elmina also great... even outside from radius like Desa Coalfield also nice...
|
|
|
|
|
|
waiDEE
|
Feb 5 2015, 11:14 AM
|
Getting Started

|
QUOTE(hafizrahimi @ Feb 5 2015, 11:07 AM) i'm more worried about flood rather than tsunami... with rimbayu alone not so worried but with TA and EC starting their project afraid there could be problem with the irrigation during construction. from what i can see... 22x75 area slightly lower ground level compare to 24x75 area... from my naked eye laaa... but obviuosly front row 22x75 is lower than the road... This post has been edited by waiDEE: Feb 5 2015, 11:15 AM
|
|
|
|
|
|
waiDEE
|
Feb 5 2015, 11:41 AM
|
Getting Started

|
QUOTE(Dragonfly2014 @ Feb 5 2015, 11:33 AM) phonixloo very efficient And phew should be safe from tsunami, in case...lol seafood place oso not far, telok gong not much worry... selat melaka consider closed sea... and no active earth movement in sumatera that facing peninsular msia... the problem is bathymetry level and water table level relatively to surrounding area...
|
|
|
|
|
|
waiDEE
|
Feb 6 2015, 10:44 AM
|
Getting Started

|
QUOTE(novel87 @ Feb 6 2015, 12:00 AM) Rimbayu is flood prone area? Mind to share more? Thanks u can go to mdkl website... the area is not too low...but not high... already share in V2 thread... Flood Map
|
|
|
|
|
|
waiDEE
|
Feb 6 2015, 12:14 PM
|
Getting Started

|
QUOTE(Dragonfly2014 @ Feb 6 2015, 11:55 AM) hahaha...whole klang is in blueee... I half half believe this geo land level causing flood... see Kajang not in blue..and you all remember the serious flood happened in kajang years back? I think oso depend on deepness and blockage of river/longkang nearby... no... that not the way to interpret it... u can play around with the number (elevation height)... different location different height...and only applicable at that location only... for Rimbayu, generally is 13m above current sea level... sea level = ground water table... *the shortcut i gave is for Bandar Rimbayu...it is already save in their data bank... This post has been edited by waiDEE: Feb 6 2015, 12:16 PM
|
|
|
|
|
|
waiDEE
|
Feb 6 2015, 12:37 PM
|
Getting Started

|
QUOTE(Dragonfly2014 @ Feb 6 2015, 12:24 PM) no? the map not showing land height level? the short cut given is 13m, blue zone indicate <=13m, no meh? yup blue is <13m... indicate area Rimbayu is generally 13m above MSL... if u put other town, it will calculate height for that particular area... u can test for kajang... there is valley in the middle of kajang... when heavy rain and the river flow is slow, the ground water table increase in that area...that is why accumulate water and flooded...
|
|
|
|
|
|
waiDEE
|
Feb 6 2015, 04:48 PM
|
Getting Started

|
QUOTE(zzzhhhzzz @ Feb 6 2015, 04:27 PM) so cut land is better ? more solid and higher ? technically not really... both cut and filled need time to have stability back... when the original land/hill flatten, it less load and make it tendency to uplift... while for filled land, it has tendency to deposit or mendap... so proper earth work and soil investigation perhaps have been taken seriously earlier before...
|
|
|
|
|
|
waiDEE
|
Feb 8 2015, 03:48 PM
|
Getting Started

|
Mari..mari..mari... Last 4 end lot unit for Chimes... range RM1.04mill to RM1.2mill... everything included in price... just pay 10% dp... Do pm me to share RM1500 buyer get buyer package...hehehe
|
|
|
|
|