Outline ·
[ Standard ] ·
Linear+
Bandar Rimbayu V3, The Township Nature Perfected, Green Township by IJM
|
akh731
|
Feb 2 2015, 06:21 PM
|
|
QUOTE(lochness @ Feb 2 2015, 05:56 PM) Just visited perennia show unit. The sunroof really let in a lot of light for the intermediate units. But the plastic tiles roof look cheap. Maybe i will change it to tempered glass for all the tiles thr to let in more light. The indoor courtyard is a headache. Not sure wht to do with it or cover it up to have bigger space. Any creative ideas anyone? I also find the garbage bin storage area at the front gate have quite an awkward design. Not so easy accessible by garbage man. I think i will redesign that area. And guess wht i saw just after passing the rimbayu roundabout.... A small wild boar! Crossing the road from ES land towards the river. So cute but meaning their home will be destroyed soon 😞 sunroof must be good quality with high heat rejection. Otherwise.. heat is coming ... lol
|
|
|
|
|
|
akh731
|
Feb 6 2015, 01:21 PM
|
|
QUOTE(waiDEE @ Feb 6 2015, 12:37 PM) yup blue is <13m... indicate area Rimbayu is generally 13m above MSL... if u put other town, it will calculate height for that particular area... u can test for kajang... there is valley in the middle of kajang... when heavy rain and the river flow is slow, the ground water table increase in that area...that is why accumulate water and flooded... for Chimes, there are area is under cut land and area under filled land...
|
|
|
|
|
|
akh731
|
Feb 6 2015, 01:21 PM
|
|
Phase 2 is mostly cut land
|
|
|
|
|
|
akh731
|
Feb 6 2015, 04:51 PM
|
|
QUOTE(waiDEE @ Feb 6 2015, 04:48 PM) technically not really... both cut and filled need time to have stability back... when the original land/hill flatten, it less load and make it tendency to uplift... while for filled land, it has tendency to deposit or mendap... so proper earth work and soil investigation perhaps have been taken seriously earlier before... filled area is with piling cut is pad footing foundation. If need to do extension, better discuss with developer, to avoid different settlement.
|
|
|
|
|
|
akh731
|
Feb 9 2015, 08:28 AM
|
|
HTC is cut through both.. TA and ES
|
|
|
|
|
|
akh731
|
Feb 9 2015, 03:34 PM
|
|
QUOTE(Dragonfly2014 @ Feb 9 2015, 03:33 PM) the developer not build it...what to do? Washing machine location is one we have to be careful. Water leakage will damage cabinet if it locate beside it...look nice...but...later u know... my question is why developer not consider that, build la power and water supply on dedicate area.. buyer no need hack here and there pull cable or watever... washing machine is a must in every household jo la oh. part of renovation to connect the sanitary pipe.. problem is need to hack the floor tiles.
|
|
|
|
|
|
akh731
|
Feb 11 2015, 08:54 AM
|
|
QUOTE(eastken @ Feb 11 2015, 12:23 AM) not periwinkle. Should be wisteria. Periwinkle phase 3a fully sold out, 3b just open 1 months ++ taken rate also more than 40%, now not sure the update. wisteria last week 35% around, now not sure.  the unit sold did not take into consideration of 50% future Bumi Lot convert to Non Bumi Lot. before VP there could be developer unit to sell.. (price may increase little bit 30 to 50k). for flipper, this is not good signs as they need to pay more on interest, fee etc.
|
|
|
|
|
|
akh731
|
Feb 11 2015, 08:56 AM
|
|
QUOTE(phonixloo @ Feb 11 2015, 08:54 AM) Good point. If property market crash, then good for those looking for 'cheaper' house. Not good for current purchaser. For own stay, you will see a 'paper' loss. For investor looking for short-term gain or fast money, depend on their purchase price, will most probably 'burn hand' For long term investor, then really have to wait loh.....  market clash . if demand good will no problem... but BR still have allot of developer unit... so. not for flipper game.
|
|
|
|
|
|
akh731
|
Feb 11 2015, 02:14 PM
|
|
QUOTE(ape @ Feb 11 2015, 02:07 PM) Any advice, bro and sis: Wisteria (850k (after 4% rebate) , 23x80, LH, G&G) Vs Pentas 5 (880k, 25x85, FH, F&G) I am in dilemma now.... one is shah Alam, one is Jenjarom..
|
|
|
|
|
|
akh731
|
Feb 11 2015, 06:15 PM
|
|
aiyooo..
Fact is fact..
Shah Alam and Jenjarom is different
|
|
|
|
|
|
akh731
|
Feb 11 2015, 07:59 PM
|
|
QUOTE(Dragonfly2014 @ Feb 11 2015, 06:34 PM) eastken, the rimbayu no 1 fanc...hehe Found the map of Pentas 5, next to highway...not sure toll is build in and out not??? Got other alternative road if don't want pay toll? And it is near to commuter, good what... oso the spec for Pentas 5 seems better, timber door...timber flooring in rooms, if u like timber floor la.. Laksa highway mah.. you don't know? just pay toll loo
|
|
|
|
|
|
akh731
|
Feb 16 2015, 02:21 PM
|
|
I told is CCC right... no more CF..
|
|
|
|
|
|
akh731
|
Mar 6 2015, 07:31 AM
|
|
QUOTE(Jasoncat @ Mar 5 2015, 01:17 PM) Lol. IJM being a reputable developer sure will set up a proper guard house. Don't worry more than hundred units were bought by Ijm staff. They e must stay there unless they are flipper. Ha ha
|
|
|
|
|
|
akh731
|
Mar 9 2015, 03:17 PM
|
|
QUOTE(botack @ Mar 9 2015, 03:00 PM) interesting, jeghui took his key already but is not able to enter freely because Rela closed the access to Chimes, and his houses does not have TNB and Syabas meter installed yet.  when the water and electric meter to be in placed..
|
|
|
|
|
|
akh731
|
Mar 9 2015, 03:29 PM
|
|
QUOTE(botack @ Mar 9 2015, 03:25 PM) Am not sure bro. I think it is under owner directive maybe. But in S&P already stated water and electricity will be there when we are handed the keys. Maybe since Jeghui requested to be handed the keys earlier that they could not put in the meters on time.  S&P standard got loophole. VP does not specified the meters are in placed. VP specified that the utilities are ready for connection only..
|
|
|
|
|
|
akh731
|
Mar 9 2015, 03:34 PM
|
|
We cannot claim LAD, and die die also must take over the VP even no electric and water meters...
|
|
|
|
|
|
akh731
|
Mar 9 2015, 05:43 PM
|
|
QUOTE(phonixloo @ Mar 9 2015, 05:35 PM) This week will have another batch of 100+ ppl going to take key. Next week 200+. Last batch the balance. All key will hand over within this month  key handed with meters?
|
|
|
|
|
|
akh731
|
Mar 19 2015, 07:14 PM
|
|
from the photo, you can imaging how you can watch tv with that wall and window...
really disappointed.
|
|
|
|
|
|
akh731
|
Apr 1 2015, 07:35 PM
|
|
QUOTE(Nat6699 @ Apr 1 2015, 06:04 PM) A desperate flipper  Leased hold house.. take months to complete the sales and purchase process
|
|
|
|
|
|
akh731
|
Apr 15 2015, 08:07 PM
|
|
The mosque at the town centre.
The surau is just beside chime (left hand top corner)
|
|
|
|
|