QUOTE(waiDEE @ Jan 27 2015, 02:03 PM)
ya lorr... i'm expecting concrete imprint as well...
if we highlight to IJM...are they willing to change? 526 unit for chimes...
currently i'm questioning them about street at the end of corner lot... some tarmac finishing and some brick finishing...but location & situation is the same... beside green area...
[attachmentid=4319448]
red circle is tarred...mostly in 24x75 and blue circle is bricked...mostly in 22x75...
both... some connected with 2 road...and some not connected...
[attachmentid=4319451]
[attachmentid=4319452]
If someone doing the coordination, am sure many here will chip and and support. Larger voices is easier to be heard.
- so far the cheap fence
- car porch with cement.
Anything else? Despite it is not in SnP- am sure we can make some fuss interm of build & material quality
I've made a visit to the house today and manage to view the inside. Generally the work quality are decent.
Floor tiles are even, no holo, walls are flat and smooth, windows frame fits properly, toilet fittings are ok. The material used, are not top notch (though not sure are we suppose to expect of such). TQuite a few workers doing touch up post their internal QA/QC, so they not really handover just like tat and fix upon your complain. Will post the photo when i am free.
As for the street at end of corner lot- it could be hard to influnce IJM to do anything- as those is in public area.
They are doing the landscaping, planting many trees.
The water meter is not installed yet, so is the electrical connections. Hope they are in time for early March.
(note: Many unpleasent sight of Jalan Mati sign- am sure we can quitely remove them right?)