QUOTE(iwubpreve @ Apr 26 2016, 09:40 AM)
for residential condominium, example XXX Condominium that consist of 3 block, it has to be complete the 3 block then only it will get the CCC (certificate of completion compliance). then VP will take place and u get the key. however in certain scenario partial completion could be allowed by authority.
I believe u talk about different project. just another block built at adjacent to the completed 1.
u will never know whether they done piling or not as u have no access to the drawing. ur management office do have a set of as built drawing copy. which mean what had been actually built would be recorded in the that set of drawing. and this case u just need to have faith they done the work thoroughly. just like having faith when u cross the green traffic light, opposite car won't against the red light and bang u.

Nope. I'm talking about a XXX Condo that have 3 blocks and it will have one block completed later than the other two. Launching of the 3rd block is being delayed.
According to them, the first 2 blocks will be delivered as per schedule, but the 3rd block will be built up meanwhile.
They are using the space of the 3rd block to house their cement plant and etc.
I guess I have to have some faith. Haha. and hope they are not stupid/too greedy.
QUOTE(iwubpreve @ Apr 26 2016, 09:50 AM)
I think when they going to do the piling work, if there are building close to the project they will use hydraulic jack piling method. more pricey method of driving the pile. it won't cause much vibration like usual hammering method.
Ooooo. learnt sumting new today. I thought piling was always the hammering type~~~