Outline ·
[ Standard ] ·
Linear+
Investment SETIA ECOHILL (VERSION 10), An Inspiring Eco Township in Semenyih
|
g_four
|
Nov 11 2014, 10:48 AM
|
Getting Started

|
QUOTE(sridoughnut @ Nov 10 2014, 05:38 PM) Most of Saraca 1 at the last row have not been taken up. Corner lots I think still got 3~4, on the last two rows. Actually if you look at Google map street view (Jalan Rinching Hulu, Semenyih, Selangor) and move along toward the end of that jalan kampong, you will see the land was elevated quite high - I would say ~ 30 ft, so no problem with privacy. In fact, I think it will be very windy, and very nice kampong houses (only few houses scatted around) and green jungle view. Street View Sarace Back Rownice hill..perhaps will not happen land slide later on..
|
|
|
|
|
|
g_four
|
Nov 11 2014, 02:09 PM
|
Getting Started

|
Just realize after this has has to pay RM4.40 for tol fare everytime go in and out to SEH using LEKAS.. 1. at Plaza tol Kajang Selatan (RM1.10) 2. at Plaza to Semenyih (RM1.10)
|
|
|
|
|
|
g_four
|
Nov 11 2014, 02:49 PM
|
Getting Started

|
QUOTE(samkps @ Nov 11 2014, 02:41 PM) ??? From Kajang Selatan toll to Semenyih toll = RM 1.10 From Semenyih toll to Kajang Selatan toll = RM 1.10 Total RM 2.20, mana cari RM 4.40??  My mistake la like that..Only paid when exit.. never try LEKAS before this.. Sorry. TQ sam.
|
|
|
|
|
|
g_four
|
Nov 11 2014, 03:28 PM
|
Getting Started

|
QUOTE(samkps @ Nov 11 2014, 03:14 PM) Different design, different buildup, different material spec, buy on personal preference nia.. SEH generally have lower entry price compare to EM.. The built up size make it different.. Still up to your choice.. e.g: SEH 22x75 BU 2065 vs EM 20x70 BU 2173sf & vs EM 22x70 BU 2483sf For SEH, u'II have backyard 5ft and lower basic price than EM.
|
|
|
|
|
|
g_four
|
Nov 11 2014, 04:35 PM
|
Getting Started

|
QUOTE(samkps @ Nov 11 2014, 04:23 PM) Anyone kno the price for cradelton last time launched? 1A 20x70, 1B 22x70, 1C 22x75 and 1D 24x75
|
|
|
|
|
|
g_four
|
Nov 11 2014, 05:03 PM
|
Getting Started

|
QUOTE(Jasoncat @ Nov 11 2014, 04:52 PM) 1A -RM590k 1B -RM660k 1C -RM730k 1D -RM790k TQVM.
|
|
|
|
|
|
g_four
|
Nov 11 2014, 05:26 PM
|
Getting Started

|
QUOTE(hello-hello92 @ Nov 11 2014, 05:21 PM) SEH rebate 3% EM rebate 4% correct me if iam wrong...
|
|
|
|
|
|
g_four
|
Nov 13 2014, 05:25 PM
|
Getting Started

|
QUOTE(Palmwalker001 @ Nov 13 2014, 09:17 AM) Make sure you go early for Broga Hill or else you will be sun burn or miss the following beautiful scene. How early need to go out to make sure beautiful scene is there..
|
|
|
|
|
|
g_four
|
Nov 19 2014, 08:51 AM
|
Getting Started

|
Saraca still have few units available as well.. Went there last Sunday.. Attached thumbnail(s)
|
|
|
|
|
|
g_four
|
Nov 25 2014, 10:15 AM
|
Getting Started

|
QUOTE(Chris Chew @ Nov 25 2014, 09:56 AM) Not the whole car porch is considered as part of the built up. Only covered area under the car porch roof. 22x75 : Land size bigger, built up size length shorten, porch size length longer, with backyard. 22x70 : Land size smaller, built up size length longer, porch size length shorten without backyard prefer with wide size rarther than narrow and extra size of car porch plus a backyard ~ 22x75
|
|
|
|
|
|
g_four
|
Nov 25 2014, 11:02 AM
|
Getting Started

|
QUOTE(Jasoncat @ Nov 25 2014, 10:34 AM) Which type that you are comparing? Afaik, the coming new launching (3 types) is 20x70, Saraca launched recently is 22x75, and there is no 22x70 launched so far for SEH project  Correct me if I'm wrong. actually I am comparing Saraca with Begonia/Bellucia/Bartonia. Sorry my mistake. its suppose 20x70.. for 20x70 most design apprently used of Saraca 2 conceptual especially ground floor.. correct me if im wrong.
|
|
|
|
|
|
g_four
|
Nov 27 2014, 05:24 PM
|
Getting Started

|
QUOTE(PeriPeri2014 @ Nov 27 2014, 04:59 PM) i think so......  All one speculate only..
|
|
|
|
|
|
g_four
|
Nov 28 2014, 04:38 PM
|
Getting Started

|
QUOTE(doomdoom @ Nov 28 2014, 04:31 PM) eco majestic offer how many% discount? i wonder if compare to EM and SEH, for the similar price tag producsts, whcih project need to fork up higher downpayment? With 3 % EB and 7% Bumi. Attached thumbnail(s)
|
|
|
|
|
|
g_four
|
Nov 28 2014, 07:14 PM
|
Getting Started

|
QUOTE(wen xuan @ Nov 28 2014, 07:03 PM) New event  [attachmentid=4236900] Open email box and see the same..Btw, this one need to call and give confirmation first or walk in?
|
|
|
|
|
|
g_four
|
Nov 28 2014, 11:37 PM
|
Getting Started

|
QUOTE(wen xuan @ Nov 28 2014, 11:20 PM) Just back from there..... If keep on raining it will be very cold, for whom wanna go there better prepare blanket ya  Never mind.. this Forum LYN getting hoter and hoter.... Sure it could be warmed some of us...
|
|
|
|
|