QUOTE(Low Yat Group @ Feb 4 2015, 11:30 PM)
Hi treblecase and to all who have posted on this subject,
As we have clarified numerous times on this matter, let us repeat once again that the Latar interchange will definitely be constructed and it is not a sales gimmick as some claimed. LYG have not only invested substantially but will be courting trouble if the interchange does not materialize as we have publicly announced the interchange will be constructed. We have said before that the relevant parties are resolving the land matter, and hopefully it will be resolved soon in the next few months. An announcement will be made once this is resolved.
*
Thank you & apologies for harping on this matter repeatedly. Me & I'm sure others here may be forgiven for stressing on the importance of this interchange. If I may speak on behalf of all concern buyers here, I think it's only fair that we give LYG the benefit of doubt for the time being. Let's move on to other subject while waiting for the matter to resolve. Thank you again LYG for your patience in answering our questions.
TSLow Yat Group
post Feb 5 2015, 07:39 PM

Casual
***
Junior Member
361 posts

Joined: Aug 2014
QUOTE(putera tasik puteri @ Feb 5 2015, 01:02 AM)
Thank you atas segala jawapan jawapan dari pihak Admin LYG
Walaupun lambat jawab saya tunggu sampai 5 hari.

So Admin LYG lepas ni tugas awak adalah supaya mengupdate  segala aktiviti kerja pemulihan jalan,lanskap,lampu jalan,susur Latar dan segala perkara yang anda nyatakan tadi,saya syorkan pihak anda hendaklah mengupdate setiap 2 minggu sekali dan sertakan gambar gambar aktiviti tersebut di laman forum LYN ini tanpa gagal bermula minggu ini dan ingat bukan hanya di garden height sahaja tetapi di Green Valley Park yang dah lama terbiar ni ok.Dengan cara ni kita semua dalam forum ni dapat maklumat dan gambaran yang sejelas jelasnya.lepas ni takdalah LYG Kena complain banyak banyak.

Sekian Majulah BTP untuk semua
*
Hi PTP, for your information many of the apartments especially in GVP (strata title) with JMB formed have not paid their service fee for so many years until the amount owed to LYG has accumulated to $millions. If LYG ignored these apartments then you will find that rubbish will not be collected, lallangs and trees are not pruned, compound street lighting will not be repaired, and in areas where there is lifts, nobody will come to service etc. LYG has assisted the JMBs to pay many of these charges so that these areas will be clean and hygienic. By right LYG need not be involved once JMB is formed. Being a responsible developer LYG wants to see that GVP is kept clean with a healthy environment and all visitors to GVP will be impressed with this neighborhood.

Anyway we will continue to post and keep everyone informed of any progress achieved.
By the way PETRONAS service station is ready for opening tomorrow.
Please go and give your full support.

This post has been edited by Low Yat Group: Feb 5 2015, 07:41 PM
TSLow Yat Group
post Feb 5 2015, 07:52 PM

Casual
***
Junior Member
361 posts

Joined: Aug 2014
QUOTE(treblecase @ Feb 5 2015, 06:34 PM)
Thank you & apologies for harping on this matter repeatedly. Me & I'm sure others here may be forgiven for stressing on the importance of this interchange. If I may speak on behalf of all concern buyers here, I think it's only fair that we give LYG the benefit of doubt for the time being. Let's move on to other subject while waiting for the matter to resolve. Thank you again LYG for your patience in answering our questions.
*
Hi treblecase, LYG certainly understands that the Latar interchange is of utmost importance to all. It is even more important to LYG as this will be the catalyst where we can plan for our future launches, where we still have more than 1,200 acres of undeveloped land. We will not stop until the interchange is fully completed, that is our commitment to all residents/investors. Further there is absolutely no reason for us to delay, as the sooner it is completed the more benefits LYG and the residents will enjoy, with the appreciation in property prices.
Yuin Chuan See
post Feb 5 2015, 07:56 PM

Getting Started
**
Junior Member
290 posts

Joined: Oct 2014


QUOTE(Nation of Sensation @ Feb 5 2015, 12:38 PM)
In a few months time, the Sg.Serai interchange (which connects to the PLUS Rawang Selatan highway) will be completed and it might be useful for those BTP folks as well.  rclxms.gif
*
Great information, bro!!! biggrin.gif Hope to get the actual date of completion. biggrin.gif
FirstHome
post Feb 5 2015, 08:04 PM

Getting Started
**
Junior Member
170 posts

Joined: Oct 2014
QUOTE(Low Yat Group @ Feb 4 2015, 11:30 PM)
Hi treblecase and to all who have posted on this subject,
As we have clarified numerous times on this matter, let us repeat once again that the Latar interchange will definitely be constructed and it is not a sales gimmick as some claimed. LYG have not only invested substantially but will be courting trouble if the interchange does not materialize as we have publicly announced the interchange will be constructed. We have said before that the relevant parties are resolving the land matter, and hopefully it will be resolved soon in the next few months. An announcement will be made once this is resolved.
*
TQ LYG for your reply.

Yuin Chuan See
post Feb 5 2015, 08:13 PM

Getting Started
**
Junior Member
290 posts

Joined: Oct 2014


QUOTE(FirstHome @ Feb 5 2015, 08:04 PM)
TQ LYG for your reply.
*
Same here. TQ LYG admin for the strong and powerful feedback.

Dear FirstHome, I already obtained my copy for S&P today. biggrin.gif
FirstHome
post Feb 5 2015, 08:22 PM

Getting Started
**
Junior Member
170 posts

Joined: Oct 2014
QUOTE(Yuin Chuan See @ Feb 5 2015, 08:13 PM)
Same here. TQ LYG admin for the strong and powerful feedback.

Dear FirstHome, I already obtained my copy for S&P today. biggrin.gif
*
Wah lucky you.. Congrats bro! I hope to get mine soon.
FirstHome
post Feb 5 2015, 08:25 PM

Getting Started
**
Junior Member
170 posts

Joined: Oct 2014
BTP full page ad on Oriental Daily News today!Attached Image
Yuin Chuan See
post Feb 5 2015, 08:26 PM

Getting Started
**
Junior Member
290 posts

Joined: Oct 2014


QUOTE(FirstHome @ Feb 5 2015, 08:25 PM)
BTP full page ad on Oriental Daily News today!Attached Image
*
Thanks for sharing!!! biggrin.gif rclxms.gif rclxms.gif rclxms.gif It is a beautiful piece of art work.
n3utronic
post Feb 5 2015, 10:12 PM

Getting Started
**
Junior Member
58 posts

Joined: May 2005


wondering if there is any update to the complaint on leaking houses from GH phase 2 residents like a month back.

perhaps the complainants or LYG can shed some lights?
Yuin Chuan See
post Feb 5 2015, 10:17 PM

Getting Started
**
Junior Member
290 posts

Joined: Oct 2014


QUOTE(n3utronic @ Feb 5 2015, 10:12 PM)
wondering if there is any update to the complaint on leaking houses from GH phase 2 residents like a month back.

perhaps the complainants or LYG can shed some lights?
*
Dear n3utronic,
We have to wait patiently.

QUOTE(Yuin Chuan See @ Jan 25 2015, 10:35 AM)
Dear Ms/Mdm. Do you mind to share with us the update of the defect repairing by LYG? Sorry if I have bothered you.

Hi Chuan See, rectification of defects, usually takes about a month. As for house renovation ideally, should wait until the defects have been repaired. For small renovation jobs such as built in cabinets etc where it is just loose items will not void the DLP, unless you start to hack the wall/floor where there is a possibility of damaging the pipes/electrical cabling.

This post has been edited by Yuin Chuan See: Feb 5 2015, 10:21 PM
layho0n
post Feb 5 2015, 10:26 PM

New Member
*
Junior Member
9 posts

Joined: Nov 2014


Hi LYG,

Would like to know how can we get the detailed floor plan with measurement instead of the one in S&P? This is because we have to provide the kitchen measurement in order to get quotation for our kitchen cabinet. I've called to the admin before and she just asked me to refer back to the S&P, which is apparently lacking of this piece of information.

Hi all, just an update on the water leaking issue at my house as I thought some of the other owners might have faced similar issue. The contractor came to fix the defects in less than a month which surprised us. However, we see a slight different colour of floor tile being replaced, darker in colour as compared to the original one. Not a big issue for us but hoping that LYG shall be more careful in choosing the material. No longer seeing water marks at home but we think that the painting job wasn't done properly:

First floor bathroom
Before:
Attached Image

After:
Attached Image


Master bathroom
Before
Attached Image

After
Attached Image

Bedroom 2 ceiling
Before
Attached Image

After
Attached Image


Hopefully there's no more defects found in the house and we can start the renovation work soonest sweat.gif
TSLow Yat Group
post Feb 5 2015, 11:51 PM

Casual
***
Junior Member
361 posts

Joined: Aug 2014
QUOTE(layho0n @ Feb 5 2015, 10:26 PM)
Hi LYG,

Would like to know how can we get the detailed floor plan with measurement instead of the one in S&P? This is because we have to provide the kitchen measurement in order to get quotation for our kitchen cabinet. I've called to the admin before and she just asked me to refer back to the S&P, which is apparently lacking of this piece of information.

Hi all, just an update on the water leaking issue at my house as I thought some of the other owners might have faced similar issue. The contractor came to fix the defects in less than a month which surprised us. However, we see a slight different colour of floor tile being replaced, darker in colour as compared to the original one. Not a big issue for us but hoping that LYG shall be more careful in choosing the material. No longer seeing water marks at home but we think that the painting job wasn't done properly:

First floor bathroom
Before:
Attached Image

After:
Attached Image
Master bathroom
Before
Attached Image

After
Attached Image

Bedroom 2 ceiling
Before
Attached Image

Hi Layhoon, what our sales staff commented is correct. Developers do not provide the detail building plan to buyers. For measurement of kitchen cabinet, the practice is to measure by tape the length and height of the area, and the cabinet supplier will provide you with the detail cabinet design plans for your approval. Normally the supplier will go and measure the area themselves as the measurement must be correct.  As for the different shades in colour of the tiles, for your information even if the tile code is correct you may not get the exact matching colour code, simply because the production of the tiles come in batches, and it is bound to have a slight variation during production for each batch. We will remind the contractor to ensure the painting job is well done. Point taken.

As we have informed earlier we are targeting all defects rectification to be completed within a month except serious defects like hacking of walls/floors which might take a little longer. For the defects mentioned by you will usually take about a month as it is considered a minor defect. Further we have also increased the defects rectification team to hasten the completion.



After
Attached Image
Hopefully there's no more defects found in the house and we can start the renovation work soonest  sweat.gif
*
Yuin Chuan See
post Feb 6 2015, 06:42 AM

Getting Started
**
Junior Member
290 posts

Joined: Oct 2014


Thank you for sharing the information with us, Ms. layhoOn. It is a really practical reference to us. icon_idea.gif
Thank you for LYG also for showing commitment in rectifying the defects effectively. flex.gif
leekk8
post Feb 6 2015, 02:48 PM

Regular
******
Senior Member
1,059 posts

Joined: Mar 2006
From: KL


QUOTE(FirstHome @ Feb 5 2015, 08:25 PM)
BTP full page ad on Oriental Daily News today!Attached Image
*
What event is this? Got more detailed info?
Favo
post Feb 6 2015, 05:17 PM

New Member
*
Junior Member
26 posts

Joined: May 2012
QUOTE(Low Yat Group @ Feb 5 2015, 07:52 PM)
Hi treblecase, LYG certainly understands that the Latar interchange is of utmost importance to all. It is even more important to LYG as this will be the catalyst where we can plan for our future launches, where we still have more than 1,200 acres of undeveloped land. We will not stop until the interchange is fully completed, that is our commitment to all residents/investors. Further there is absolutely no reason for us to delay, as the sooner it is completed the more benefits LYG and the residents will enjoy, with the appreciation in property prices.
*
Hi LYG, I have PM you on 24/12/2014 but still did not receive your reply until now. Please advise. Thanks.
TSLow Yat Group
post Feb 6 2015, 08:48 PM

Casual
***
Junior Member
361 posts

Joined: Aug 2014
QUOTE(Favo @ Feb 6 2015, 05:17 PM)
Hi LYG, I have PM you on 24/12/2014 but still did not receive your reply until now. Please advise. Thanks.
*
Hi Favo, sorry we cannot locate your posting, could you please repost again and we will try to answer your question.
TSLow Yat Group
post Feb 6 2015, 09:16 PM

Casual
***
Junior Member
361 posts

Joined: Aug 2014
QUOTE(leekk8 @ Feb 6 2015, 02:48 PM)
What event is this? Got more detailed info?
*
Hi leekk8, this special event is to celebrate the CNY, which is a Goat Year, hence we call it Goat Year Reunion. Only for this 2 days happening on 28th February 2015, we will be very generous in giving away "ang pows" in the form of rebate if any bookings are made for any houses in Garden Heights, Acacia Park and Seiring East.

For more information come to our Sales Gallery and hear more of the promotions we have laid out for you. As usual there will be refreshments, a Lion Dance, Acrobatic shows, Fire crackers and the 'God of Prosperity' will be wishing luck and more prosperity to all our guests. In addition we will also be having lucky draws for all existing and new buyers of Garden heights, Acacia park and Seiring as a token of our appreciation and confidence in BTP. There will be advertisements in the newspapers, flyers, buntings and website to highlight this event.

Please invite your family and friends to come and join in this auspicious event, and be a part of BTP Family. We look forward to your presence in this joyous occasion. Lets celebrate this CNY together. More Good Health, Prosperity and Happiness to All our residents, buyers and investors in the year of the goat.

This post has been edited by Low Yat Group: Feb 6 2015, 09:18 PM
n3utronic
post Feb 6 2015, 11:43 PM

Getting Started
**
Junior Member
58 posts

Joined: May 2005


QUOTE(Low Yat Group @ Feb 5 2015, 09:51 AM)

*
thanks layhoon & LYG for sharing the info.
it is good to see LYG's commitment to rectify the defect with less than a month turnover. though i think the workmanship of the repair can be improved smile.gif smile.gif smile.gif
BTP14
post Feb 7 2015, 01:49 AM

New Member
*
Junior Member
48 posts

Joined: Nov 2014
Just to confirm that the BTP Petronas Station finally commence their operation on 6 February 2015. thumbup.gif

Attached Image

From my observation, the station comes with 5 fuel tanks with 20 nozzles, Kedai Mesra & ATM. According to the staff, for now they try to operate on 24/7.



To LYG, perhaps you can response to my following queries:

1. Your response on the Dewan is referred, can you provide the target dateline for MPS to build the Dewan. It will be more meaningful rather than share the MPS intend.

2. How about BTP second secondary school? I had raised this before on 31 January 2015 but yet to get your response.

Many Thanks!

90 Pages « < 74 75 76 77 78 > » Top
Topic ClosedOptions
 

Change to:
| Lo-Fi Version
0.1434sec    0.34    6 queries    GZIP Disabled
Time is now: 8th December 2025 - 03:09 AM