commercial job completed in 2 1/2 months comprise of: -
Tiling and wetwork
bathroom makeover
vinyl flooring
painting
plaster ceiling and partition
lighting and electrical
air-conditioning and ventilation
boiler heater and rain shower
wall panelling and spray painting
custom design cabinet and furniture
titanium, gold and mirror finished stainless steel panelling and frame
laser cutting
acrylic lighting product display
gold plated trim and frame
brass gold backlit and light box signage
glass doors
sliding doors
aluminium sliding door
stainless steel door frame
cctv and PA system
marble and solid surface
window tinting
Attached thumbnail(s)